Current A/E Selection Opportunities and Results - $7.4 Million and Above

Project No.: 23G2R
Project Name: Wisconsin National Guard Challenge Academy
Institution: MILITARY AFFAIRS/FORT MCCOY
Location: TOWN OF GREENFIELD, Wisconsin
Construction Cost: $23,000,000
AE Submittal Date: 3/25/2024 2:30:00 PM
Last Item Update: 2/28/2024 3:27:01 PM
Comments: Documents open best using MicroSoft browsers
Invitation file: 23G2R_Qualification_Solicitation.docx (172 kB)
Support file 1: 23G2R_AE_Service_Request.pdf (342 kB)
Support file 2: 23G2R_AE_Contract.pdf (167 kB)
Support file 3: 23G2R_Screening_Form.xlsx (27 kB)
Support file 4: 23G2R_Fee_Rate_Sheet.xlsx (36 kB)
Support file 5: 23G2R_Qualification_Solicitation.pdf (443 kB)
Support file 6: 23G2R_Screening_Form.pdf (139 kB)
Support file 7: 23G2R_Fee_Rate_Sheet.pdf (135 kB)
Click here for a list of AEs interested in this project.

Project No.: 23K1L
Project Name: Wyllie Hall Renovation Completion (Levels L1/L2/L3)
Institution: UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
Location: CITY OF KENOSHA, Wisconsin
Construction Cost: $23,134,000
AE Submittal Date: 2/22/2024 2:30:00 PM
Last Item Update: 2/28/2024 1:59:57 PM
AE Submitting Qualifications: Dimension IV Madison Design Group, in assoc. with DLR Group
Strang, Inc.
Workshop Architects, Inc.
AE Shortlist: Dimension IV Madison Design Group, in assoc. with DLR Group, Strang, Inc., Workshop Architects, Inc.

Project No.: 23K2J
Project Name: WMHI Utility and Service Tunnel Improvements
Institution: HEALTH SERVICES/WINNEBAGO MENTAL HEALTH INSTITUTE
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $34,306,000
AE Submittal Date: 1/26/2024 2:30:00 PM
Last Item Update: 1/31/2024 1:51:06 PM
AE Submitting Qualifications: Affiliated Engineers, Inc.
Ring & DuChateau, LLP
AE Shortlist: Affiliated Engineers, Inc., Ring & DuChateau, LLP

Project No.: 23F2R
Project Name: Food Service Building Renovation
Institution: BUILDING COMMISSION/
Location: CITY OF MADISON, Wisconsin
Construction Cost: $28,943,000
AE Submittal Date: 9/26/2023 2:30:00 PM
Last Item Update: 1/3/2024 4:14:17 PM
AE Submitting Qualifications: Assemblage Architects
Ramlow/Stein, Inc.
AE Shortlist: Assemblage Architects, Ramlow/Stein, Inc.
Selected AE: Ramlow/Stein, Inc.

Project No.: 23G1C
Project Name: MMHI Utility Improvements
Institution: HEALTH SERVICES/MENDOTA MENTAL HEALTH INSTITUTE, MADISON
Location: CITY OF MADISON, Wisconsin
Construction Cost: $15,585,000
AE Submittal Date: 9/5/2023 2:30:00 PM
Last Item Update: 12/8/2023 12:49:17 PM
AE Submitting Qualifications: Affiliated Engineers, Inc.
Ring & DuChateau, LLP
AE Shortlist: Affiliated Engineers, Inc., Ring & DuChateau, LLP
Selected AE: Affiliated Engineers, Inc.

Project No.: 23D1J
Project Name: Sentry Hall Modernization
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $29,918,000
AE Submittal Date: 7/27/2023 2:30:00 PM
Last Item Update: 10/4/2023 8:46:55 AM
AE Submitting Qualifications: Aro Eberle Architects
BWBR Architects, Inc.
Hammel, Green and Abrahamson, Inc.
JGMA
OPN Architects, Inc.
Ramlow/Stein, Inc.
SmithGroup, Inc.
Somerville, Inc.
Strang, Inc.
Workshop Architects, Inc.
AE Shortlist: Aro Eberle Architects, Hammel, Green and Abrahamson, Inc., OPN Architects, Inc.
Selected AE: Aro Eberle Architects

Project No.: 22D5A DB-GPC
Project Name: Camp Randall Sports Center Replacement
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost:  
AE Submittal Date: 6/26/2023 1:00:00 PM
Last Item Update: 1/30/2024 1:40:27 PM
Selected AE: JP Cullen & Sons, Inc.

Project No.: 22E1L
Project Name: Polk Library Facility Renewal
Institution: UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $73,371,000
AE Submittal Date: 6/2/2023 2:30:00 PM
Last Item Update: 8/23/2023 2:19:15 PM
AE Submitting Qualifications: BWBR Architects, Inc. in assoc. with Shepley Bulfinch
Engberg Anderson, Inc.
InSite Consulting Architects, LLC in assoc. with CannonDesign
OPN Architects, Inc. in assoc. with Annum Architects
Potter Lawson, Inc.
Strang, Inc. in assoc. with Steinberg Hart
Workshop Architects, Inc.
Zimmerman Architectural Studios, Inc. in assoc. with HBM Architects, LLC
AE Shortlist: InSite Consulting Architects, LLC in assoc. with CannonDesign, OPN Architects, Inc. in assoc. with Annum Architects, Workshop Architects, Inc.
Selected AE: InSite Consulting Architects, LLC in assoc. with CannonDesign

Project No.: 22G2W
Project Name: New Student Dormitory
Institution: PUBLIC INSTRUCTION/SCHOOL FOR THE DEAF, DELAVAN
Location: CITY OF DELAVAN, Wisconsin
Construction Cost: $21,730,700
AE Submittal Date: 5/22/2023 4:30:00 PM
Last Item Update: 8/2/2023 2:20:04 PM
AE Submitting Qualifications:

Angus Young Associates, Inc.
Assemblage Architects
Engberg Anderson, Inc.
Eppstein Uhen Architects

Hammel, Green and Abrahamson, Inc.
LHB, Inc.
Plunkett Raysich Architects
Ramlow/Stein, Inc.

AE Shortlist: Angus Young Associates, Inc., Hammel, Green and Abrahamson, Inc., Ramlow/Stein, Inc.
Selected AE: Angus Young Associates, Inc.

Project No.: 21E2Y
Project Name: Health Science Renovations
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $114,268,000
AE Submittal Date: 5/8/2023 2:30:00 PM
Last Item Update: 6/27/2023 10:58:51 AM
AE Submitting Qualifications: Kahler Slater, Inc.
AE Shortlist: Kahler Slater, Inc.
Selected AE: Kahler Slater, Inc.

Project No.: 21K1P
Project Name: Chiller Replacement, Central Heating Plant
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $13,360,000
AE Submittal Date: 7/25/2022 2:30:00 PM
Last Item Update: 10/4/2022 3:12:06 PM
AE Submitting Qualifications: Affiliated Engineers, Inc.
Hammel, Green and Abrahamson, Inc.
KFI Engineers, Inc.
Ring & DuChateau, LLP
Salas O’Brien North, LLC
AE Shortlist: Affiliated Engineers, Inc., Hammel, Green and Abrahamson, Inc., Ring & DuChateau, LLP
Selected AE: Ring & DuChateau, LLP

Project No.: 21I2Q R
Project Name: Wisconsin Vet Diagnostic Lab Renovation and Expansion - Barron
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: TOWN OF BARRON, Wisconsin
Construction Cost: $7,372,000
AE Submittal Date: 6/23/2022 2:30:00 PM
Last Item Update: 9/27/2022 4:28:57 PM
AE Submitting Qualifications: Cedar Corporation in assoc. with MSR Design
Design Engineers in assoc. with INVISION Architecture
AE Shortlist: Cedar Corporation in assoc. with MSR Design, Design Engineers in assoc. with INVISION Architecture
Selected AE: Design Engineers in assoc. with INVISION Architecture

Project No.: 17L1L
Project Name: Central Services Kitchen Remodel
Institution: VETERANS AFFAIRS/WISCONSIN VETERANS HOME-KING
Location: TOWN OF FARMINGTON, Wisconsin
Construction Cost: $8,916,800
AE Submittal Date: 4/25/2022 2:30:00 PM
Last Item Update: 7/11/2022 2:13:46 PM
AE Submitting Qualifications: Assemblage Architects
Boer Architects, Inc.
AE Shortlist: Assemblage Architects, Boer Architects, Inc.
Selected AE: Assemblage Architects

Project No.: 21L3J
Project Name: Engineering Building Replacement
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $192,444,000
AE Submittal Date: 3/4/2022 2:30:00 PM
Last Item Update: 5/19/2022 4:33:25 PM
AE Submitting Qualifications: Aro Eberle Architects in assoc. with Ballinger
Continuum Architects + Planners in assoc. with SmithGroup and Ring & DuChateau, LLP
Eppstein Uhen Architects in assoc. with Pelli Clarke & Partners
Flad Architects
Hammel, Green and Abrahamson, Inc.
Kahler Slater, Inc. in assoc. with LMN Architects
OPN Architects, Inc. in assoc. with ZGF
Plunkett Raysich Architects in assoc. with Ennead Architects
AE Shortlist: Continuum Architects + Planners in assoc. with SmithGroup and Ring & DuChateau, LLP, Flad Architects, Hammel, Green and Abrahamson, Inc., OPN Architects, Inc. in assoc. with ZGF
Selected AE: Continuum Architects + Planners in assoc. with SmithGroup and Ring & DuChateau, LLP

Project No.: 21I1H
Project Name: New Health Services Unit and Restrictive Housing Unit Expansion
Institution: CORRECTIONS/Wisconsin Secure Program Facility
Location: CITY OF BOSCOBEL, Wisconsin
Construction Cost: $5,600,000
AE Submittal Date: 1/21/2022 2:30:00 PM
Last Item Update: 3/3/2022 1:25:29 PM
AE Submitting Qualifications: Venture Architects
Selected AE: Venture Architects

Project No.: 19K2R
Project Name: Wisconsin History Center
Institution: HISTORICAL SOCIETY/HISTORICAL SOCIETY, MADISON
Location: CITY OF MADISON, Wisconsin
Construction Cost: $62,076,700
AE Submittal Date: 1/20/2022 2:30:00 PM
Last Item Update: 3/22/2022 3:46:35 PM
AE Submitting Qualifications:

Continuum Architects + Planners in assoc. with SmithGroup
Engberg Anderson, Inc. in assoc. with Allied Works Architecture, Inc.
Eppstein Uhen Architects in assoc. with Fentress Architects, Ltd.
Hammel, Green and Abrahamson, Inc.
InSite Consulting Architects, LLC in assoc. with MSR Design
Kahler Slater, Inc. in assoc. with SOM
MartinRiley Architects + Engineers in assoc. with Quinn Evans
OPN Architects, Inc. in assoc. with Adjaye Associates
Plunkett Raysich Architects in assoc. with Morphosis Architects
Potter Lawson, Inc. in assoc. with Perkins+Will

Quorum Architects, Inc. in assoc. with B.I.G. Architecture A.P.C.
Workshop Architects, Inc. in assoc. with Snohetta

AE Shortlist: Continuum Architects + Planners in assoc. with SmithGroup, Engberg Anderson, Inc. in assoc. with Allied Works Architecture, Inc., Hammel, Green, and Abrahamson, Inc., OPN Architects, Inc. in assoc. with Adjaye Associates
Selected AE: Continuum Architects + Planners in assoc. with SmithGroup

Project No.: 21H3C
Project Name: Sherman Hall Admissions Renovations
Institution: HEALTH SERVICES/WINNEBAGO MENTAL HEALTH INSTITUTE
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $13,107,000
AE Submittal Date: 12/1/2021 2:30:00 PM
Last Item Update: 3/3/2022 3:35:11 PM
AE Submitting Qualifications: Hammel, Green and Abrahamson, Inc.
Kehoe Henry & Associates, Inc.
Mead & Hunt, Inc. in association with BWBR
Zimmerman Architectural Studios, Inc.
AE Shortlist: Hammel, Green and Abrahamson, Inc., Kehoe Henry & Associates, Inc., Mead & Hunt, Inc. in association with BWBR, Zimmerman Architectural Studios, Inc.
Selected AE: Hammel, Green and Abrahamson, Inc.

Project No.: 21D3T
Project Name: Heritage Hall Addition & Renovation
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: CITY OF MENOMONIE, Wisconsin
Construction Cost: $77,514,000
AE Submittal Date: 11/16/2021 2:30:00 PM
Last Item Update: 2/8/2022 4:40:14 PM
AE Submitting Qualifications: BWBR Architects, Inc.
Dorschner Associates, Inc. in assoc. w/ Sasaki Associates, Inc.
Kahler Slater, Inc.
LHB, Inc.
River Architects, Inc.
River Valley Architects, Inc. in assoc. w/ HGA
AE Shortlist: Dorschner Associates, Inc. in assoc. w/ Sasaki Associates, Inc., Kahler Slater, Inc., River Architects, Inc., River Valley Architects, Inc. in assoc. w/ HGA
Selected AE: River Architects, Inc.

Project No.: 21H1L
Project Name: SRSTC Skilled Care Unit Expansion
Institution: HEALTH SERVICES/SECURE TREATMENT FACILITY, MAUSTON
Location: CITY OF MAUSTON, Wisconsin
Construction Cost: $9,696,000
AE Submittal Date: 11/8/2021 2:30:00 PM
Last Item Update: 1/11/2022 8:43:50 AM
AE Submitting Qualifications: Kehoe Henry & Associates Inc
Mead & Hunt, Inc.
Venture Architects
AE Shortlist: Mead & Hunt, Inc. in assoc. with BWBR, Venture Architects
Selected AE: Venture Architects

Project No.: 20K1R
Project Name: Recreation Complex: Remodeling and Addition
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: CITY OF MENOMONIE, Wisconsin
Construction Cost: $19,242,000
AE Submittal Date: 10/20/2021 2:30:00 PM
Last Item Update: 1/27/2022 2:37:02 PM
AE Submitting Qualifications: HSR Associates, Inc.
I & S Group, Inc. in assoc. with Hastings+Chivetta
Kahler Slater, Inc.
Ramlow/Stein, Inc.
River Valley Architects, Inc.
Shive-Hattery
SmithGroup, Inc.
AE Shortlist: HSR Associates, Inc., I & S Group, Inc. in assoc. with Hastings+Chivetta, Ramlow/Stein, Inc.
Selected AE: Ramlow/Stein, Inc.

Project No.: 21E2W
Project Name: Cofrin Technology & Education Center
Institution: UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
Location: CITY OF GREEN BAY, Wisconsin
Construction Cost: $72,727,000
AE Submittal Date: 9/1/2021 3:30:00 PM
Last Item Update: 11/22/2021 4:58:01 PM
AE Submitting Qualifications: Berners-Schober Associates, Inc.
Continuum Architects + Planners in assoc. with Gensler
Engberg Anderson, Inc. in assoc. with Shepley Bulfinch
Hammel, Green, and Abrahamson, Inc.
OPN Architects, Inc.
Somerville, Inc. in assoc. with Perkins + Will
Workshop Architects, Inc.
AE Shortlist: Berners-Schober Associates, Inc., Engberg Anderson, Inc. in assoc. with Shepley Bulfinch, Hammel, Green, and Abrahamson, Inc.
Selected AE: Engberg Anderson, Inc. in assoc. with Shepley Bulfinch

Project No.: 21E1Z
Project Name: Cemetery Improvements Phase VI
Institution: VETERANS AFFAIRS/SOUTHERN WI VETERANS MEMORIAL CEMETERY-UNION GROVE
Location: TOWN OF DOVER, Wisconsin
Construction Cost: $10,703,000
AE Submittal Date: 8/6/2021 2:30:00 PM
Last Item Update: 10/4/2021 4:01:14 PM
AE Submitting Qualifications: SmithGroup, Inc.
Stantec Consulting Services, Inc.
Tribute Design Systems, LLC in assoc. with Bloom Companies, LLC
AE Shortlist: SmithGroup, Inc., Stantec Consulting Services, Inc., Tribute Design Systems, LLC in assoc. with Bloom Companies, LLC
Selected AE: SmithGroup, Inc.

Project No.: 20J1T
Project Name: Parking Ramp and Building Addition
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $17,391,000
AE Submittal Date: 7/7/2021 2:30:00 PM
Last Item Update: 10/4/2021 4:11:12 PM
AE Submitting Qualifications: Bloom Companies, LLC
BWBR Architects, Inc.
Engberg Anderson, Inc. in assoc. with WGI, Inc.
GRAEF
AE Shortlist: Bloom Companies, LLC, BWBR Architects, Inc., Engberg Anderson, Inc. in assoc. with WGI, Inc., GRAEF
Selected AE: GRAEF

Project No.: 21C3B
Project Name: Engineering Drive Utilities Replacement and Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $41,379,000
AE Submittal Date: 5/5/2021 2:30:00 PM
Last Item Update: 8/19/2021 4:52:30 PM
AE Submitting Qualifications: Affiliated Engineers, Inc.
Ring & DuChateau, LLP
Shive-Hattery, Inc.
AE Shortlist: Affiliated Engineers, Inc., Ring & DuChateau, LLP, Shive-Hattery, Inc.
Selected AE: Shive-Hattery, Inc.

Project No.: 20K1G
Project Name: College of Letters & Science Academic Building
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $53,512,000
AE Submittal Date: 4/12/2021 2:30:00 PM
Last Item Update: 7/8/2021 3:02:54 PM
AE Submitting Qualifications: Berners-Schober Associates, Inc.
Continuum Architects + Planners in assoc. w/ Bohlin Cywinski Jackson
Dorschner Associates, Inc. in assoc. w/ Gensler
Engberg Anderson, Inc. in assoc. w/ Perkins+Will
Eppstein Uhen Architects in assoc. w/ RATIO
Flad Architects
Hammel, Green and Abrahamson, Inc.
InSite Consulting Architects, LLC in assoc. w/ JLG Architects
Korb + Associates Architects in assoc. w/ TWBTA
OPN Architects, Inc.
Ramlow/Stein, Inc. in assoc. w/ Bora Architecture & Interiors
SmithGroup, Inc.
Strang, Inc.
Workshop Architects, Inc. in assoc. w/ BNIM
Zimmerman Architectural Studios, Inc.
AE Shortlist: Continuum Architects + Planners in assoc. w/ Bohlin Cywinski Jackson, Flad Architects, Ramlow/Stein, Inc. in assoc. w/ Bora Architecture & Interiors, SmithGroup, Inc.
Selected AE: Ramlow/Stein, Inc. in assoc. w/ Bora Architecture & Interiors

Project No.: 20E2X
Project Name: Engineering Building Replacement Phase I
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $90,918,000
AE Submittal Date: 11/4/2020 3:30:00 PM
Last Item Update: 1/22/2021 3:46:50 PM
AE Submitting Qualifications: Aro Eberle Architects in assoc. w/ Ballinger
BWBR Architects, Inc. in assoc. w/ CannonDesign
Continuum Architects + Planners in assoc. w/ SmithGroup
Dorschner Associates, Inc. in assoc. w/ Sasaki Associates
Flad Architects
Hammel, Green and Abrahamson, Inc.
OPN Architects, Inc.
Plunkett Raysich Architects in assoc. w/ Ennead Architects
Ramlow/Stein, Inc. in assoc. w/ Payette Associates
Strang, Inc. in assoc. w/ Perkins+Will
Zimmerman Architectural Studios, Inc. in assoc. w/ HED
AE Shortlist: Aro Eberle Architects in assoc. w/ Ballinger, Hammel, Green and Abrahamson, Inc., OPN Architects, Inc., Plunkett Raysich Architects in assoc. w/ Ennead Architects
Selected AE: Aro Eberle Architects in assoc. w/ Ballinger

Project No.: 20D1B
Project Name: HVAC System Renovation
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $10,639,000
AE Submittal Date: 10/15/2020 2:30:00 PM
Last Item Update: 3/31/2021 8:30:16 AM
AE Submitting Qualifications: Design Engineers
Dynamic Consulting Engineers, LLC
Henneman Engineering, Inc.
Lien & Peterson Architects, Inc.
AE Shortlist: Design Engineers, Dynamic Consulting Engineers, LLC, Henneman Engineering, Inc.
Selected AE: Design Engineers

Project No.: 19J1D
Project Name: Food Service Building Renovation
Institution: HEALTH SERVICES/MENDOTA MENTAL HEALTH INSTITUTE, MADISON
Location: CITY OF MADISON, Wisconsin
Construction Cost: $21,350,000
AE Submittal Date: 9/1/2020 2:30:00 PM
Last Item Update: 12/23/2020 8:23:45 AM
AE Submitting Qualifications: Assemblage Architects
Potter Lawson, Inc.
Sketchworks Architecture, LLC
Strang, Inc.
Uihlein/Wilson - Ramlow/Stein Architects, Inc.
Venture Architects
AE Shortlist: Potter Lawson, Inc., Strang, Inc., Uihlein/Wilson - Ramlow/Stein Architects, Inc., Venture Architects
Selected AE: Ramlow/Stein Architects, Inc.

Project No.: 20A1E
Project Name: Addition and Renovation
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: TOWN OF MENOMONIE, Wisconsin
Construction Cost: $14,648
AE Submittal Date: 8/19/2020 2:30:00 PM
Last Item Update: 10/21/2020 2:13:19 PM
AE Submitting Qualifications: Assemblage Architects
Berners-Schober Associates, Inc.
BWBR Architects, Inc.
BWZ Architects
Engberg Anderson, Inc.
Hammel, Green and Abrahamson, Inc.
LHB, Inc.
Lien & Peterson Architects, Inc.
Mead & Hunt, Inc.
MEP Associates, LLC
Plunkett Raysich Architects
SDS Architects, Inc.
Somerville, Inc.
Uihlein/Wilson - Ramlow/Stein Architects, Inc.
AE Shortlist: LHB, Inc., Plunkett Raysich Architects, Somerville, Inc., Uihlein/Wilson - Ramlow/Stein Architects, Inc.
Selected AE: Ramlow/Stein Architects, Inc.

Project No.: 19G1J
Project Name: Prairie Springs Science Center - Phase II
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $63,021,000
AE Submittal Date: 8/4/2020 2:30:00 PM
Last Item Update: 10/15/2020 11:30:18 AM
AE Submitting Qualifications: Hammel, Green and Abrahamson, Inc.
Performa, Inc. in association with HED
River Architects, Inc.
Strang, Inc. in association with CannonDesign
Uihlein/Wilson - Ramlow/Stein Architects, Inc. in association with Alliiance
AE Shortlist: River Architects, Inc., Strang, Inc. in association with CannonDesign, Uihlein/Wilson - Ramlow/Stein Architects, Inc. in association with Alliiance
Selected AE: River Architects, Inc.

Project No.: 17E3C
Project Name: Building 6 Remodel
Institution: HEALTH SERVICES/CENTRAL WISCONSIN CENTER, MADISON
Location: CITY OF MADISON, Wisconsin
Construction Cost: $10,205,000
AE Submittal Date: 4/2/2020 2:30:00 PM
Last Item Update: 9/18/2020 4:31:48 PM
AE Submitting Qualifications:

Dorschner Associates, Inc.
Somerville, Inc.
Zimmerman Architectural Studios, Inc.

AE Shortlist: Dorschner Associates, Inc., Somerville, Inc., Zimmerman Architectural Studios, Inc.
Selected AE: Zimmerman Architectural Studios, Inc.

Project No.: 19J4E
Project Name: Science / Health Science Building
Institution: UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
Location: CITY OF EAU CLAIRE, Wisconsin
Construction Cost: $178,838,000
AE Submittal Date: 3/3/2020 2:30:00 PM
Last Item Update: 7/31/2020 11:40:23 AM
AE Submitting Qualifications:

Bray Associates Architects, Inc. in assoc. with HED
Eppstein Uhen Architects in assoc. with Perkins&Will
Flad Architects
Hammel, Green and Abrahamson, Inc.
Potter Lawson, Inc.
SmithGroup, Inc.
Strang, Inc. in assoc. with CannonDesign

AE Shortlist: Bray Associates Architects, Inc. in assoc. with HED, Eppstein Uhen Architects in assoc. with Perkins&Will, Hammel, Green and Abrahamson, Inc., Potter Lawson, Inc.
Selected AE: Potter Lawson, Inc.

Project No.: 19I2Q
Project Name: New Health Services Unit
Institution: CORRECTIONS/STANLEY CORRECTIONAL INSTITUTION, STANLEY
Location: CITY OF STANLEY, Wisconsin
Construction Cost: $8,213,000
AE Submittal Date: 2/26/2020 2:30:00 PM
Last Item Update: 9/18/2020 4:31:26 PM
AE Submitting Qualifications:

Kehoe Henry & Associates, Inc.
Mead & Hunt
Venture Architects

AE Shortlist: Kehoe Henry & Associates, Inc., Mead & Hunt, Venture Architects
Selected AE: Mead & Hunt

Project No.: 19J3I
Project Name: SWQ Master Plan Update and New Engineering Building
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $90,872,000
AE Submittal Date: 2/10/2020 2:30:00 PM
Last Item Update: 7/28/2020 10:21:53 AM
AE Submitting Qualifications:

Continuum Architects + Planners in assoc. with SmithGroup
Engberg Anderson, Inc. in assoc. with Gensler
Eppstein Uhen Architects in assoc. with Perkins&Will
Flad Architects
Hammel, Green and Abrahamson, Inc.
Strang, Inc.

AE Shortlist: Continuum Architects + Planners in assoc. with SmithGroup, Eppstein Uhen Architects in assoc. with Perkins&Will, Flad Architects, Hammel, Green and Abrahamson, Inc.
Selected AE: Continuum Architects + Planners in assoc. with SmithGroup

Project No.: 19I1L
Project Name: Winther Hall Addition & Renovation
Institution: UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
Location: CITY OF WHITEWATER, Wisconsin
Construction Cost: $31,411,000
AE Submittal Date: 1/3/2020 2:30:00 PM
Last Item Update: 4/17/2020 1:28:45 PM
AE Submitting Qualifications: Dorschner Associates, Inc.
Hammel, Green, and Abrahamson, Inc.
Plunkett Raysich Architects
Somerville, Inc.
Uihlein/Wilson - Ramlow/Stein Architects, Inc.
Workshop Architects, Inc.
Zimmerman Architectural Studios, Inc.
AE Shortlist: Hammel, Green, and Abrahamson, Inc., Plunkett Raysich Architects, Somerville, Inc.
Selected AE: Somerville, Inc.

Project No.: 19I1M
Project Name: Science and Technology Innovation Center
Institution: UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
Location: CITY OF RIVER FALLS, Wisconsin
Construction Cost: $81,556,000
AE Submittal Date: 12/16/2019 2:30:00 PM
Last Item Update: 2/19/2020 10:13:37 AM
AE Submitting Qualifications: Ayres Associates, Inc. in assoc. with Architectural Alliance International
BWBR Architects, Inc.
Continuum Architects + Planners in assoc. with Bohlin Cywinski Jackson
Eppstein Uhen Architects in assoc. with Perkins & Will
Flad Architects
Hammel, Green, and Abrahamson, Inc.
Plunkett Raysich Architects, LLP
SDS Architects, Inc. in assoc. with HED
Strang, Inc. in assoc. with CannonDesign
AE Shortlist: Ayres Associates, Inc. in assoc. with Architectural Alliance International, BWBR Architects, Inc., Continuum Architects + Planners in assoc. with Bohlin Cywinski Jackson, Eppstein Uhen Architects in assoc. with Perkins & Will
Selected AE: BWBR Architects, Inc.

Project No.: 19F2Y DESIGN BUILD
Project Name: Camp Randall Stadium Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost:  
AE Submittal Date: 12/10/2019 12:00:00 PM
Last Item Update: 2/4/2020 5:39:16 PM
AE Shortlist: JP Cullen & Sons, Inc., Gilbane Building Company
Selected AE: JP Cullen & Sons, Inc.

Project No.: 19H1B
Project Name: Klotsche Center Annex Addition
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $5,418,000
AE Submittal Date: 11/18/2019 2:30:00 PM
Last Item Update: 2/13/2020 12:23:56 PM
AE Submitting Qualifications: Hammel, Green, and Abrahamson, Inc.
Uihlein/Wilson - Ramlow/Stein Architects, Inc.
Zimmerman Architectural Studios, Inc.
AE Shortlist: Hammel, Green, and Abrahamson, Inc., Uihlein/Wilson - Ramlow/Stein Architects, Inc., Zimmerman Architectural Studios, Inc.
Selected AE: Hammel, Green, and Abrahamson, Inc.

Project No.: 19F3E
Project Name: Albertson Hall Replacement
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $62,753,000
AE Submittal Date: 10/4/2019 2:30:00 PM
Last Item Update: 12/27/2019 8:29:43 AM
AE Submitting Qualifications: Dorschner Associates, Inc.
River Architects, Inc.
Somerville, Inc.
Strang, Inc.
Workshop Architects, Inc.
Zimmerman Architectural Studios, Inc.
AE Shortlist: River Architects, Inc., Strang, Inc., Workshop Architects, Inc.
Selected AE: Workshop Architects, Inc.

Project No.: 19G2Z
Project Name: Ventilation Improvements
Institution: CORRECTIONS/MILWAUKEE SECURE DETENTION FACILITY
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $6,534,000
AE Submittal Date: 9/16/2019 2:30:00 PM
Last Item Update: 12/20/2019 12:52:22 PM
AE Submitting Qualifications: Grumman/Butkus Associates, Ltd.
Strang, Inc.
AE Shortlist: Grumman/Butkus Associates, Ltd., Strang, Inc.
Selected AE: Grumman/Butkus Associates, Ltd.

Project No.: 18K1G
Project Name: Readiness Center Replacement
Institution: MILITARY AFFAIRS/VIROQUA
Location: CITY OF VIROQUA, Wisconsin
Construction Cost: $17,333,000
AE Submittal Date: 8/12/2019 2:30:00 PM
Last Item Update: 10/14/2019 11:33:35 AM
AE Submitting Qualifications:

Assemblage Architects
Boer Architects, Inc. in assoc. with Bailey Edward Design

HSR Associates, Inc.
I & S Group, Inc.
Short Elliott Hendrickson, Inc.
Tactical Design North, Inc.
Venture Architects
Wendel Architectural Resources, Inc.

AE Shortlist: Assemblage Architects, HSR Associates, Inc., Short Elliott Hendrickson, Inc., Venture Architects
Selected AE: Assemblage Architects

Project No.: 18L2V
Project Name: Student Union Renovation
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $27,848,000
AE Submittal Date: 4/1/2019 2:30:00 PM
Last Item Update: 6/4/2019 3:36:27 PM
AE Submitting Qualifications: Ayres Associates, Inc.
Continuum Architects + Planners in assoc. with WTW Architects
Hammel, Green and Abrahamson, Inc.
Korb + Associates Architects in assoc. with Moody Nolan, Inc.
Strang, Inc. in assoc. with Perkins + Will
Workshop Architects, Inc.
AE Shortlist: Continuum Architects + Planners in assoc. with WTW Architects, Hammel, Green and Abrahamson, Inc., Workshop Architects, Inc.
Selected AE: Hammel, Green and Abrahamson, Inc.

Project No.: 18H2G
Project Name: Kohl Center Addition and Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $30,637,000
AE Submittal Date: 3/18/2019 2:30:00 PM
Last Item Update: 5/17/2019 9:59:11 AM
AE Submitting Qualifications: Berners-Schober Associates, Inc.
Hammel, Green and Abrahamson, Inc. in assoc. with Perkins + Will
Potter Lawson, Inc.
Uihlein/Wilson - Ramlow/Stein Architects, Inc. in assoc. with SRG Partnership
Venture Architects in assoc. with DLR Group, Inc.
AE Shortlist: Berners-Schober Associates, Inc., Hammel, Green and Abrahamson, Inc. in assoc. with Perkins + Will, Potter Lawson, Inc., Venture Architects in assoc. with DLR Group, Inc.
Selected AE: Berners-Schober Associates, Inc.

Project No.: 18H3E
Project Name: Gymnasium/Natatorium Replacement
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $72,580,000
AE Submittal Date: 3/4/2019 2:30:00 PM
Last Item Update: 4/23/2019 10:53:31 AM
AE Submitting Qualifications: Hammel, Green, and Abrahamson, Inc. in assoc. with Perkins +Will
Kahler Slater, Inc. in assoc. with HOK
Korb + Associates Architects in assoc. with CannonDesign
Plunkett Raysich Architects in assoc. with Hughes Group Architects
Potter Lawson, Inc. in assoc. with RDG Planning & Design
Zimmerman Architectural Studios, Inc. in assoc. with Moody Nolan, Inc.
AE Shortlist: Hammel, Green, and Abrahamson, Inc. in assoc. with Perkins +Will, Kahler Slater, Inc. in assoc. with HOK, Potter Lawson, Inc. in assoc. with RDG Planning & Design
Selected AE: Kahler Slater, Inc. in assoc. with HOK

Project No.: 18H2H
Project Name: Veterinary Medicine Addition and Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $84,916,000
AE Submittal Date: 2/25/2019 2:30:00 PM
Last Item Update: 4/18/2019 2:24:43 PM
AE Submitting Qualifications: Eppstein Uhen Architects in assoc. with Perkins + Will 
Flad Architects in assoc. with Foil Wyatt Architects & Planners
AE Shortlist: Eppstein Uhen Architects in assoc. with with Perkins + Will, Flad Architects in assoc. with Foil Wyatt Architects & Planners
Selected AE: Flad Architects in assoc. with Foil Wyatt Architects & Planners

Project No.: 18K2M
Project Name: Type 1 Juvenile Corrections Facility
Institution: CORRECTIONS/VARIOUS
Location: Statewide, Wisconsin
Construction Cost: $23,970,100
AE Submittal Date: 12/19/2018 2:30:00 PM
Last Item Update: 3/8/2019 11:20:52 AM
AE Submitting Qualifications: BWBR Architects, Inc.
Kehoe Henry & Associates, Inc.
Potter Lawson, Inc.
SDS Architects, Inc. i.a.w. Klein McCarthy Architects
Venture Architects i.a.w. DLR Group, Inc.
AE Shortlist: BWBR Architects, Inc., Kehoe Henry & Associates, Inc., Venture Architects i.a.w. DLR Group, Inc.
Selected AE: BWBR Architects, Inc.

Project No.: 17I1K
Project Name: Old World Wisconsin Guest Entry Experience
Institution: HISTORICAL SOCIETY/OLD WORLD WISCONSIN ETHNIC OUTDOOR MUSEUM, EAGLE
Location: TOWN OF EAGLE, Wisconsin
Construction Cost: $3,911,300
AE Submittal Date: 12/17/2018 2:30:00 PM
Last Item Update: 3/8/2019 11:09:48 AM
AE Submitting Qualifications: Aro Eberle Architects
Assemblage Architects
Galbraith Carnahan Architects, LLC
InSite Consulting Architects, LLC
Isthmus Architecture, Inc.
Kehoe Henry & Associates, Inc.
LHB, Inc.
Quorum Architects, Inc.
Zimmerman Architectural Studios, Inc.
AE Shortlist: Aro Eberle Architects, Assemblage Architects, Zimmerman Architectural Studios, Inc.
Selected AE: Aro Eberle Architects

Project No.: 18G1J
Project Name: Appleton Readiness Center Additions and Renovation
Institution: MILITARY AFFAIRS/APPLETON
Location: CITY OF APPLETON, Wisconsin
Construction Cost: $15,253,000
AE Submittal Date: 12/3/2018 2:30:00 PM
Last Item Update: 3/8/2019 11:10:07 AM
AE Submitting Qualifications: Assemblage Architects
Boer Architects, Inc. i.a.w. Bailey Edward Design, Inc.
Mead & Hunt, Inc.
AE Shortlist: Assemblage Architects, Boer Architects, Inc. in assoc. with Bailey Edward Design, Inc., Mead & Hunt, Inc.
Selected AE: Boer Architects, Inc. i.a.w. Bailey Edward Design, Inc.

Project No.: 18H3D
Project Name: Chemistry Building Construction and Central Utilities Expansion
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $97,081,000
AE Submittal Date: 11/2/2018 2:30:00 PM
Last Item Update: 12/20/2018 1:04:46 PM
AE Submitting Qualifications: Bray Associates Architects, Inc. in assoc. with Holabird & Root, LLC
Eppstein Uhen Architects in assoc. with ZGF Architects, LLP
Flad Architects
Hammel, Green, and Abrahamson, Inc.
Kahler Slater, Inc. in assoc. with CannonDesign
Perkins+Will in assoc. with Korb + Associates, Inc.
Potter Lawson, Inc.
Strang, Inc. in assoc. with Ballinger
Zimmerman Architectural Studios, Inc.
AE Shortlist: Eppstein Uhen Architects in assoc. with ZGF Architects, LLP; Flad Architects; Hammel, Green, and Abrahamson, Inc.; Kahler Slater, Inc. in assoc. with CannonDesign
Selected AE: Kahler Slater, Inc. in assoc. with CannonDesign

Project No.: 18F1Y
Project Name: Mendota Juvenile Treatment Center Expansion
Institution: HEALTH SERVICES/MENDOTA MENTAL HEALTH INSTITUTE, MADISON
Location: CITY OF MADISON, Wisconsin
Construction Cost: $39,166,000
AE Submittal Date: 10/23/2018 2:30:00 PM
Last Item Update: 12/19/2018 7:43:25 AM
AE Submitting Qualifications: BWBR, Inc.
Venture Architects i.a.w. DLR Group, Inc.
AE Shortlist: BWBR, Inc., Venture Architects i.a.w. DLR Group, Inc.
Selected AE: BWBR, Inc.

Project No.: 18C2E- R
Project Name: Milwaukee State Office Building
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $108,000,000
AE Submittal Date: 8/16/2018 3:00:00 PM
Last Item Update: 10/15/2018 9:54:07 AM
AE Submitting Qualifications: Continuum Architects + Planners i.a.w. SmithGroup
Eppstein Uhen Architects i.a.w. McClaren, Wilson & Lawrie, Inc.
Hammel Green & Abrahamson, Inc. i.a.w. McClaren, Wilson & Lawrie, Inc.
Korb + Associates Architects i.a.w. Harley Ellis Devereaux/Crime Lab Design
Plunkett Raysich Architects, LLP i.a.w. HKS, Inc.
Strang, Inc. i.a.w. McClaren, Wilson & Lawrie, Inc.
Venture Architects i.a.w. HOK
AE Shortlist: Continuum Architects + Planners i.a.w. SmithGroup, Eppstein Uhen Architects i.a.w. McClaren, Wilson & Lawrie, Inc., Strang, Inc. i.a.w. McClaren, Wilson & Lawrie, Inc., Venture Architects i.a.w. HOK
Selected AE: Continuum Architects + Planners i.a.w. SmithGroup

Project No.: 18E2P
Project Name: Governors Hall Addition and Renovation
Institution: UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
Location: CITY OF EAU CLAIRE, Wisconsin
Construction Cost: $15,774,000
AE Submittal Date: 7/17/2018 2:30:00 PM
Last Item Update: 9/18/2018 11:58:51 AM
AE Submitting Qualifications: Assemblage Architects
Engberg Anderson, Inc.
Hammel Green & Abrahamson, Inc.
Lien & Peterson Architects, Inc.
Mead & Hunt, Inc.
SDS Architects, Inc.
Somerville, Inc.
AE Shortlist: Engberg Anderson, Inc., Hammel Green & Abrahamson, Inc., Mead & Hunt, Inc., SDS Architects, Inc.
Selected AE: SDS Architects, Inc.

Project No.: 18C2F
Project Name: Southeast Regional Headquarters Renovation
Institution: NATURAL RESOURCES/SOUTHEASTERN REGION HDQRTS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $10,900,000
AE Submittal Date: 5/22/2018 2:30:00 PM
Last Item Update: 7/27/2018 4:20:29 PM
AE Submitting Qualifications: Engberg Anderson, Inc.
Hammel Green & Abrahamson, Inc.
Korb + Associates Architects
LHB, Inc.
Mayer Helminiak Architects LLC
Plunkett Raysich Architects
Quorum Architects, Inc.
Uihlein/Wilson - Ramlow/Stein Architects, Inc.
Zimmerman Architectural Studios, Inc.
AE Shortlist: Hammel Green & Abrahamson, Inc., Quorum Architects, Inc., Uihlein/Wilson-Ramlow/Stein Architects, Inc., Zimmerman Architectural Studios, Inc.
Selected AE: Uihlein/Wilson-Ramlow/Stein Architects, Inc.

Project No.: 18A2P
Project Name: Inmate Programs Building
Institution: CORRECTIONS/Wisconsin Secure Program Facility
Location: CITY OF BOSCOBEL, Wisconsin
Construction Cost: $6,737,000
AE Submittal Date: 5/1/2018 2:30:00 PM
Last Item Update: 7/13/2018 12:33:17 PM
AE Submitting Qualifications: Kehoe-Henry & Associates Inc.
Mead & Hunt, Inc. in assoc. with HDR Architecture, Inc.
Venture Architects
AE Shortlist: Kehoe-Henry & Associates Inc., Mead & Hunt, Inc. in assoc. with HDR Architecture, Inc., Venture Architects
Selected AE: Mead & Hunt, Inc. in assoc. with HDR Architecture, Inc.

Project No.: 17J2L
Project Name: Lathrop Drive-Bascom Hill Utility Repairs
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $26,439,000
AE Submittal Date: 4/24/2018 2:30:00 PM
Last Item Update: 6/22/2018 2:04:39 PM
AE Submitting Qualifications: Affiliated Engineers, Inc.
Ring & DuChateau, LLP
AE Shortlist: Affiliated Engineers, Inc., Ring & DuChateau, LLP
Selected AE: Ring & DuChateau, LLP

Project No.: 18C2E
Project Name: Milwaukee State Office Building
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $43,000,000
AE Submittal Date: 4/17/2018 2:30:00 PM
Last Item Update: 1/25/2022 1:08:42 PM
AE Submitting Qualifications:

This Selection has been amended and replaced by A/E Services Request dated August  2018 (18C2E- R)


Project No.: 17D2P
Project Name: Readiness Center Renovation Phase II
Institution: MILITARY AFFAIRS/MILWAUKEE
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $4,940,000
AE Submittal Date: 3/20/2018 2:30:00 PM
Last Item Update: 5/8/2018 1:42:14 PM
AE Submitting Qualifications: Assemblage Architects
Ayres Associates Inc.
Boer Architects Inc.
Groth Design Group Inc.
Mead & Hunt, Inc.
AE Shortlist: Assemblage Architects, Boer Architects Inc., Mead & Hunt, Inc.
Selected AE: Boer Architects Inc.

Project No.: 17I1F
Project Name: Linden Drive Parking Garage
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $19,200,000
AE Submittal Date: 2/7/2018 2:30:00 PM
Last Item Update: 4/5/2018 1:16:20 PM
AE Submitting Qualifications: GRAEF
Harwood Engineering Consultants, Ltd.
Potter Lawson Inc.
R.A. Smith, Inc.
SRF Consulting Group Inc.
AE Shortlist: GRAEF, Harwood Engineering Consultants, Ltd., Potter Lawson Inc., R.A. Smith, Inc.
Selected AE: Potter Lawson Inc.

Project No.: 17H1X
Project Name: Sesquicentennial Hall
Institution: UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
Location: CITY OF PLATTEVILLE, Wisconsin
Construction Cost: $41,795,000
AE Submittal Date: 1/16/2018 2:30:00 PM
Last Item Update: 3/2/2018 3:01:54 PM
AE Submitting Qualifications: BWBR Architects Inc, Eppstein Uhen Architects iaw ZGF, Flad Architects, Hammel Green & Abrahamson Inc, Potter Lawson Inc, River Architects Inc, Strang Inc, Zimmerman Architectural Studios Inc
AE Shortlist: BWBR Architects Inc, Flad Architects, Hammel Green & Abrahamson Inc, River Architects Inc
Selected AE: BWBR Architects Inc.

Project No.: 17E1Q
Project Name: Wyllie Hall Renovation, Phase 1
Institution: UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
Location: TOWN OF SOMERS, Wisconsin
Construction Cost: $25,120,000
AE Submittal Date: 11/20/2017 2:30:00 PM
Last Item Update: 1/31/2018 2:27:42 PM
AE Submitting Qualifications: Angus Young Associates Inc. i.a.w. Demonica Kemper Architects
Assemblage Architects
BWZ Architects i.a.w. Holabird & Root
Engberg Anderson Inc. i.a.w. Gensler
Hammel Green & Abrahamson Inc.
Plunkett Raysich Architects
Strang Inc.
Workshop Architects Inc.
AE Shortlist: Hammel Green & Abrahamson, Inc., Plunkett Raysich Architects, LLP, Workshop Architects, Inc.
Selected AE: Workshop Architects, Inc.

Project No.: 12J1K R
Project Name: Boebel Hall Addition and Renovation Phase II
Institution: UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
Location: CITY OF PLATTEVILLE, Wisconsin
Construction Cost: $19,885,000
AE Submittal Date: 10/31/2017 2:30:00 PM
Last Item Update: 12/20/2017 9:58:07 AM
AE Submitting Qualifications: Aro Eberle Architects
Assemblage Architects i.a.w. Architectural Alliance International
BWBR Architects, Inc.
Continuum Architects + Planners
Eppstein Uhen Architects
Perkins+Will i.a.w. I & S Group
Plunkett Raysich Architects
River Architects, Inc.
Strang, Inc.
AE Shortlist: Aro Eberle Architects, BWBR Architects, Inc, Continuum Architects + Planners, River Architects, Inc.
Selected AE: Continuum Architects + Planners

Project No.: 17E2E
Project Name: Utility Corridor Improvement & Chiller Upgrade
Institution: UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
Location: CITY OF WHITEWATER, Wisconsin
Construction Cost: $22,342,000
AE Submittal Date: 7/20/2017 2:30:00 PM
Last Item Update: 9/21/2017 10:11:18 AM
AE Submitting Qualifications: Affiliated Engineers, Inc.
Hammel Green & Abrahamson, Inc.
Henneman Engineering, Inc.
MEP Associates, LLC
Ring & DuChateau, LLP
AE Shortlist: Affiliated Engineers, Inc., Henneman Engineering, Inc., Ring & DuChateau, LLP
Selected AE: Ring & DuChateau, LLP

Project No.: 16A1T
Project Name: Champions Hall Addition
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $35,431,000
AE Submittal Date: 6/13/2017 2:30:00 PM
Last Item Update: 9/22/2017 8:27:48 AM
AE Submitting Qualifications: Angus Young Associates, Inc. i.a.w. GMB Architecture + Engineering
Berners Schober Associates, Inc. i.a.w. HOK  
Bray Associates Architects, Inc. i.a.w. CannonDesign
BWBR Architects, Inc. i.a.w. Dewberry
Continuum Architects & Planners i.a.w. RDG Planning & Design
Gensler i.a.w. American Design, Inc.
Kahler Slater, Inc.
River Architects, Inc. i.a.w. SmithGroupJJR
SDS Architects, Inc.
Somerville, Inc.
AE Shortlist: Berners Schober Associates, Inc. i.a.w. HOK, BWBR Architects, Inc. i.a.w. Dewberry, Continuum Architects & Planners i.a.w. RDG Planning & Design, Kahler Slater, Inc.
Selected AE: Kahler Slater, Inc.

Project No.: 17C1U
Project Name: MMHI Heating Plant Boiler Replacement
Institution: HEALTH SERVICES/MENDOTA MENTAL HEALTH INSTITUTE, MADISON
Location: CITY OF MADISON, Wisconsin
Construction Cost: $4,400,000
AE Submittal Date: 6/5/2017 2:30:00 PM
Last Item Update: 8/25/2017 2:28:43 PM
AE Submitting Qualifications: Affiliated Engineers Inc.
Hammel Green & Abrahamson Inc.
I & S Group, Inc.
AE Shortlist: Affiliated Engineers Inc., Hammel Green & Abrahamson Inc., I & S Group, Inc.
Selected AE: I & S Group, Inc.

Project No.: 17B1O
Project Name: MIL NWQ Renovation & Student Health Services Remodel
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $47,405,000
AE Submittal Date: 5/9/2017 2:30:00 PM
Last Item Update: 8/14/2017 11:06:59 AM
AE Submitting Qualifications: Assemblage Architects
Bray Associates Architects, Inc. i.a.w. Gensler
Continuum Architects & Planners S C
Hammel Green & Abrahamson Inc.
James G. Otto Architect, LLC i.a.w. Perkins+Will
Kahler Slater Inc.
OPN Architects, Inc. i.a.w. The S/L/A/M Collaborative
Strang Inc.
Uihlein Wilson Architects Inc. i.a.w. Moody Nolan
AE Shortlist: Continuum Architects & Planners, HGA, Inc., Kahler Slater, Inc.
Selected AE: Kahler Slater, Inc.

Project No.: 16L1U
Project Name: Sandburg Residence Hall Renovation
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $27,170,000
AE Submittal Date: 4/25/2017 2:30:00 PM
Last Item Update: 7/7/2017 2:34:04 PM
AE Submitting Qualifications: Assemblage Architects
Engberg Anderson, Inc.
Eppstein Uhen Architects
Mayer Helminiak Architects, LLC
Quorum Architects, Inc.
AE Shortlist: Assemblage Architects, Engberg Anderson, Inc., Mayer Helminiak Architects, LLC, Quorum Architects, Inc.
Selected AE: Engberg Anderson, Inc.

Project No.: 16G1S
Project Name: Kettle Moraine Springs Hatchery Renovation
Institution: NATURAL RESOURCES/KETTLE MORAINE HATCHERY
Location: TOWN OF SCOTT, Wisconsin
Construction Cost: $20,138,000
AE Submittal Date: 11/15/2016 2:30:00 PM
Last Item Update: 1/4/2017 11:47:46 AM
AE Submitting Qualifications: MSA Professional Services Inc
AE Shortlist: MSA Professional Services Inc
Selected AE: MSA Professional Services Inc

Project No.: 14I2R
Project Name: May Roach Hall and Smith Hall Renovations
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $14,465,000
AE Submittal Date: 10/11/2016 2:30:00 PM
Last Item Update: 1/5/2017 8:11:33 AM
AE Submitting Qualifications: Assemblage Architects
Engberg Anderson Inc.
Korb + Associates Architects
Mead & Hunt, Inc.
SDS Architects Inc
Somerville, Inc.
AE Shortlist: Assemblage Architects, Engberg Anderson Inc, SDS Architects Inc, Somerville Inc.
Selected AE: Somerville Inc.

Project No.: 15I1D
Project Name: Construct Health Services Unit
Institution: CORRECTIONS/RACINE CORRECTIONAL INSTITUTION, STURTEVANT
Location: VILLAGE OF STURTEVANT, Wisconsin
Construction Cost: $6,267,000
AE Submittal Date: 8/9/2016 2:30:00 PM
Last Item Update: 10/26/2016 2:15:07 PM
AE Submitting Qualifications: Kehoe Henry & Associates Inc.
Potter Lawson Inc.
Venture Architects
AE Shortlist: Kehoe Henry & Associates Inc, Potter Lawson Inc, Venture Architects
Selected AE: Venture Architects

Project No.: 15I2I
Project Name: Fieldhouse and Soccer Support Facility
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $26,487,000
AE Submittal Date: 7/12/2016 2:30:00 PM
Last Item Update: 9/30/2016 3:18:46 PM
AE Submitting Qualifications: Ayres Associates Inc i.a.w. Hastings+Chivetta, Bray Associates Architects Inc i.a.w. Gensler, Continuum Architects & Planners S C i.a.w. CannonDesign, HSR Associates Inc i.a.w. RDG Planning & Design, Kahler Slater Inc, Potter Lawson Inc, River Architects Inc i.a.w. HOK, SDS Architects Inc, Venture Architects i.a.w. Moody Nolan
AE Shortlist: HSR Associates Inc iaw RDG Planning & Design, Kahler Slater Inc, SDS Architects Inc
Selected AE: HSR Associates Inc iaw RDG Planning & Design

Project No.: 15K1F
Project Name: South Campus Utility Improvements
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $12,486,000
AE Submittal Date: 6/16/2016 2:30:00 PM
Last Item Update: 10/26/2016 2:15:49 PM
AE Submitting Qualifications: Affiliated Engineers Inc, Burns & McDonnell, Henneman Engineering Inc, Ring & DuChateau, LLP, Sebesta, Inc.
AE Shortlist: Affiliated Engineers Inc, Henneman Engineering Inc, Ring & DuChateau, LLP, Sebesta, Inc.
Selected AE: Affiliated Engineers Inc.

Project No.: 16D1I
Project Name: Little Falls Dam Reconstruction
Institution: NATURAL RESOURCES/WILLOW RIVER STATE PARK
Location: TOWN OF HUDSON, Wisconsin
Construction Cost: $6,724,800
AE Submittal Date: 5/24/2016 2:30:00 PM
Last Item Update: 7/18/2016 2:03:25 PM
AE Submitting Qualifications: AECOM USA, Inc.
Ayres Associates Inc
Mead & Hunt, Inc.
AE Shortlist: AECOM USA, Inc., Ayres Associates Inc, Mead & Hunt, Inc.
Selected AE: Mead & Hunt, Inc.

Project No.: 15I1B
Project Name: Price Commons First Floor Renovation
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: CITY OF MENOMONIE, Wisconsin
Construction Cost: $5,052,000
AE Submittal Date: 3/3/2016 2:30:00 PM
Last Item Update: 6/21/2016 12:16:01 PM
AE Submitting Qualifications: Ayres Associates Inc
Groth Design Group Inc
Lien & Peterson Architects, Inc
SDS Architects Inc
AE Shortlist: Ayres Associates Inc, Groth Design Group Inc, Lien & Peterson Architects, Inc, SDS Architects Inc
Selected AE: Lien & Peterson Architects, Inc

Project No.: 15I1A
Project Name: 1 West Wilson Comprehensive Fire Protection Retrofit
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MADISON, Wisconsin
Construction Cost: $4,221,600
AE Submittal Date: 2/16/2016 2:30:00 PM
Last Item Update: 6/21/2016 12:11:26 PM
AE Submitting Qualifications: Assemblage Architects
CMG & Associates Inc

AE Shortlist: Assemblage Architects, CMG & Associates Inc
Selected AE: CMG & Associates Inc

Project No.: 15F2A
Project Name: DeBot Dining Center Renovation
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $12,741,000
AE Submittal Date: 2/8/2016 2:30:00 PM
Last Item Update: 4/28/2016 3:43:51 PM
AE Submitting Qualifications: Ayres Associates Inc
Engberg Anderson Inc
Groth Design Group Inc
SDS Architects Inc
Strang Inc
AE Shortlist: Ayres Associates Inc., Engberg Anderson Inc., SDS Architects Inc.
Selected AE: SDS Architects Inc.

Project No.: 15K2E
Project Name: New Residence Hall
Institution: UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
Location: CITY OF WHITEWATER, Wisconsin
Construction Cost: $26,394,000
AE Submittal Date: 1/15/2016 2:30:00 PM
Last Item Update: 4/11/2016 1:45:48 PM
AE Submitting Qualifications: Angus Young Associates Inc in association with Cannon Design
BWBR Architects, Inc.
BWZ Architects
Engberg Anderson Inc.
Eppstein Uhen Architects
Korb + Associates Architects
Mead & Hunt, Inc.
Potter Lawson Inc.
SDS Architects Inc.
Uihlein Wilson Architects Inc.
AE Shortlist: BWBR Architects, Inc., Engberg Anderson Inc., Eppstein Uhen Architects
Selected AE: Eppstein Uhen Architects

Project No.: 15F2Q
Project Name: Milwaukee Readiness Center Renovation - Phase 1
Institution: MILITARY AFFAIRS/MILWAUKEE
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $4,821,200
AE Submittal Date: 11/16/2015 2:30:00 PM
Last Item Update: 2/29/2016 8:30:58 AM
AE Submitting Qualifications: Assemblage Architects
HSR Associates Inc
Mead & Hunt, Inc.
Venture Architects
AE Shortlist: Assemblage Architects, HSR Associates Inc., Mead & Hunt, Inc., Venture Architects
Selected AE: Mead & Hunt, Inc.

Project No.: 14J2W
Project Name: North Hall Renovation and Addition
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: TOWN OF MENOMONIE, Wisconsin
Construction Cost: $12,649,000
AE Submittal Date: 11/13/2015 2:30:00 PM
Last Item Update: 2/29/2016 8:31:47 AM
AE Submitting Qualifications: Angus Young Associates Inc
Architectural Design Group LLC in association with LHB, Inc.
Assemblage Architects
BWBR Architects, Inc.
Engberg Anderson Inc
Kindness Architecture & Planning in association with Mead & Hunt
Korb Tredo Architects Inc
Lien & Peterson Architects, Inc
SDS Architects Inc
Somerville, Inc.
AE Shortlist: BWBR Architects, Inc., Engberg Anderson Inc., Lien & Peterson Architects Inc., SDS Architects Inc.
Selected AE: BWBR Architects, Inc.

Project No.: 14K1G
Project Name: PLT Williams Fieldhouse Addition, Phase II
Institution: UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
Location: TOWN OF PLATTEVILLE, Wisconsin
Construction Cost: $12,079,000
AE Submittal Date: 9/24/2015 2:30:00 PM
Last Item Update: 12/15/2015 12:51:48 PM
AE Submitting Qualifications: American Design Inc
Angus Young Associates Inc w/ GMB Architecture + Engineering
Berners Schober Associates Inc
Bray Associates Architects, Inc
Groth Design Group Inc w/ BBLD Architects, Inc.
HSR Associates Inc
Kahler Slater Inc
KEE Architecture Inc
SDS Architects Inc
Venture Architects
AE Shortlist: American Design, Kahler Slater, KEE Architecture, Inc., SDS Architects
Selected AE: Kahler Slater

Project No.: 14I2B
Project Name: Recreational Eagles Center Addition
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $6,936,000
AE Submittal Date: 9/17/2015 2:30:00 PM
Last Item Update: 12/15/2015 12:52:24 PM
AE Submitting Qualifications: Berners Schober Associates Inc
HSR Associates Inc
KEE Architecture Inc
SDS Architects Inc
AE Shortlist: Berners Schober Associates Inc, HSR Associates Inc, KEE Architecture Inc, SDS Architects Inc
Selected AE: SDS Architects, Inc.

Project No.: 15F1T
Project Name: Bowman Hall - Exterior Envelope Maintenance and Repair
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: CITY OF MENOMONIE, Wisconsin
Construction Cost: $6,843,000
AE Submittal Date: 9/11/2015 2:30:00 PM
Last Item Update: 12/15/2015 12:53:12 PM
AE Submitting Qualifications: Ayres Associates Inc
Bloom Companies LLC in association with James G. Otto Architect, LLC
InSite Consulting Architects, LLC
LHB Inc
Mead & Hunt, Inc. in association with Isthmus Architecture, Inc.
River Architects Inc
Specialty Engineering Group LLC
Ziad Salameh LLC (ZSLLC)
AE Shortlist: Bloom Companies LLC in association with James G. Otto Architect, LLC, Mead & Hunt, Inc. in association with Isthmus Architecture, Inc., Specialty Engineering Group LLC
Selected AE: Mead & Hunt, Inc. in association with Isthmus Architecture, Inc.

Project No.: 14L2T
Project Name: Southeast Recreational Facility Replacement
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $68,783,000
AE Submittal Date: 7/10/2015 2:30:00 PM
Last Item Update: 9/23/2015 12:54:48 PM
AE Submitting Qualifications: Berners Schober Associates Inc. in association with Hughes Group Architects
Continuum Architects & Planners S C in association with Moody Nolan
Engberg Anderson Inc. in association with Gensler
Kahler Slater Inc. in association with RDG Planning and Design, Inc.
SDS Architects Inc. in association with HKS Architects, Inc.
Strang Inc. in association with Hastings + Chivetta
Workshop Architects Inc. in association with HOK
Zimmerman Architectural Studios Inc. in association with Cannon Design 
AE Shortlist: Berners Schober Associates i.a.w. Hughes Group Architects; Kahler Slater i.a.w. RDG Planning and Design, Inc.; Workshop Architects i.a.w. HOK
Selected AE: Workshop Architects in assocation with HOK

Project No.: 14H1Z
Project Name: Towers Hall Renovation
Institution: UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
Location: CITY OF EAU CLAIRE, Wisconsin
Construction Cost: $26,670,000
AE Submittal Date: 5/22/2015 2:30:00 PM
Last Item Update: 8/5/2015 1:18:30 PM
AE Submitting Qualifications: Engberg Anderson Inc
Eppstein Uhen Architects
SDS Architects Inc
AE Shortlist: Engberg Anderson Inc., Eppstein Uhen Architects, SDS Architects Inc.
Selected AE: Eppstein Uhen Architects

Project No.: 14I2O
Project Name: Wittich Hall Renovation
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $16,917,000
AE Submittal Date: 5/15/2015 2:30:00 PM
Last Item Update: 8/5/2015 1:54:37 PM
AE Submitting Qualifications: Angus Young Associates Inc.
Aro Eberle Architects
BWBR Architects, Inc.
Dorschner Associates Inc.
Engberg Anderson Inc.
HSR Associates Inc.
Mayer Helminiak Architects LLC.
Strang Inc.
AE Shortlist: Aro Eberle Architects, BWBR Architects, Inc., HSR Associates Inc.
Selected AE: Aro Eberle Architects

Project No.: 14A2N
Project Name: John R. Moses Skilled Nursing Facility
Institution: VETERANS AFFAIRS/WISCONSIN VETERANS HOME-KING
Location: TOWN OF FARMINGTON, Wisconsin
Construction Cost: $60,974,000
AE Submittal Date: 3/25/2015 2:30:00 PM
Last Item Update: 7/1/2015 10:34:47 AM
AE Submitting Qualifications: Abacus Architects Inc. in association with SFCS Inc.
Berners Schober Associates Inc. in association with Harley, Ellis, Deveraux 
BWBR Architects, Inc.
Engberg Anderson Inc. in association with Horty Elving
Eppstein Uhen Architects
Korb Tredo Architects Inc,  in association with Perkins Eastman
Plunkett Raysich Architects
Strang Inc.  in association with Nelson-Tremain Partnership
AE Shortlist: Berners Schober Associates Inc. in association with Harley, Ellis, Deveraux; Engberg Anderson Inc. in association with Horty Elving; Eppstein Uhen Architects
Selected AE: Eppstein Uhen Architects

Project No.: 14F3J
Project Name: Segregation Unit Expansion
Institution: CORRECTIONS/COLUMBIA CORRECTIONAL INSTITUTION, PORTAGE
Location: CITY OF PORTAGE, Wisconsin
Construction Cost: $4,610,000
AE Submittal Date: 3/6/2015 2:30:00 PM
Last Item Update: 6/3/2015 1:41:37 PM
AE Submitting Qualifications: BWBR Architects, Inc.
Kehoe Henry & Associates Inc.
Venture Architects
AE Shortlist: BWBR Architects, Inc., Kehoe Henry & Associates Inc., Venture Architects
Selected AE: Venture Architects

Project No.: 14I3Y
Project Name: MIL New Welcome Center and Center for Entrepreneurship
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $6,211,000
AE Submittal Date: 1/16/2015 2:30:00 PM
Last Item Update: 4/14/2015 3:39:57 PM
AE Submitting Qualifications: Bray Associates Architects, Inc
Continuum Architects & Planners S C
Engberg Anderson Inc
Flad Architects
Groth Design Group Inc
Hammel Green & Abrahamson Inc
KEE Architecture Inc
Kindness Architecture & Planning
Korb Tredo Architects Inc
Mayer Helminiak Architects LLC
Plunkett Raysich Architects
Renner Architects LLC
Rinka Chung Architecture Inc
Somerville, Inc.
The Kubala Washatko Architects, Inc.
Uihlein Wilson Architects Inc
AE Shortlist: Continuum Architects & Planners SC, KEE Architecture Inc, Plunkett Raysich Architects, The Kubala Washatko Architects, Inc.
Selected AE: Continuum Architects & Planners SC

Project No.: 14H3H
Project Name: Near West Playfields Upgrade
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $5,414,000
AE Submittal Date: 1/16/2015 2:30:00 PM
Last Item Update: 4/14/2015 1:04:49 PM
AE Submitting Qualifications: General Engineering Company
GRAEF
I&S Group, Inc.
Rettler Corporation
SmithGroupJJR
AE Shortlist: GRAEF, Rettler Corporation, SmithGroupJJR
Selected AE: SmithGroupJJR

Project No.: 14E2O
Project Name: Witte Residence Hall Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $38,089,000
AE Submittal Date: 10/29/2014 2:30:00 PM
Last Item Update: 1/13/2015 1:55:36 PM
AE Submitting Qualifications: Engberg Anderson Inc
Henneman Engineering Inc (Madison, WI & Champaign, IL)
Korb Tredo Architects Inc in association with VOA Associates
SDS Architects Inc. in association with ESG Architects, Inc.
Uihlein Wilson Architects Inc
AE Shortlist: Engberg Anderson Inc.; SDS Architects Inc. in association with ESG Architects, Inc.; Uihlein Wilson Architects Inc.
Selected AE: Uihlein Wilson Architects Inc.

Project No.: 12K1L
Project Name: Garfield Avenue Corridor Improvements
Institution: UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
Location: CITY OF EAU CLAIRE, Wisconsin
Construction Cost: $9,712,000
AE Submittal Date: 9/18/2014 2:30:00 PM
Last Item Update: 12/4/2014 4:43:13 PM
AE Submitting Qualifications: Ayres Associates Inc.
MSA Professional Services Inc.
Short Elliott Hendrickson Inc.
Strand Associates Inc.
AE Shortlist: Ayres Associates Inc., MSA Professional Services Inc., Short Elliott Hendrickson Inc.
Selected AE: Ayres Associates Inc.

Project No.: 13F2B
Project Name: MIL Integrated Research Center at Innovation Park
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF WAUWATOSA, Wisconsin
Construction Cost: $58,500,000
AE Submittal Date: 8/14/2014 2:30:00 PM
Last Item Update: 11/5/2014 11:56:26 AM
AE Submitting Qualifications: Berners Schober Associates Inc in assocation with Harley Ellis Devereaux
Continuum Architects & Planners S C in assocation with Cannon Design
Engberg Anderson Inc in assocation with Skidmore Owings & and Merrill LLP
Eppstein Uhen Architects in assocation with ZGF Architects LLP
Flad Architects
Hammel Green & Abrahamson Inc in assocation with Perkins + Will
Kahler Slater Inc in assocation with Lord Aeck and Sargent, Inc.
Uihlein Wilson Architects Inc
Zimmerman Architectural Studios Inc
AE Shortlist: Continuum Architects & Planners S C in assocation with Cannon Design; Eppstein Uhen Architects in assocation with ZGF Architects LLP; Flad Architects; Kahler Slater Inc in assocation with Lord Aeck and Sargent, Inc.
Selected AE: Eppstein Uhen Architects (Milwaukee, WI) in assocation with ZGF Architects LLP

Project No.: 13K3E
Project Name: Health Services Unit Expansion
Institution: CORRECTIONS/OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $5,887,000
AE Submittal Date: 8/12/2014 2:30:00 PM
Last Item Update: 11/13/2014 2:42:24 PM
AE Submitting Qualifications:

Angus Young Associates Inc.
BWBR Architects, Inc.
Mead & Hunt, Inc.
Somerville, Inc.
Venture Architects

AE Shortlist: BWBR Architects, Inc.; Somerville, Inc.; Venture Architects
Selected AE: BWBR Architects, Inc.

Project No.: 13L2I
Project Name: Lorenz Hall Secure Treatment Unit Renovation
Institution: HEALTH SERVICES/MENDOTA MENTAL HEALTH INSTITUTE, MADISON
Location: CITY OF MADISON, Wisconsin
Construction Cost: $4,279,000
AE Submittal Date: 8/6/2014 2:30:00 PM
Last Item Update: 11/5/2014 12:02:23 PM
AE Submitting Qualifications: Dorschner Associates Inc
Engberg Anderson Inc in association with Horty Elving
Mead & Hunt, Inc
Venture Architects
AE Shortlist: Dorschner Associates Inc; Engberg Anderson Inc in assocation with Horty Elving; Mead & Hunt, Inc; Venture Architects
Selected AE: Dorschner Associates Inc. (Madison, WI)

Project No.: 13B3G
Project Name: Chemistry Building Addition and Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $85,130,000
AE Submittal Date: 4/21/2014 2:30:00 PM
Last Item Update: 11/5/2014 11:58:37 AM
AE Submitting Qualifications:

Berners Schober Associates Inc in association with Harley Ellis Devereaux
BWBR Architects, Inc.
Continuum Architects & Planners S C in association with Cannon Design
Dorschner Associates Inc in association with BSA Life Structures
Eppstein Uhen Architects in association with ZGF Architects
Flad Architects
Plunkett Raysich Architects in association with CO Architects
Strang Inc in assocation with Ballinger
Uihlein Wilson Architects Inc  in assocation with Ellenzweig
Zimmerman Architectural Studios Inc

AE Shortlist: BWBR Architects; Continuum Architects & Planners S C in association with Cannon Design; Eppstein Uhen Architects in association with ZGF Architects; Strang Inc in assocation with Ballinger
Selected AE: Strang Inc. (Madison, WI) in assocation with Ballinger

Project No.: 13F3H
Project Name: Health Services Unit
Institution: CORRECTIONS/COLUMBIA CORRECTIONAL INSTITUTION, PORTAGE
Location: CITY OF PORTAGE, Wisconsin
Construction Cost: $4,773,000
AE Submittal Date: 3/28/2014 2:30:00 PM
Last Item Update: 11/5/2014 12:03:04 PM
AE Submitting Qualifications: BWBR Architects, Inc.
Mead & Hunt, Inc.
Venture Architects
AE Shortlist: BWBR Architects, Inc.; Mead & Hunt, Inc.; Venture Architects;
Selected AE: Venture Architects (Milwaukee, WI)

Project No.: 13I2Y
Project Name: Meat Science and Muscle Biology Laboratory
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $28,413,000
AE Submittal Date: 3/20/2014 2:30:00 PM
Last Item Update: 11/5/2014 11:59:34 AM
AE Submitting Qualifications:

Aro Eberle Architects
Assemblage Architects in assocation with Architectural Alliance International
Berners Schober Associates Inc in association with Harley Ellis Devereaux
Flad Architects
Potter Lawson Inc
Strang Inc
Zimmerman Architectural Studios Inc

AE Shortlist: Aro Eberle Architects; Flad Architects; Potter Lawson Inc; Zimmerman Architectural Studios Inc
Selected AE: Potter Lawson Inc. (Madison, WI)

Project No.: 13A1O
Project Name: Reeve Union Entrance and Expansion
Institution: UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $5,624,000
AE Submittal Date: 1/17/2014 2:30:00 PM
Last Item Update: 11/5/2014 12:11:44 PM
AE Submitting Qualifications:

Aro Eberle Architects

Assemblage Architects

Berners Schober Associates

Bloom Companies, LLC in association with James G. Otto  Architect, LLC

Boer Architects, Inc.

Groth Design Group, Inc.

Engberg Anderson

Dorschner|Associates, Inc.

HGM Architecture, Inc.

I&S Group, Inc.

KEE Architecture, Inc.

Korb Tredo Architects, Inc.

MartinRiley architects-engineers

Uihlein/Wilson Architects

AE Shortlist: Berners-Schober Associates; Korb Tredo Architects, Inc.; KEE Architecture, Inc.; Groth Design Group, Inc.
Selected AE: Berners-Schober Associates, Inc. (Green Bay, WI)

Project No.: 13B2B
Project Name: Fletcher Hall Renovation and Addition
Institution: UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $13,382,000
AE Submittal Date: 1/13/2014 2:30:00 PM
Last Item Update: 3/7/2014 5:13:42 PM
AE Submitting Qualifications:

Angus Young Associates, Inc.

Assemblage Architects

Berners-Schober Associates in association with VOA

Engberg Anderson, Inc.

Eppstein Uhen: Architects

Groth Design Group, Inc. in association with BLDD Architects, Inc.

Korb Tredo Architects

Plunkett Raysich Architects

SDS Architects, Inc.

Somerville, Inc.

Uihlein Wilson Architects

AE Shortlist: Angus Young Associates, Inc.; Engberg Anderson, Inc.; Eppstein Uhen: Architects; Somerville, Inc.
Selected AE: Eppstein Uhen Architects

Project No.: 13B3H
Project Name: Science Labs Building
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $63,894,000
AE Submittal Date: 1/10/2014 2:30:00 PM
Last Item Update: 11/5/2014 12:00:43 PM
AE Submitting Qualifications:

Architectural Design Group (ADG) in assoc. with Rafferty Rafferty Tollefson Lindeke Architects (RRTL) in assoc. with Research Facilities Design

Berners-Schober Associates, Inc. in association with Harley Ellis Devereaux

BWBR

Continuum Architects + Planners, S.C. in association with Cannon Design

Loebl Schlossman & Hackl in association with CWE Inc.

Hammel, Green and Abrahamson, Inc. 

River Architects in association with SmithGroupJRR

SDS Architects Inc. in association with EYP, Inc.

Sommerville Inc. in association with Perkins + Will

Strang, Inc. in association with Ballinger

Uihlein Wilson Architects Inc. in association with Ellenzweig

AE Shortlist: Berners-Schober Associates, Inc. in assoc. with Harley Ellis Devereaux; BWBR; Continuum Architects + Planners, S.C. in assoc. with Cannon Design; River Architects in assoc. with SmithGroupJRR
Selected AE: River Architects (La Crosse, WI) in association with SmithGroupJRR

Project No.: 13B2C
Project Name: Chemistry-Biology Building
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $59,700,000
AE Submittal Date: 9/19/2013 2:30:00 PM
Last Item Update: 12/11/2013 3:29:31 PM
AE Submitting Qualifications:

Architectural Design Group (ADG) in association with Rafferty Rafferty Tollefson Lindeke Architects (RRTL) in association with Research Facilities Design;  Berners-Schober Associates, Inc in association with Harley Ellis Devereaux;   Bray Associates Architects, Inc. in association with Stantec Architecture;   BWBR;   Continuum Architects + Planners in Association with Cannon Design;   FLAD Architects;   Groth Design Group, Inc. in association with BSA Life Structures;    Hammel, Green & Abrahamson, Inc.;   Plunkett Raysich Architects, LLP in association with Holabird & Root;   Potter Lawson, Inc.;   SDS Architects;   Somerville Inc. in association with Perkins + Will;   Strang Inc. in association with Lord Aeck & Sargent Architecture;   Uihlein/Wilson Architects, Inc. in association with Ellenzweig;   Zimmerman Architectural Studios, Inc.

AE Shortlist: BWBR; Continuum Architects + Planners in Association with Cannon Design; Potter Lawson, Inc.; Somerville Inc. in association with Perkins + Will
Selected AE: Potter Lawson Inc.

Project No.: 13A2U
Project Name: Dairy Plant Renovation & Center for Dairy Research Addition
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $20,652,000
AE Submittal Date: 5/30/2013 2:30:00 PM
Last Item Update: 11/8/2013 10:32:22 AM
AE Submitting Qualifications:

Assemblage Architects, BWZ Architects, Continuum Architects & Planners S C, Hammel Green & Abrahamson Inc, Mead & Hunt, Inc. in association with Aro Eberle Architects, Potter Lawson Inc, Zimmerman Architectural Studios Inc

AE Shortlist: BWZ Architects, Potter Lawson Inc, Zimmerman Architectural Studios Inc
Selected AE: Zimmerman Architectural Studios Inc.

Project No.: 13B3K
Project Name: West Campus Chilled Water Plant
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $6,912,000
AE Submittal Date: 5/29/2013 2:30:00 PM
Last Item Update: 11/26/2013 1:51:48 PM
AE Submitting Qualifications:

Affiliated Engineers Inc, Angus Young Associates Inc in association with GMB Architecture + Engineering, Clark Dietz Inc, Henneman Engineering Inc, Juhl Energy, Inc. dba Power Engineers Collaborative LLC, Karges-Faulconbridge, Inc. in association with Short Elliot Hendrickson Inc, MEP Associates LLC, Ring & DuChateau, LLP, Sebesta Blomberg & Associates Inc

AE Shortlist: Affiliated Engineers Inc, Karges-Faulconbridge, Inc. in association with Short Elliot Hendrickson Inc,Ring & DuChateau, LLP, Sebesta Blomberg & Associates Inc
Selected AE: Ring & DuChateau, LLP

Project No.: 12D2N
Project Name: DOJ Crime Lab Expansion in Building D
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MADISON, Wisconsin
Construction Cost: $3,820,700
AE Submittal Date: 5/23/2013 2:30:00 PM
Last Item Update: 10/17/2013 2:11:11 PM
AE Submitting Qualifications:

Assemblage Architects, Continuum Architects & Planners S C, Mayer Helminiak Architects LLC

AE Shortlist: Mayer Helminiak Architects LLC, Assemblage Architects, Continuum Architects & Planners S C
Selected AE: Mayer Helminiak Architects LLC

Project No.: 12L1C
Project Name: N. DeBot Res. Hall Renov.PH II
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $11,203,000
AE Submittal Date: 3/21/2013 2:30:00 PM
Last Item Update: 5/16/2013 11:19:16 AM
AE Submitting Qualifications: Angus Young Associates Inc; Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc; Assemblage Architects; Berners Schober Associates Inc; Boer Architects Inc in association with BLDD Architects, Inc.; BWZ Architects; Dorschner Associates Inc in association with RADA Architects; Lien & Peterson Architects, Inc; SDS Architects Inc; Somerville, Inc.
AE Shortlist: Somerville, Inc.; Angus Young Associates Inc; SDS Architects Inc; Lien & Peterson Architects, Inc
Selected AE: Somerville, Inc.

Project No.: 12J3C
Project Name: New Residence Hall
Institution: UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
Location: CITY OF WHITEWATER, Wisconsin
Construction Cost: $21,767,000
AE Submittal Date: 3/21/2013 2:30:00 PM
Last Item Update: 4/11/2013 9:04:23 AM
AE Submitting Qualifications:

Assemblage Architects; Berners Schober Associates Inc in association with VOA Associates Incorporated; Boer Architects Inc with association with BLDD Architects, Inc.; BWZ Architects; Engberg Anderson Inc; Eppstein Uhen Architects; Hammel Green & Abrahamson Inc; Kahler Slater Inc in association with Mackey Mitchell Architects; Korb Tredo Architects Inc; Mayer Helminiak Architects LLC; Mead & Hunt Inc in association with Treanor Architects; Potter Lawson Inc; SDS Architects Inc


Project No.: 12J1K
Project Name: Boebel Hall Addition and Renovation Phase II
Institution: UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
Location: CITY OF PLATTEVILLE, Wisconsin
Construction Cost: $12,525,000
AE Submittal Date: 1/3/2013 2:30:00 PM
Last Item Update: 12/20/2017 9:57:48 AM
AE Submitting Qualifications:

Angus Young Associates Inc in association with Harley Ellis Devereaux, Aro Eberle Architects, Assemblage Architects, BWBR Architects, Inc., Continuum Architects & Planners S C, Dorschner Associates Inc in association with OPN Architects, Inc., Mayer Helminiak Architects LLC, Plunkett Raysich Architects, SDS Architects Inc, Strang Inc

AE Shortlist: Plunkett Raysich Architects, Strang Inc, Continuum Architects & Planners S C, Aro Eberle Architects

Project No.: 12I1R
Project Name: Rodli Hall Renovation
Institution: UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
Location: CITY OF RIVER FALLS, Wisconsin
Construction Cost: $11,296,000
AE Submittal Date: 1/3/2013 2:30:00 PM
Last Item Update: 11/13/2014 2:43:01 PM
AE Submitting Qualifications:

Boer Architects Inc, Dorschner Associates Inc, Frisbie Architects Inc, KEE Architecture Inc, Lien & Peterson Architects, Inc; Mead & Hunt Inc, SDS Architects Inc, Somerville, Inc

AE Shortlist: Lien & Peterson Architects, Inc; KEE Architecture Inc; Frisbie Architects Inc; Somerville, Inc.
Selected AE: Somerville, Inc.

Project No.: 11A1X-01
Project Name: University Houses Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $11,598,000
AE Submittal Date: 11/27/2012 2:30:00 PM
Last Item Update: 2/4/2013 9:18:14 AM
AE Submitting Qualifications:

Angus Young Associates Inc in association with SHW Group , LLP; Architects Group Limited, BWZ Architects with association with Knothe & Bruce Architects LLC, Henneman Engineering Inc, Kindness Architecture & Planning, Welman Architects Inc

AE Shortlist: Kindness Architecture & Planning, Henneman Engineering Inc, Welman Architects Inc, BWZ Architect with association with Knothe & Bruce Architects LLC
Selected AE: BWZ Architects with association with Knothe & Bruce Architects LLC

Project No.: 12G3K
Project Name: Stout, McCalmont Hall Renovation
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: TOWN OF MENOMONIE, Wisconsin
Construction Cost: $5,946,000
AE Submittal Date: 11/6/2012 2:30:00 PM
Last Item Update: 2/20/2013 8:16:35 AM
AE Submitting Qualifications:

Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc, Assemblage Architects, BWBR Architects, Inc.; BWZ Architects, Cedar Corporation in association with Bray Associates Architects, Inc;  SDS Architects Inc, Somerville, Inc.

AE Shortlist: Somerville, Inc; BWZ Architects, BWBR Architects, Assemblage Architects
Selected AE: BWBR Architects, Inc.

Project No.: 12H2W
Project Name: New Student Center
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $40,396,000
AE Submittal Date: 11/1/2012 2:30:00 PM
Last Item Update: 2/4/2013 8:44:33 AM
AE Submitting Qualifications:

Eppstein Uhen Architects in association with Moody Nolan Inc, Kahler Slater Inc in association with Mackey Mitchell Architects, KEE Architecture Inc, Kindness Architecture & Planning, SDS Architects Inc, Strang Inc in association with Holzman Moss Bottino Architecture,  Uihlein Wilson Architects Inc, Workshop Architects Inc

AE Shortlist: SDS Architects Inc, KEE Architecture Inc, Kindness Architecture & Planning, Eppstein Uhen Architects in association with Moody Nolan Inc
Selected AE: Kindness Architecture & Planning

Project No.: 12B2E
Project Name: Construct Operations Center-JFHQ
Institution: MILITARY AFFAIRS/MADISON
Location: CITY OF MADISON, Wisconsin
Construction Cost: $4,895,176
AE Submittal Date: 8/28/2012 2:30:00 PM
Last Item Update: 10/30/2012 8:22:25 AM
AE Submitting Qualifications:

Angus Young Associates Inc, Boer Architects Inc in association with Epstein, BWZ Architects in association with Tactical Design, LLC; Fischer-Fischer-Theis, Inc.; HSR Associates Inc, Knight E/A Inc, Mead & Hunt Inc  in association with Mason & Hanger, Plunkett Raysich  Architects, Venture Architects

AE Shortlist: Mead & Hunt Inc in association with Mason & Hanger, Venture Architects, Fischer-Fischer-Theis, Inc.; Boer Architects Inc in association with Epstein
Selected AE: Venture Architects

Project No.: 12D1D
Project Name: New Residence Hall
Institution: UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
Location: CITY OF EAU CLAIRE, Wisconsin
Construction Cost: $26,000,000
AE Submittal Date: 7/17/2012 2:30:00 PM
Last Item Update: 10/30/2012 8:21:41 AM
AE Submitting Qualifications:

Angus Young Associates Inc in association with SHW Group, LLP; Berners Schober Associates Inc in association with VOA Associates Incorporated; Boer Architects Inc. with association with Booth Hansen; Bray Associates Architects, Inc in association with KSQ Architects, PC; Dorschner Associates Inc in association with Sasaki Associates Inc; Engberg Anderson Inc; Eppstein Uhen Architects; Frisbie Architects Inc in association with Mackey Mitchell Architects; Groth Design Group Inc in association with BLDD Architects, Inc.; Mayer Helminiak Architects LLC; Potter Lawson Inc; SDS Architects Inc; Uihlein Wilson Architects Inc

AE Shortlist: Eppstein Uhen Architects; Berners Schober Associates Inc in association with VOA Associates Incorporated; Engberg Anderson Inc; SDS Architects Inc
Selected AE: Engberg Anderson Inc

Project No.: 12C3M
Project Name: WCGP Boiler Replacement
Institution: CORRECTIONS/CENTRAL GENERATING PLANT, WAUPUN
Location: CITY OF WAUPUN, Wisconsin
Construction Cost: $7,000,000
AE Submittal Date: 6/26/2012 2:30:00 PM
Last Item Update: 8/29/2012 8:18:23 AM
AE Submitting Qualifications:

Affiliated Engineers Inc with Ross Infrastructure, LLC, an Affiliated Engineers, Inc Firm; Henneman Engineering Inc; Karges-Faulconbridge, Inc.; MEP Associates LLC in association with Fosdick & Hilmer Inc; Poyry LLC; Raasch Associates Inc; TCGroup Inc in association with Stantec Consulting Services Inc

AE Shortlist: Raasch Associates Inc; Henneman Engineering Inc; Poyry LLC
Selected AE: Raasch Associates Inc

Project No.: 11H2A
Project Name: WMHI Boiler Replacement
Institution: HEALTH SERVICES/WINNEBAGO MENTAL HEALTH INSTITUTE
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $4,450,000
AE Submittal Date: 6/26/2012 2:30:00 PM
Last Item Update: 8/29/2012 8:18:47 AM
AE Submitting Qualifications:

Affiliated Engineers Inc with Ross Infrastructure, LLC, an Affiliated Engineers, Inc Firm; Grumman Butkus Associates; Henneman Engineering Inc; Karges-Faulconbridge, Inc.; MEP Associates LLC in association with Fosdick & Hilmer Inc; Poyry LLC; Raasch Associates Inc; Ring & DuChateau, LLP in association with Sebesta Blomberg & Associates Inc; TCGroup Inc in association with Stantec Consulting Services Inc

AE Shortlist: Raasch Associates Inc; Henneman Engineering Inc; Poyry LLC; Ring & DuChateau, LLP in association with Sebesta Blomberg & Associates Inc
Selected AE: Raasch Associates Inc

Project No.: 10E3R
Project Name: Readiness Center Add/Alt
Institution: MILITARY AFFAIRS/PORTAGE
Location: CITY OF PORTAGE, Wisconsin
Construction Cost: $4,500,000
AE Submittal Date: 6/12/2012 2:30:00 PM
Last Item Update: 8/20/2012 8:50:19 AM
AE Submitting Qualifications:

Architects Group Limited, Architectural Design Group LLC in association with Leo A Daly, Assemblage Architects, BWZ Architects, FEH Associates Inc., Fischer-Fischer-Theis, Inc.; HSR Associates Inc, Mead & Hunt Inc in association with Mason & Hanger, Short Elliot Hendrickson Inc in association with Cox Group Architects, LLC

AE Shortlist: Architectural Design Group LLC in association with Leo A Daly, Fischer-Fischer-Theis, Inc.; Mead & Hunt Inc in association with Mason & Hanger, BWZ Architects
Selected AE: Fischer-Fischer-Theis, Inc.

Project No.: 12B1K
Project Name: UW Hospital Parking Ramp Expansion
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $24,545,000
AE Submittal Date: 5/10/2012 2:30:00 PM
Last Item Update: 6/29/2012 5:03:22 PM
AE Submitting Qualifications:

Arnold & O’Sheridan, Inc.; BWZ Architects in association with Carl Walker Inc, Bloom Companies LLC, GRAEF, Henneman Engineering Inc, JSD Professional Services Inc in association with Kimley-Horn and Associates, Inc.

AE Shortlist: Arnold & O’Sheridan Inc., Bloom Companies LLC, JSD Professional Services Inc in association with Kimley-Horn and Associates, Inc.; GRAEF
Selected AE: GRAEF

Project No.: 11A1E
Project Name: River Falls, Falcon Center
Institution: UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
Location: CITY OF RIVER FALLS, Wisconsin
Construction Cost: $49,004,000
AE Submittal Date: 5/8/2012 2:30:00 PM
Last Item Update: 7/2/2012 7:51:21 AM
AE Submitting Qualifications: AECOM USA, Inc.; Angus Young Associates Inc.in association with GMB Architecture + Engineering, Ayres Associates Inc in association with Hastings+Chivetta Architects, Inc.; Berners Schober Associates Inc in association with VOA Associates Incorporated, Bray Associates Architects, Inc. in association with Hastings+Chivetta Architects, Inc.; Continuum Architects & Planners S C in association with SmithGroupJJR, Frisbie Architects Inc in association with Moody Nolan Inc, HSR Associates Inc in association with RDG Planning & Design, Kahler Slater Inc, Potter Lawson Inc in association with Cannon Design, SDS Architects Inc in association with Dewberry Architects Inc., Somerville, Inc.in association with Pelli Clarke Pelli Architects
AE Shortlist: AECOM USA, Inc.; Ayres Associates Inc in association with Hastings+Chivetta Architects, Inc., SDS Architects in association with Dewberry Architects, Inc., HSR Associates Inc in association with RDG Planning & Design
Selected AE: Ayres Associates Inc in association with Hastings+Chivetta Architects, Inc.

Project No.: 11I2E
Project Name: Renovation of Clow Social Science Center
Institution: UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $18,163,000
AE Submittal Date: 4/3/2012 2:30:00 PM
Last Item Update: 5/22/2012 3:56:33 PM
AE Submitting Qualifications:

Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc; Berners Schober Associates Inc; Bray Associates Architects, Inc. in association with Stantec Architecture Inc; Continuum Architects & Planners S C; Dorschner Associates Inc in association with Harley Ellis Devereaux; Groth Design Group Inc in association with BSA LifeStructures; Hammel Green & Abrahamson Inc; Kahler Slater Inc; McMahon; Rinka Chung Architecture Inc in association with Legat Architects; Strang Inc in association with Richter Cornbrooks Gribble, Inc

AE Shortlist: Strang Inc in association with Richter Cornbrooks Gribble, Inc; Kahler Slater Inc; Groth Design Group Inc in association with BSA LifeStructures; Dorschner Associates Inc in association with Harley Ellis Devereaux
Selected AE: Kahler Slater Inc

Project No.: 11L2J
Project Name: West Campus Res Hall Renovation
Institution: UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
Location: CITY OF WHITEWATER, Wisconsin
Construction Cost: $9,522,000
AE Submittal Date: 3/22/2012 2:30:00 PM
Last Item Update: 5/17/2012 8:07:06 AM
AE Submitting Qualifications:

Barrientos Design & Consulting, Inc.; Boer Architects Inc in association with Booth Hansen, Bray Associates Architects Inc in association with Stantec Architecture Inc., BWZ Architects, Continuum Architects & Planners S C, Dorschner Associates Inc in association with RADA Architects, Engberg Anderson Inc, Eppstein Uhen Architects, Groth Design Group Inc in association with BLDD Architects Inc, Korb Tredo Architects Inc, Mayer Helminiak Architects LLC, Mead & Hunt Inc, Potter Lawson Inc, Rinka Chung Architecture Inc in association with Trivers Associates, Somerville Inc

AE Shortlist: Mayer Helminiak Architects LLC, Groth Design Group Inc in association with BLDD Architects, Inc; Mead & Hunt Inc, Korb Tredo Architects Inc
Selected AE: Mead & Hunt Inc

Project No.: 11I1X
Project Name: Stout, Harvey Hall Renovation - Ph II
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: CITY OF MENOMONIE, Wisconsin
Construction Cost: $19,859,000
AE Submittal Date: 2/9/2012 2:30:00 PM
Last Item Update: 4/6/2012 10:20:07 AM
AE Submitting Qualifications:

Aro Eberle Architects; Bloom Companies LLC in association with James G. Otto Architect, LLC; BWZ Architects; Dorschner Associates Inc in association with Miller Dunwiddie Architecture Inc; Eppstein Uhen Architects; Frisbie Architects Inc in association with Mackey Mitchell Architects; Hammel Green & Abrahamson Inc; Krech Ojard & Associates; River Architects Inc; SDS Architects Inc; Strang Inc

AE Shortlist: Aro Eberle Architects; River Architects Inc; Strang Inc; SDS Architects Inc
Selected AE: River Architects Inc

Project No.: 10C4L
Project Name: Reconstruct Montello Dam
Institution: NATURAL RESOURCES/MONTELLO DAM
Location: CITY OF MONTELLO, Wisconsin
Construction Cost: $7,120,300
AE Submittal Date: 2/2/2012 2:30:00 PM
Last Item Update: 3/30/2012 9:42:48 AM
AE Submitting Qualifications:

AECOM USA Inc, Ayres Associates Inc, CDM Smith Inc. in association with Bloom Companies LLC, Mead & Hunt Inc, MWH Americas Inc

AE Shortlist: Mead & Hunt Inc, AECOM USA Inc, MWH Americas Inc, Ayres Associates Inc
Selected AE: Mead & Hunt Inc

Project No.: 11F3C
Project Name: Residence Halls Renovation Dobson & Melcher
Institution: UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
Location: CITY OF PLATTEVILLE, Wisconsin
Construction Cost: $9,882,000
AE Submittal Date: 11/29/2011 2:30:00 PM
Last Item Update: 1/30/2012 3:16:01 PM
AE Submitting Qualifications:

American Design Inc in association with Eppstein Uhen Architects, Angus Young Associates Inc in association with Treanor Architects, Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc, Assemblage Architects, Bray Associates Architects Inc, Engberg Anderson Inc, HSR Associates Inc in association with KINDNESS architecture + planning, Krech Ojard & Associates in association with Bentz Thompson Rietow Architects, Inc, Mead & Hunt Inc in association with BWZ Architects, Zimmerman Architectural Studios Inc

AE Shortlist: ASSEMBLAGE ARCHITECTS, MEAD & HUNT INC INC in association with BWZ ARCHITECTS, ANGUS YOUNG ASSOCIATES INC in association with TREANOR ARCHITECTS, ENGBERG ANDERSON INC
Selected AE: Assemblage Architects

Project No.: 09K1K CMAR
Project Name: WI Union Redevelopment Project
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $37,753,000
AE Submittal Date: 11/14/2011 2:00:00 PM
Last Item Update: 12/20/2011 12:03:26 PM
AE Submitting Qualifications: The Boldt Company, Camosy Construction, CD Smith Construction Services, CG Schmidt, Gilbane Building Company, Hunzinger Construction Company, JH Findorff & Son, JP Cullen & Sons, Lend Lease Construction in association with Maas Brothers Construction, Mortenson Construction
AE Shortlist: The Boldt Company, CG Schmidt, JH Findorff & Son, Mortenson Construction
Selected AE: THE BOLDT COMPANY

Project No.: 11F1X
Project Name: Elizabeth Waters Hall Renovations
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $5,342,000
AE Submittal Date: 9/1/2011 2:30:00 PM
Last Item Update: 10/28/2011 11:26:30 AM
AE Submitting Qualifications:

Assemblage Architects, Bray Associates Architects Inc, BWZ Architects, Engberg Anderson Inc, Korb Tredo Architects Inc, Potter Lawson Inc, Somerville Inc, Strang Inc

AE Shortlist: ASSEMBLAGE ARCHITECTS, POTTER LAWSON INC, SOMERVILLE INC, BWZ ARCHITECTS
Selected AE: SOMERVILLE INC

Project No.: 10H3A CMAR
Project Name: Madison, Student Athlete Performance Ctr
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $58,400,000
AE Submittal Date: 8/25/2011 2:00:00 PM
Last Item Update: 10/10/2011 12:43:39 PM
AE Submitting Qualifications:

The Boldt Company; CD Smith Construction Services; CG Schmidt, Inc; Hunzinger Construction Company; J.H. Findorff and Son, Inc; J.P. Cullen & Sons, Inc; Mortenson Construction

AE Shortlist: CG SCHMIDT INC, JH FINDORFF AND SON INC, JP CULLEN AND SONS INC, MORTENSON CONSTRUCTION
Selected AE: JP Cullen & Sons, Inc

Project No.: 11C2L
Project Name: MIL NWQ Children’s Center Renovation
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $9,127,300
AE Submittal Date: 8/18/2011 2:30:00 PM
Last Item Update: 10/5/2011 8:08:37 AM
AE Submitting Qualifications:

American Design Inc in association with Ross Barney Architects, Hammel Green & Abrahamson Inc in association with Holabird & Root LLC, Quorum Architects Inc.,  Zimmerman Architectural Studios Inc

AE Shortlist: ZIMMERMAN ARCHITECTURAL STUDIOS INC, QUORUM ARCHITECTS INC
Selected AE: QUORUM ARCHITECTS INC

Project No.: 11C1O
Project Name: Ross and Hawkes Halls Renovation
Institution: UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
Location: CITY OF SUPERIOR, Wisconsin
Construction Cost: $12,140,000
AE Submittal Date: 6/14/2011 2:30:00 PM
Last Item Update: 8/2/2011 3:44:14 PM
AE Submitting Qualifications:

Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc, Assemblage Architects, Ayres Associates Inc in association with Design Plus, Inc; Frisbie Architects Inc in association with Mackey Mitchell Architects, Korb Tredo Architects Inc, Krech Ojard Architects Inc in association with Bentz Thompson Rietow Architects, Inc; Lien & Peterson Architects, Inc; McMahon, Potter Lawson Inc, SDS Architects Inc, Workshop Architects Inc

AE Shortlist: SDS ARCHITECTS INC, KRECH OJARD & ASSOCIATES in association with BENTZ THOMPSON RIETOW ARCHITECTS, INC, ARCHITECTURAL DESIGN GROUP LLC in association with RAFFERTY RAFFERTY TOLLEFSON LINDEKE ARCHITECTS INC, WORKSHOP ARCHITECTS INC in association with LHB INC
Selected AE: WORKSHOP ARCHITECTS INC in association with LHB INC

Project No.: 11A2C
Project Name: N DeBot Residence Halls Renovation Ph I
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $9,621,000
AE Submittal Date: 4/4/2011 2:30:00 PM
Last Item Update: 5/19/2011 3:05:49 PM
AE Submitting Qualifications:

American Design Inc in association with Eppstein Uhen Architects; Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc;  Assemblage Architects; Boer Architects Inc in association with BLDD Architects Inc; Bray Associates Architects Inc (Milwaukee and Sheboygan); Cox & Associates; Engberg Anderson Inc; Grumman Butkus Associates; McMahon; SDS Architects Inc;  Somerville Inc; Zimmerman Architectural Studios Inc

AE Shortlist: Grumman Butkus Associates, Assemblage Architects, American Design Inc in association with Eppstein Uhen Architects, Somerville Inc
Selected AE: Somerville Inc

Project No.: 10K1H
Project Name: WCCF Chiller Addition
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $53,691,000
AE Submittal Date: 3/15/2011 2:30:00 PM
Last Item Update: 5/3/2011 7:46:37 AM
AE Submitting Qualifications:

Affiliated Engineers Inc, GRAEF in association with Ring & DuChateau, LLP, Henneman Engineering Inc in association with RMF Engineering Inc, Syska Hennessy Group Inc in association with Stanley Consultants Inc

AE Shortlist: Affiliated Engineers Inc, GRAEF in association with Ring & DuChateau, LLP, Henneman Engineering Inc in association with RMF Engineering Inc, Syska Hennessy Group Inc in association with Stanley Consultants Inc
Selected AE: Affiliated Engineers Inc

Project No.: 10D2Q CMAR
Project Name: MIL IRC
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF WEST ALLIS, Wisconsin
Construction Cost: $59,186,281
AE Submittal Date: 3/3/2011 2:00:00 PM
Last Item Update: 5/10/2011 12:51:29 PM
AE Submitting Qualifications: THE BOLDT COMPANY, BOVIS LEND LEASE/ARTEAGA CONSTRUCTION INC, CD SMITH CONSTRUCTION SERVICES, CG SCHMIDT, GILBANE BUILDING COMPANY, HUNZINGER BUILDERS/F.A WILHELM, JH FINDORFF & SONS, JP CULLEN & SONS, INC, M A MORTENSON CONSTRUCTION, MIRON/MCCARTHY, VJS CONSTRUCTION SERVICES
AE Shortlist: CG Schmidt Inc, Gilbane Building Company, Miron Construction Company/McCarthy Building Companies, Mortenson Construction
Selected AE: CG SCHMIDT, INC

Project No.: 10K2G
Project Name: Carson Gully Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MIDDLETON, Wisconsin
Construction Cost: $7,207,000
AE Submittal Date: 2/1/2011 2:30:00 PM
Last Item Update: 3/21/2011 10:47:32 AM
AE Submitting Qualifications:

Assemblage Architects, Boer Architects Inc in association with HBRA Architects, Connolly Architects Inc, Engberg Anderson Inc, HSR Associates Inc, KEE Architecture Inc, Mead & Hunt Inc, SDS Architects Inc, Teng & Associates Inc, TWP Architecture, Workshop Architects Inc

AE Shortlist: ASSEMBLAGE ARCHITECTS, BOER ARCHITECTS INC in association with HBRA ARCHITECTS, KEE ARCHITECTURE INC; WORKSHOP ARCHITECTS INC
Selected AE: KEE ARCHITECTURE INC

Project No.: 10J2S
Project Name: Parking Ramp and Police Services Building
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $10,000,000
AE Submittal Date: 1/6/2011 2:30:00 PM
Last Item Update: 3/16/2011 2:31:24 PM
AE Submitting Qualifications:

Angus Young Associates Inc , Arnold & O Sheridan Inc, Bloom Companies, LLC, Engberg Anderson Inc, Frisbie Architects Inc in association with Collaborative Design Group Inc, GRAEF,

Gries Architectural Group Inc, Harwood Engineering Consultants Ltd, Henneman Engineering Inc, HSR Associates Inc, SDS Architects Inc in association with Palanisami & Associates Inc, Somerville Inc

AE Shortlist: Arnold & O Sheridan Inc, Bloom Companies, LLC, Henneman Engineering Inc, GRAEF
Selected AE: GRAEF

Project No.: 10H3A
Project Name: Madison, Student Athlete Performance Ctr
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $56,800,000
AE Submittal Date: 11/9/2010 2:30:00 PM
Last Item Update: 12/15/2010 4:20:16 PM
AE Submitting Qualifications:

Berners Schober Associates Inc in association with VOA Associates Incorporated; Engberg Anderson Inc in association with 360 Architecture Inc; Eppstein Uhen Architects in association with HNTB Architecture; Kahler Slater Inc; Potter Lawson Inc in association with Cannon Design

AE Shortlist: POTTER LAWSON INC in association with CANNON DESIGN; BERNERS SCHOBER ASSOCIATES INC in association with VOA ASSOCIATES INCORPORATED; EPPSTEIN UHEN ARCHITECTS in association with HNTB ARCHITECTURE; KAHLER SLATER INC
Selected AE: BERNERS SCHOBER ASSOCIATES INC in association with VOA ASSOCIATES INCORPORATED

Project No.: 10D2Q
Project Name: MIL IRC
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF WEST ALLIS, Wisconsin
Construction Cost: $59,950,000
AE Submittal Date: 10/13/2010 2:30:00 PM
Last Item Update: 11/19/2010 3:53:23 PM
AE Submitting Qualifications:

Engberg Anderson Inc in association with SmithGroup Inc; Flad Architects; Hammel Green & Abrahamson Inc; Kahler Slater Inc in association with ZGF Architects LLP; Plunkett Raysich Architects; Strang Inc in association with BSA LifeStructures; Teng & Associates Inc; Zimmerman Architectural Studios Inc in association with HOK Chicago , HOK Atlanta

AE Shortlist: Flad Architects; Kahler Slater Inc in association with ZGF Architects LLP; Strang Inc in association with BSA LifeStructures; Hammel Green & Abrahamson Inc
Selected AE: Flad Architects

Project No.: 10F2J
Project Name: Music Performance Building
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $33,104,000
AE Submittal Date: 10/12/2010 2:30:00 PM
Last Item Update: 11/19/2010 11:39:40 AM
AE Submitting Qualifications:

Angus Young Associates Inc in association with Cannon Design; Bray Associates Architects Inc in association with Zeidler Partnership Inc. Architects; Continuum Architects & Planners S C in association with Pfeiffer Partners Architects Inc; Dorschner Associates Inc in association with Trahan Architects; Engberg Anderson Inc in association with Ennead Architects LLP; Flad Architects; Hammel Green & Abrahamson Inc; La Dallman Architects Inc in association with Barton Myers Associates Inc; Potter Lawson Inc in association with LMN Architects; Somerville Inc in association with Westlake Reed Lekosky; Strang Inc in association with Holzman Moss Bottino Architecture; The Kubala Washatko Architects, Inc. in association with William Rawn Associates Architects Inc; Workshop Architects Inc in association with Boora Architects

AE Shortlist: Strang Inc in association with Holzman Moss Bottino Architecture; The Kubala Washatko Architects, Inc. in association with William Rawn Associates Architects Inc; Flad Architects; Continuum Architects & Planners S C in association with Pfeiffer Partners Architects Inc
Selected AE: Strang Inc in association with Holzman Moss Bottino Architecture

Project No.: 10G3D
Project Name: Lakeshore Residence Hall PH II
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $10,489,000
AE Submittal Date: 9/20/2010 2:30:00 PM
Last Item Update: 11/2/2010 10:26:16 AM
AE Submitting Qualifications:

Boer Architects Inc in association with BLDD Architects, Inc., BWZ Architects, Dorschner Associates Inc, Eppstein Uhen Architects, Johnsen Schmaling Architects in association with Baird Sampson Neuert Architects Inc., Potter Lawson Inc, The Kubala Washatko Architects, Inc. in association with Mackey Mitchell Architects

AE Shortlist: The Kubala Washatko Architects, Inc. in association with Mackey Mitchell Architects, BWZ Architects, Boer Architects Inc in association with BLDD Architects, Inc., Eppstein Uhen Architects
Selected AE: Eppstein Uhen Architects

Project No.: 08A1Z
Project Name: UWEC, Education Building
Institution: UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
Location: CITY OF EAU CLAIRE, Wisconsin
Construction Cost: $31,042,800
AE Submittal Date: 9/14/2010 2:30:00 PM
Last Item Update: 10/22/2010 1:42:52 PM
AE Submitting Qualifications:

Angus Young Associates Inc in association with Treanor Architects, Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc, Ayres Associates Inc in association with DLR Group, Berners Schober Associates Inc in association with         VOA Associates Incorporated, Boer Architects Inc in association with Holabird & Root LLC, Eppstein Uhen Architects in association with PSA-Dewberry Inc, Hammel Green & Abrahamson Inc, River Architects Inc, SDS Architects Inc in association with BWBR Architects Inc, Teng & Associates Inc, Workshop Architects Inc in association with Lord Aeck & Sargent Architecture

AE Shortlist: SDS Architects Inc in association with BWBR Architects Inc, Eppstein Uhen Architects in association with PSA-Dewberry Inc, River Architects Inc, Workshop Architects Inc in association with Lord Aeck & Sargent Architecture
Selected AE: River Architects, Inc.

Project No.: 10E3F
Project Name: Stout, Fleming Hall Renovation
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: CITY OF MENOMONIE, Wisconsin
Construction Cost: $4,785,400
AE Submittal Date: 8/31/2010 2:30:00 PM
Last Item Update: 10/5/2010 3:24:19 PM
AE Submitting Qualifications:

Boer Architects Inc, Boldt Technical Services, Groth Design Group Inc, Kehoe-Henry & Associates, Inc., Lien & Peterson Architects, Inc;  McMahon, SDS Architects Inc

AE Shortlist: LIEN & PETERSON ARCHITECTS, INC; GROTH DESIGN GROUP INC, BOER ARCHITECTS INC., McMAHON
Selected AE: Lien & Peterson Architects, Inc

Project No.: 10E1A
Project Name: Tactical Unmanned Aircraft Sys Fac
Institution: MILITARY AFFAIRS/CAMP WILLIAMS
Location: VILLAGE OF CAMP DOUGLAS, Wisconsin
Construction Cost: $6,480,250
AE Submittal Date: 8/10/2010 2:30:00 PM
Last Item Update: 10/1/2010 3:38:41 PM
AE Submitting Qualifications:

Bailey Edward Architecture, Barrientos Design & Consulting LLC, Bray Associates Architects Inc in association with DRS Architects, Inc., BWZ Architects, Fischer Fischer Theis Inc, Gries Architectural Group Inc in association with KMA Architecture & Engineering, HSR Associates Inc, Mead & Hunt Inc

AE Shortlist: HSR ASSOCIATES INC; BWZ ARCHITECTS; MEAD & HUNT INC; FISCHER FISCHER THEIS INC
Selected AE: Fischer Fischer Theis Inc

Project No.: 10E3H
Project Name: MIL SFS Addn Ph 1
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $36,997,500
AE Submittal Date: 7/13/2010 2:30:00 PM
Last Item Update: 9/7/2010 11:09:13 AM
AE Submitting Qualifications:

Boer Architects Inc in association with Holabird & Root LLC, Camp Dresser & McKee Inc in association with Perkins& Will in association with Bloom Companies LLC, Continuum Architects & Planners S C in  association with Bohlin Cywinski Jackson, Engberg Anderson Inc in association with SmithGroup Inc, Eppstein Uhen Architects in association with HOK Chicago and HOK, Flad Architects, Hammel Green & Abrahamson Inc, Kahler Slater Inc in association with Gould Evans, Korb Tredo Architects Inc in association with Payette, La Dallman Architects Inc in association with Tsoi Kobus & Associates, Inc.; Plunkett Raysich Architects, Strang Inc in association with HDR Architecture Inc, Workshop Architects Inc in association with Lord Aeck & Sargent Architecture

AE Shortlist: CONTINUUM ARCHITECTS + PLANNERS in association with BOHLIN CYWINSKI JACKSON, HAMMEL GREEN AND ABRAHAMSON, INC, PLUNKETT RAYSICH ARCHITECTS, LLP; STRANG, INC. in association with HDR ARCHITECTURE, INC.
Selected AE: Continuum Architects + Planners in association with Bohlin Cywinski Jackson

Project No.: 10F1P
Project Name: UW MSN WIMR CMAR
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $102,700,000
AE Submittal Date: 7/9/2010 2:00:00 PM
Last Item Update: 8/26/2010 8:16:13 AM
AE Submitting Qualifications: The Boldt Company, CG Schmidt, Inc., J.H. Findorff and Son, Inc., Mortenson Construction, Vogel in association with Gilbane
AE Shortlist: The Boldt Company, CG Schmidt, Inc., J.H. Findorff and Son, Inc., Vogel in association with Gilbane
Selected AE: THE BOLDT COMPANY

Project No.: 10B1X
Project Name: Carlson Hall Renovation
Institution: UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
Location: CITY OF WHITEWATER, Wisconsin
Construction Cost: $12,368,000
AE Submittal Date: 5/19/2010 2:30:00 PM
Last Item Update: 7/1/2010 12:22:37 PM
AE Submitting Qualifications:

American Design Inc, Angus Young Associates Inc, Aro Eberle Architects, Assemblage Architects, Boer Architects Inc, Bouril Design Studio in association with HLKB Architecture, Bray Associates Architects Inc, Continuum Architects & Planners S C, Dorschner Associates Inc in association with Harley Ellis Devereaux, Engberg Anderson Inc, Eppstein Uhen Architects, Groth Design Group Inc, Mead & Hunt Inc in association with Architectural Alliance International, PSA Dewberry with PSA-Dewberry Inc, Somerville Inc, Strang Inc, The Kubala Washatko Architects, Inc.

AE Shortlist: EPPSTEIN UHEN ARCHITECTS, ANGUS YOUNG ASSOCIATES INC, CONTINUUM ARCHITECTS & PLANNERS S C, STRANG INC
Selected AE: STRANG INC

Project No.: 09G3P
Project Name: Construct Field Main Shop WAUSAU
Institution: MILITARY AFFAIRS/WAUSAU
Location: CITY OF WAUSAU, Wisconsin
Construction Cost: $11,058,000
AE Submittal Date: 5/13/2010 2:30:00 PM
Last Item Update: 6/24/2010 9:49:31 AM
AE Submitting Qualifications:

Angus Young Associates Inc, Ayres Associates Inc, Barrientos Design & Consulting LLC, Boer Architects Inc in association with Epstein, Cox & Associates in association with SSV Architecture Inc., Fischer Fischer Theis Inc, HSR Associates Inc, GRAEF, Gries Architectural Group Inc, MartinRiley Architects Engineers, Mead & Hunt Inc, Raasch Associates Inc, Short Elliot Hendrickson Inc, Somerville Inc

AE Shortlist: BARRIENTOS DESIGN & CONSULTING LLC, FISCHER FISCHER THEIS INC, GRAEF, HSR ASSOCIATES INC
Selected AE: HSR Associates Inc

Project No.: 09I1M
Project Name: UW-MSN Charter St HP EPC
Institution: ADMINISTRATION/
Location: CITY OF MADISON, Wisconsin
Construction Cost: $175,000,000
AE Submittal Date: 3/4/2010 2:00:00 PM
Last Item Update: 6/21/2010 1:39:27 PM
AE Submitting Qualifications: Bibb Engineers, Architects & Constructors in/a/w Fagen, Inc.; The Boldt Company in/a/w AMEC; J.H. Findorff and Son, Inc. in/a/w Burns & McDonnell in/a/w ANZO, Inc.; Miron Construction Co., Inc. in/a/w Black & Veatch; SNC-Lavalin Constructors Inc.; URS Corporation in/a/w ENGlobal
AE Shortlist: The Boldt Company in/a/w AMEC; Miron Construction Co., Inc. in/a/w Black & Veatch; SNC-Lavalin Constructors Inc.; URS Corporation in/a/w ENGlobal
Selected AE: The Boldt Company in association with AMEC

Project No.: 09K1K
Project Name: WI Union Redevelopment Project
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $37,753,000
AE Submittal Date: 2/22/2010 2:30:00 PM
Last Item Update: 4/15/2010 7:50:52 AM
AE Submitting Qualifications:

Engberg Anderson Inc in association with Design Collective, Inc;  Eppstein Uhen Architects in association with Finegold Alexander & Associates Inc, Hammel Green & Abrahamson Inc, Hammond Beeby Rupert Ainge Inc and Hammond Beeby Rupert Ainge Architects in association with Holabird & Root LLC and Martinez & Johnson Architecture, Plunkett Raysich Architects in association with Holzman Moss Bottino Architecture, Strang Inc in association with LMN Architects, The Kubala Washatko Architects, Inc. in association with Lord Aeck & Sargent Architecture, Uihlein Wilson Architects Inc in association with Moody Nolan Inc, Workshop Architects Inc in association with Quinn Evans Architects

AE Shortlist: WORKSHOP ARCHITECTS INC in association with QUINN EVANS ARCHITECTS, UIHLEIN WILSON ARCHITECTS in association with MOODY NOLAN INC, PLUNKETT RAYSICH ARCHITECTS in association with HOLZMAN MOSS BOTTINO ARCHITECTURE, THE KUBALA WASHATKO ARCHITECTS, INC. in association with LORD AECK & SARGENT ARCHITECTURE
Selected AE: UIHLEIN WILSON ARCHITECTS in association with MOODY NOLAN INC

Project No.: 09J3Y
Project Name: Madison, School of Nursing
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $37,619,000
AE Submittal Date: 2/9/2010 2:30:00 PM
Last Item Update: 3/23/2010 7:47:44 AM
AE Submitting Qualifications:

Boer Architects Inc in association with Holabird & Root LLC, Continuum Architects & Planners S C in association with HOK Chicago, Hammel Green & Abrahamson Inc, Eppstein Uhen Architects in association with Ayers Saint Gross, Flad Architects, Kahler Slater Inc, River Architects Inc in association with HDR Architecture Inc, Somerville Inc, Strang Inc in association with Richter Cornbrooks Gribble, Inc, Zimmerman Architectural Studios Inc

AE Shortlist: Continuum Architects & Planners S C in association with HOK Chicago, Kahler Slater Inc, Strang Inc in association with Richter Cornbrooks Gribble, Inc, Eppstein Uhen Architects in association with Ayers Saint Gross
Selected AE: Kahler Slater Inc

Project No.: 08C4J
Project Name: Co-located Labs-DATCP&WSLH
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MADISON, Wisconsin
Construction Cost: $22,618,000
AE Submittal Date: 2/2/2010 2:30:00 PM
Last Item Update: 3/11/2010 1:17:41 PM
AE Submitting Qualifications:

Boer Architects Inc in association with Perkins Eastman, Bray Associates Architects Inc in association with Lord Aeck & Sargent Architecture, Flad Architects, Plunkett Raysich Architects, Strang Inc

AE Shortlist: FLAD ARCHITECTS, BOER ARCHITECTS INC in association with PERKINS EASTMAN, STRANG INC, BRAY ASSOCIATES ARCHITECTS INC in association with LORD AECK & SARGENT ARCHITECTURE
Selected AE: Flad Architects

Project No.: 09K1J
Project Name: UWM Central Heating Plant Chiller Add
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $5,050,000
AE Submittal Date: 2/2/2010 2:30:00 PM
Last Item Update: 3/16/2010 9:24:33 AM
AE Submitting Qualifications:

Affiliated Engineers Inc, Boer Architects Inc in association with Epstein, Power Engineers Collaborative LLC, Raasch Associates Inc, Ring & DuChateau, LLP, Syska Hennessy Group Inc

AE Shortlist: AFFILIATED ENGINEERS INC, SYSKA HENNESSY GROUP INC, RAASCH ASSOCIATES INC, RING & DUCHATEAU, LLP
Selected AE: Ring & DuChateau, LLP

Project No.: 09H2K
Project Name: 1 W. Wilson Envelope Repairs
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MADISON, Wisconsin
Construction Cost: $10,700,000
AE Submittal Date: 1/19/2010 2:30:00 PM
Last Item Update: 2/26/2010 3:01:27 PM
AE Submitting Qualifications:

Bloom Companies LLC in association with James G. Otto Architect, Boer Architects Inc in association with Thornton Tomasetti Inc, BWZ Architects in association with Quinn Evans Architects, Facility Engineering Inc in association with Wiss Janney Elstner Associates,

GRAEF, InSite Consulting Services LLC in association with DSGW Architects, Inc, Specialty Engineering Group LLC in association with Moody Nolan Inc

AE Shortlist: BLOOM COMPANIES LLC in association with JAMES G. OTTO ARCHITECTS, LLC; GRAEF; FACILITY ENGINEERING INC in association with WISS JANNEY ELSTNER ASSOCIATES, BOER ARCHITECTS INC in association with THORNTON TOMASETTI INC
Selected AE: Bloom Companies LLC in association with James G. Otto Architects LLC

Project No.: 08J4P
Project Name: Wade House Visitor Ctr/Museum
Institution: HISTORICAL SOCIETY/WADE HOUSE, GREENBUSH
Location: TOWN OF GREENBUSH, Wisconsin
Construction Cost: $8,100,000
AE Submittal Date: 1/5/2010 2:30:00 PM
Last Item Update: 3/9/2010 4:49:25 PM
AE Submitting Qualifications: Boer Architects, Inc in association with Epstein; Bouril Design Studio, LLC in association with Holabird & Root; Bray Associates Architects, Inc in association with Barker Rinker Seacat Architecture; BWZ Architects, Inc in association with Quinn Evans Architects; Dorschner/Associates, Inc in association with Hammond Beeby Rupert Ainge Architects Inc; Engberg Anderson, Inc; Groth Design Group, Inc in association with Verner Johnson, Inc; The Kubala Washatko Architects, Inc; La Dallman Architects, Inc; MartinRiley architects-engineers; Quorum Architects, Inc; River Architects, Inc; Uihlein Wilson Architects
AE Shortlist: BOER ARCHITECTS, INC in association with EPSTEIN; LA DALLMAN ARCHITECTS, INC; THE KUBALA WASHATKO ARCHITECTS, INC; AND UIHLEIN WILSON ARCHITECTS
Selected AE: UIHLEIN WILSON ARCHITECTS

Project No.: 09A1D
Project Name: TCI Monarch & Segregation Annexes
Institution: CORRECTIONS/TAYCHEEDAH CORRECTIONAL INSTITUTION
Location: CITY OF FOND DU LAC, Wisconsin
Construction Cost: $5,763,800
AE Submittal Date: 12/14/2009 2:30:00 PM
Last Item Update: 2/2/2010 10:16:44 AM
AE Submitting Qualifications:

Mead & Hunt Inc, Kehoe Henry & Associates Inc, PSA Dewberry with PSA-Dewberry Inc, Somerville Inc, Venture Architects

AE Shortlist: VENTURE ARCHITECTS, MEAD & HUNT INC, KEHOE HENRY & ASSOCIATES INC, SOMERVILLE INC
Selected AE: Venture Architects

Project No.: 06E2B
Project Name: Skilled Nursing Facility
Institution: VETERANS AFFAIRS/WISCONSIN VETERANS HOME-CHIPPEWA FALLS
Location: CITY OF CHIPPEWA FALLS, Wisconsin
Construction Cost: $15,850,000
AE Submittal Date: 12/3/2009 2:30:00 PM
Last Item Update: 1/22/2010 9:39:42 AM
AE Submitting Qualifications:

Architectural Design Group Inc in association with Miller Hanson Partners;  Ayres Associates Inc in association with Nelson-Tremain Partnership;  Boer Architects Inc in association with PDC Midwest Inc;  Cedar Corporation in association with Loebl Schlossman & Hackl;  Dimension IV Madison Design Group in association with Sean Bujold & Associates Inc;  Engberg Anderson Inc;  

Frisbie Architects Inc in association with Nelson-Tremain Partnership;  HSR Associates Inc in association with Horty Elving and Associates Inc; Plunkett Raysich Architects;  Somerville Inc;  Strang Inc in association with Nelson-Tremain Partnership;  WAI Continuum

AE Shortlist: HSR ASSOCIATES INC in association with HORTY ELVING AND ASSOCIATES INC; STRANG INC in association with NELSON-TREMAIN PARTNERSHIP; AYRES ASSOCIATESE INC in association with NELSON-TREMAIN PARTNERSHIP; FRISBIE ARCHITECTS INC in association with NELSON-TREMAIN PARTNERSHIP
Selected AE: Frisbie Architects Inc in association with Nelson-Tremain Partnership

Project No.: 09I1N
Project Name: UW-MSN CM for WI Energy Initiative
Institution: ADMINISTRATION/
Location: CITY OF MADISON, Wisconsin
Construction Cost: $100,000,000
AE Submittal Date: 10/5/2009 2:00:00 PM
Last Item Update: 11/9/2009 1:51:51 PM
AE Submitting Qualifications: The Boldt Co, CG Schmidt, Gilbane Building Co, JH Findorff & Son Inc, JP Cullen & Sons, Inc, Kraemer Brothers, Miron Construction Co in JVw/Walsh Construction Co, MA Mortenson Construction, PCL Construction Services, Inc
AE Shortlist: THE BOLDT COMPANY, CG SCHMIDT, JP CULLEN & SONS, INC, MORTENSON CONSTRUCTION
Selected AE: MA Mortenson Company

Project No.: 09D3L
Project Name: Stout, Memorial Student Center Renov.
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: CITY OF MENOMONIE, Wisconsin
Construction Cost: $13,833,000
AE Submittal Date: 9/22/2009 2:30:00 PM
Last Item Update: 11/4/2009 8:07:31 AM
AE Submitting Qualifications:

Ayres Associates Inc in association with Design Plus, Inc;  Boer Architects Inc in association with Loebl Schlossman & Hackl;  Dorschner Associates Inc in association with Sasaki Associates Inc; 

Frisbie Architects Inc in association with Mackey Mitchell Architects;  KEE Architecture Inc;  PSA Dewberry;  SDS Architects Inc;  Strang Inc in association with LMN Architects;  Uihlein Wilson Architects Inc;  Yaggy Colby Associates in association with Kevin Hom & Andrew Goldman Architects PC

AE Shortlist: FRISBIE ARCHITECTS INC in association with MACKEY MITCHELL ARCHITECTS; KEE ARCHITECTURE INC; UIHLEIN WILSON ARCHITECTS INC; SDS ARCHITECTS INC
Selected AE: FRISBIE ARCHITECTS INC in association with MACKEY MITCHELL ARCHITECTS

Project No.: 09H2L
Project Name: State Archive Preservation Facility
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MADISON, Wisconsin
Construction Cost: $19,163,700
AE Submittal Date: 9/21/2009 2:30:00 PM
Last Item Update: 10/27/2009 4:09:32 PM
AE Submitting Qualifications:

BWZ Architects in association with Opus Architects & Engineers, Inc.; Engberg Anderson Inc in association with SmithGroup;  KEE Architecture Inc in association with Hammond Beeby Rupert Ainge Architects;  PSA Dewberry

AE Shortlist: ENGBERG ANDERSON INC in association with SMITHGROUP; PSA DEWBERRY; BWZ ARCHITECTS in association with OPUS ARCHITECTS & ENGINEERS, INC.
Selected AE: ENGBERG ANDERSON INC in association with SMITHGROUP

Project No.: 09H2D
Project Name: UW-MSN Athl/Hockey Fac CM
Institution: ADMINISTRATION/
Location: CITY OF MADISON, Wisconsin
Construction Cost: $22,292,000
AE Submittal Date: 9/3/2009 2:00:00 PM
Last Item Update: 9/28/2009 1:14:28 PM
AE Submitting Qualifications: CD Smith Construction Services, Fond du Lac, WI; Walsh Construction Co, Chicago, Ill; Hunzinger Construction Co, Milwaukee, WI; Miron Construction CO, Neenah, WI; JP Cullen & Sons, Janesville, WI, Vogel Bros Building CO, Madison, WI;  KBS Co joint venture with Huffman Facility Dev. Inc, Madison, WI; Gilbane Building Co, Milwaukee, WI;  Mortenson Construction Co, Madison, WI; Oscar J Boldt Construction Co, Madison, WI;  JH Findorff Construction CO, Madison, WI;  CG Schmidt Co, Madison, WI
AE Shortlist: Oscar Boldt Co, Madison, WI; Gilbane Building Co, Milwaukee, WI; J H Findorff Co, Madison, WI; Mortenson Construction Co, Madison, WI
Selected AE: JH FINDORFF & SON, INC.

Project No.: 09D2H
Project Name: UWRF South Fork Suites Addition
Institution: UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
Location: CITY OF RIVER FALLS, Wisconsin
Construction Cost: $15,654,000
AE Submittal Date: 8/4/2009 2:30:00 PM
Last Item Update: 9/10/2009 1:55:21 PM
AE Submitting Qualifications:

Angus Young Associates Inc in association with Treanor Architects, Ayres  Associates Inc in association with Design Plus, Inc, Boer Architects Inc in association with Lohan Anderson LLC, Bouril Design Studio in association with KSQ Architects PC, Frisbie Architects Inc in association with Mackey Mitchell Architects, Mayer Helminiak Architects LLC, McMahon, SDS Architects Inc, William Wenzler & Associates Architects Inc

AE Shortlist: ANGUS YOUNG ASSOCIATES Inc in association with TREANOR ARECHITECTS, AYRES ASSOCIATES Inc in association with DESIGN PLUS, INC, FRISBIE ARCHITECTS INC in association with MACKEY MITCHELL ARCHITECTS, SDS ARCHITECTS INC
Selected AE: SDS Architects Inc

Project No.: 09D2U
Project Name: Phy Plant Shops/Office Bldg
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $4,600,000
AE Submittal Date: 7/15/2009 2:00:00 PM
Last Item Update: 8/12/2009 10:32:50 AM
AE Submitting Qualifications: MSI General Contractors, Howard Immel Inc/BSA, Miron Construction Co/Eppstein Uhen, Alexander Co/Bachmann Construction,Tri-North Builders, CD Smith Construction/PRA, JH Findorff/Strand, Ideal Builders/Shulfer Architects, Iconica, Kraemer Bros/Strang, ACS/KBS/Flad, Mortenson Co/Assemblage Architects, Hunzinger Co/Zimmerman Design, CG Schmidt/Bray Architects, JP Cullen & Sons/GRAEFF,
AE Shortlist: Kraemer Brothers, Miron Construction, Iconica, Mortenson Construction Co
Selected AE: Kraemer Bros, Plain, WI

Project No.: 08A2E
Project Name: WI Energy Institute
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $75,673,000
AE Submittal Date: 4/30/2009 2:30:00 PM
Last Item Update: 6/2/2009 11:11:40 AM
AE Submitting Qualifications:

Flad & Associates dba Flad Architects with Flad & Associates dba Flad Architects Inc; Hammel Green & Abrahamson Inc in association with Zimmer Gunsul Frasca Architects LLP; HDR Architecture Inc with HDR Archs & Engrs PC; Plunkett Raysich Architects in association with CO Architectsl; Potter Lawson Inc; Strang Inc in association with SmithGroup, Inc.; Yaggy Colby Associates in association with Stantec Consulting Services Inc and Stantec Architecture Ltd and Stantec Consulting Ltd; Zimmerman Architectural Studios Inc

AE Shortlist: STRANG INC in association with SMITHGROUP, INC.; PLUNKETT RAYSICH ARCHITECTS in association with CO ARCHTECTS; FLAD & ASSOCIATES dba FLAD ARCHITECTS with FLAD & ASSOCIATES dba FLAD ARCHITECTS INC; POTTER LAWSON INC
Selected AE: POTTER LAWSON INC

Project No.: 09B1U
Project Name: Madison - Hockey/Swimming Facility
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $22,292,000
AE Submittal Date: 4/28/2009 2:30:00 PM
Last Item Update: 5/28/2009 3:09:38 PM
AE Submitting Qualifications:

Bray Associates Architects Inc in association with HNTB Architecture and HNTB Corporation, Engberg Anderson Inc in association with Cannon Design and Cannon Design Architecture and Cannon Design dba Cannon Boston Inc, Kahler Slater Inc, Potter Lawson Inc, The Durrant Group Inc in association with JLG Architects, Uihlein Wilson Architects Inc in association with RDG Planning & Design, Zimmerman Architectural Studios Inc in association with Populous

AE Shortlist: UIHLEIN WILSON ARCHITECTS INC in association with RDG PLANNING & DESIGN, THE DURRANT GROUP INC in association with JLG ARCHITECTS, POTTER LAWSON INC, KAHLER SLATER INC
Selected AE: KAHLER SLATER INC

Project No.: 09A3E
Project Name: Gordon Commons
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $31,695,000
AE Submittal Date: 4/21/2009 2:30:00 PM
Last Item Update: 5/22/2009 4:20:10 PM
AE Submitting Qualifications: Angus Young Associates Inc in association with Cuningham Group Architecture, Berners Schober Associates Inc association with VOA Associates Incorporated, Bray Associates Architects Inc in association with Mesher Shing Architects in association with Burt Hill, Engberg Anderson Inc in association with Livermore Edwards & Associates, KEE Architecture Inc in association with Perry Dean Rogers Partners Architects, Potter Lawson Inc in association with Cannon Design, Quality Management Services Inc, Strang Inc in association with MHTN Architects Inc, The Durrant Group Inc in association with  Mackey Mitchell Architects, Yaggy Colby Associates in association with Kevin Hom & Andrew Goldman Architects PC, Zingg Design Inc in association with OWP/P
AE Shortlist: STRANG INC in association with MHTN ARCHITECTS INC, POTTER LAWSON INC in association with CANNON DESIGN, THE DURRANT GROUP, INC. in association with MACKEY MITCHELL ARCHITECTS, ENGBERG ANDERSON INC in association with LIVERMORE EDWARDS & ASSOCIATES
Selected AE: POTTER LAWSON INC in association with CANNON DESIGN

Project No.: 09A3F
Project Name: Fischer & Wellers Halls Renov.
Institution: UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
Location: CITY OF WHITEWATER, Wisconsin
Construction Cost: $7,134,000
AE Submittal Date: 4/16/2009 2:30:00 PM
Last Item Update: 5/15/2009 12:31:26 PM
AE Submitting Qualifications:

Angus Young Associates Inc in association with Treanor Architects, Boer Architects Inc in association with Lohan Anderson LLC, BWZ Architects, Eppstein Uhen Architects, HGM Architecture Inc, Kehoe Henry & Associates Inc, Mayer Helminiak Architects LLC, McMahon, The Durrant Group Inc, Uihlein Wilson Architects Inc

AE Shortlist: BOER ARCHITECTS INC in association with LOHAN ANDERSON LLC, ANGUS YOUNG ASSOCIATES INC in association with TREANOR ARCHITECTS, BWZ ARCHITECTS, UIHLEIN WILSON ARCHITECTS INC
Selected AE: UIHLEIN WILSON ARCHITECTS INC

Project No.: 09B1C
Project Name: North Campus Chiller
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $6,348,000
AE Submittal Date: 4/13/2009 2:30:00 PM
Last Item Update: 5/15/2009 8:42:15 AM
AE Submitting Qualifications:

Affiliated Engineers Inc, Arnold & O Sheridan Inc, GRAEF, Grumman Butkus Associates, MEP Associates LLC, Raasch Associates Inc, Ring & DuChateau, LLP;  Syska Hennessy Group Inc,

TCGroup Inc in association with Sebesta Blomberg & Associates Inc

AE Shortlist: RING & DUCHATEAU, LLP; TCGROUP INC in association with SEBESTA BLOMBERG & ASSOCIATES INC, GRUMMAN BUTKUS ASSOCIATES, RAASCH ASSOCIATES INC
Selected AE: RING & DUCHATEAU, LLP

Project No.: 08K3J
Project Name: New Residence Hall
Institution: UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $25,644,000
AE Submittal Date: 3/11/2009 2:30:00 PM
Last Item Update: 4/23/2009 3:58:06 PM
AE Submitting Qualifications:

AECOM Technical Services, Inc. and AECOM Services, Inc. and AECOM USA, Inc.;  Berners-Schober Associates Inc. in association with VOA Associates Incorporated;  Boer Architects, Inc. in association with Lohan Anderson LLC;  Bray Associates Architects, Inc. in association with Hanbury Evans Wright Vlattas + Company;  Continuum Architects & Planners, S.C. in association with Bostwick Design Partnership;  Dorschner|Associates, Inc. in association with Sasaki Associates Inc;  Eppstein Uhen Architects;  Gensler;  KEE Architecture, Inc in association with Treanor Architects;  Potter Lawson Inc in association with Cannon Design;  SDS Architects, Inc; 

Somerville, Inc. in association with Booth Hansen;  The Durrant Group Inc in association with Mackey Mitchell Architects;  Uihlein/Wilson Architects, Inc.;  Zimmerman Architectural Studios, Inc

AE Shortlist: BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED, THE DURRANT GROUP INC in association with MACKEY MITCHELL ARCHITECTS, SOMERVILLE, INC. in association with BOOTH HANSEN, UIHLEIN/WILSON ARCHITECTS, INC.
Selected AE: BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED

Project No.: 07H1H
Project Name: GBY Rose & Wood Hall Remodeling
Institution: UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
Location: CITY OF GREEN BAY, Wisconsin
Construction Cost: $5,183,000
AE Submittal Date: 2/24/2009 2:30:00 PM
Last Item Update: 4/9/2009 3:27:17 PM
AE Submitting Qualifications:

Berners-Schober Associates Inc., Boer Architects, Inc., Continuum Architects & Planners, S.C.,  HGM Architecture Inc, McMAHON, Somerville, Inc., The Durrant Group, Inc.

AE Shortlist: BERNERS-SCHOBER ASSOCIATES INC., McMAHON, SOMERVILLE, INC., THE DURRANT GROUP, INC.
Selected AE: BERNERS-SCHOBER ASSOCIATES INC.

Project No.: 09A2K
Project Name: Capitol Heat and Power Plant Rebuild
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MADISON, Wisconsin
Construction Cost: $15,000,000
AE Submittal Date: 2/23/2009 2:30:00 PM
Last Item Update: 3/10/2009 9:35:15 AM
AE Submitting Qualifications: Black & Veatch Corporation; Hammel, Green and Abrahamson, Inc.; Henneman Engineering, Inc.; Power Egineers Collaborative; Raasch Associates, Inc.; Ring & DuChateau, LLP; TCGroup Inc. in association with Sebasta Blomberg & Associates, Inc
AE Shortlist: HENNEMAN ENGINEERING, INC.; POWER ENGINEERS COLLABORATIVE, LLC; RAASCH ASSOCIATES, INC.; RING & DUCHATEAU, LLP
Selected AE: Henneman Engineering, Inc.

Project No.: 09A2L
Project Name: Charter Street Heating Plant Rebuild
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $200,000,000
AE Submittal Date: 2/23/2009 2:30:00 PM
Last Item Update: 5/6/2009 10:37:59 AM
AE Submitting Qualifications: Black & Veatch Corporation; Jacobs; Luta, Daily & Brain, LLC; Power Engineers Collaborative, LLC in association with Poyry (Appleton), LLC; Sargent & Lundy; Stanley Consultants, Inc.; TC Group, Inc. in association with Sebesta Blomberg & Associates, Inc.
AE Shortlist: JACOBS; LUTZ, DAILY & BRAIN, LLC; POWER ENGINEERS COLLABORATIVE, LLC in association with POYRY (APPLETON), LLC; SARGENT & LUNDY
Selected AE: Power Engineers Collaborative, LLC in association with Poyry (Appleton), LLC

Project No.: 08I3G
Project Name: WSHP Chiller No. 1 Repl
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $6,920,000
AE Submittal Date: 12/15/2008 2:30:00 PM
Last Item Update: 2/12/2009 4:47:50 PM
AE Submitting Qualifications:

Affiliated Engineers Inc, Graef, Anhalt, Schloemer & Associates, Inc.;  Henneman Engineering, Ring & DuChateau Inc, Syska Hennessy Group; The Durrant Group, Inc.

AE Shortlist: SYSKA HENNESSY GROUP, HENNEMAN ENGINEERING, RING & DUCHATEAU INC, AFFILIATED ENGINEERS INC
Selected AE: Affiliated Engineers Inc

Project No.: 08A2B
Project Name: Stout, Harvey Hall Theater Renovation
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: CITY OF MENOMONIE, Wisconsin
Construction Cost: $3,680,000
AE Submittal Date: 11/5/2008 2:30:00 PM
Last Item Update: 12/10/2008 12:55:33 PM
AE Submitting Qualifications:

Engberg Anderson, Inc.: Isthmus Architecture, Inc.; Lien and Peterson Architects in association with Hammel, Green and Abrahamson, Inc.; MartinRiley Architects Engineers in association with Sandberg Architecture & Design; Potter Lawson Inc, SDS Architects, Inc; Strang Inc in association with Miller Dunwiddie Architecture, Inc.

AE Shortlist: ISTHMUS ARCHITECTURE, INC, SDS ARCHITECTS, INC.; STRANG INC in association with MILLER DUNWIDDIE ARCHITECTURE, INC.; ENGBERG ANDERSON, INC.
Selected AE: STRANG INC in association with MILLER DUNWIDDIE ARCHITECTURE, INC.

Project No.: 08F2E
Project Name: Charter St HP BACT Compliance
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $0
AE Submittal Date: 9/5/2008 2:30:00 PM
Last Item Update: 9/12/2008 1:25:30 PM
Selected AE: The Titus Group Inc., Milwaukee,Wi

Project No.: 07E2D
Project Name: UWEC, University Student Center
Institution: UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
Location: CITY OF EAU CLAIRE, Wisconsin
Construction Cost: $38,182,000
AE Submittal Date: 6/24/2008 2:30:00 PM
Last Item Update: 9/4/2008 2:43:31 PM
AE Submitting Qualifications:

Ayres Associates Inc in association with Holzman Moss Architecture;  Bray Associates Architects, Inc.  in association with Burt Hill;  Horty Elving and Associates Inc;  KEE Architecture, Inc        in association with Ellerbe Becket;  River Architects, Inc. in association with SmithGroup;  SDS Architects, Inc in association with Perkins & Will;  Strang Inc in association with MHTN Architecture Inc.;  Uihlein/Wilson Architects, Inc. in association with RDG Planning & Design; 

Workshop Architects, Inc.

AE Shortlist: Bray Associates Architects, Inc. in association with Burt Hill; Ayres Associates Inc in association with Holzman Moss Architecture; KEE Architecture, Inc in association with Ellerbe Becket; SDS Architects, Inc in association with Perkins & Will
Selected AE: Bray Associates Architects, Inc. in association with Burt Hill

Project No.: 07L2P
Project Name: GEF 3 Renovation, 4th Flr HVAC & ADA
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MADISON, Wisconsin
Construction Cost: $3,059,700
AE Submittal Date: 6/9/2008 2:30:00 PM
Last Item Update: 9/4/2008 2:39:44 PM
AE Submitting Qualifications: Assemblage Architects, Boer Architects, Inc., Bray Associate Architects, Inc., Mattes Architects & Designers LLC, Strang Inc
AE Shortlist: Assemblage Architects, Boer Architects, Inc., Bray Associate Architects, Inc., Mattes Architects & Designers LLC
Selected AE: Boer Architects, Inc.

Project No.: 08B3M
Project Name: UWL Residence Hall - Eagle Hall
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $37,281,000
AE Submittal Date: 6/3/2008 2:30:00 PM
Last Item Update: 9/4/2008 2:41:22 PM
AE Submitting Qualifications:

Eppstein Uhen Architects, HSR Associates, Inc, Plunkett Raysich Architects in association with Vantage Architects Inc, River Architects, Inc. in association with VOA Associates Incorporated, Uihlein/Wilson Architects, Inc. in association with Booth Hansen            

AE Shortlist: HSR ASSOCIATES, INC.; UIHLEIN/WILSON ARCHITECTS, INC. in association with BOOTH HANSEN; RIVER ARCHITECTS, INC. in association with VOA ASSOCIATES, INCORPORATED; EPPSTEIN UHEN ARCHITECTS
Selected AE: EPPSTEIN UHEN ARCHITECTS

Project No.: 07K2R
Project Name: New Residence Hall
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $19,444,000
AE Submittal Date: 4/21/2008
Last Item Update: 5/29/2008 8:45:08 AM
AE Submitting Qualifications: Bray Associates Architects, Inc. in association with Cannon Design; Continuum Architects + Planners, S.C. in association with Bostwick Design Partnership; Engberg Anderson, Inc. in association with Mackey Mitchell Architects, P.C.; Eppstein Uhen Architects, Inc.; Mayer Helminiak Architects, LLC; Mudrovich Architects in association with DMJM H&N, Inc.; Revelations Architects/Builders in association with KSQ Architects, PC; SDS Architects, Inc.; Somerville, Inc. in association with VOA Associates Incorporated
AE Shortlist: SOMERVILLE, INC. in association with VOA ASSOCIATES INCORPORATED, BRAY ASSOCIATES ARCHITECTS, INC. in association with CANNON DESIGN, ENGBERG ANDERSON, INC. in association with MACKEY MITCHELL ARCHITECTS, EPPSTEIN UHEN ARCHITECTS, INC.
Selected AE: ENGBERG ANDERSON, INC. in association with MACKEY MITCHELL ARCHITECTS

Project No.: 08B4a
Project Name: Constr Mgr for Union South
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $66,770,000
AE Submittal Date: 4/16/2008
Last Item Update: 5/20/2008 4:24:05 PM
AE Shortlist: Short listed CMAR: CG Schmidt Construction Co, Gilbane Bldg Co jv with Tri North Co, J.H. Findorff jv with Mortenson, Oscar Boldt Co
Selected AE: Selected CMAR CG Schmidt, Milwaukee & Madison, Wisconsin

Project No.: 06K2Q
Project Name: Elmwood Rmdl & Addn/Student Success Ctr
Institution: UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $6,219,000
AE Submittal Date: 4/3/2008
Last Item Update: 6/3/2008 12:44:35 PM
AE Submitting Qualifications: KEE Architecture, Durrant, Mattes Architects & Designers, LLC, Boer Architects, Inc. in association with Wydeven arhcitects, LLC, Continuum Architects + Planners, S.C., HGM Architecture, Inc., Plunkett Raysich Architects, LLP, Miller Wagner Coenen/McMahon, Inc., Mead & Hunt, Inc.
AE Shortlist: THE DURRANT GROUP, INC., KEE ARCHITECTURE, INC., MEAD & HUNT, INC., MILLER WAGNER COENEN/MCMAHON, INC.
Selected AE: KEE ARCHITECTURE, INC.

Project No.: 07G3L
Project Name: Female Treatment Facility
Institution: HEALTH SERVICES/WISCONSIN RESOURCE CENTER, WINNEBAGO
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $8,544,100
AE Submittal Date: 2/6/2008
Last Item Update: 3/24/2008 1:15:40 PM
AE Submitting Qualifications:

Kehoe-Henry and Associates, Inc.;  Quantic Architecture LLC in association with Mead & Hunt Inc, Somerville, Inc.;  The Durrant Group Inc, Venture Architects

AE Shortlist: SOMERVILLE, INC., THE DURRANT GROUP INC, QUANTIC ARCHITECTURE LLC in association with MEAD & HUNT INC, VENTURE ARCHITECTS
Selected AE: The Durrant Group, Madison, WI

Project No.: 07G1X
Project Name: RCI Food Production Facility
Institution: CORRECTIONS/RACINE CORRECTIONAL INSTITUTION, STURTEVANT
Location: VILLAGE OF STURTEVANT, Wisconsin
Construction Cost: $4,391,000
AE Submittal Date: 1/29/2008
Last Item Update: 3/5/2008 2:39:37 PM
AE Submitting Qualifications: Architects Group Limited, Bray Associates Architects, Inc.; Kehoe-Henry and Associates, Inc., Mead & Hunt Inc, The Durrant Group Inc, Venture Architects
AE Shortlist: MEAD & HUNT INC, THE DURRANT GROUP INC, VENTURE ARCHITECTS, ARCHITECTS GROUP LIMITED
Selected AE: Venture Architects

Project No.: 07G2U
Project Name: UWMIL Campus Master Plan
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $0
AE Submittal Date: 1/10/2008
Last Item Update: 2/22/2008 2:01:13 PM
AE Submitting Qualifications:

Engberg Anderson , Inc in association with Solomon Cordwell Buenz;  Hammel, Green and Abrahamson, Inc. in association with Sasaki Associates Inc;  HDR Architecture Inc in association with Loebl Schlossman & Hackl;  JJR, LLC in association with Goody Clancy;  Uihlein/Wilson Architects, Inc. in association with Booth Hansen and in association with Hargreaves Associates            

AE Shortlist: Updated 02/13/08: HDR ARCHITECTURE in association with LOEBL SCHLOSSMAN & HACKL, HAMMEL, GREEN AND ABRAHAMSON, INC in association with SASAKI ASSOCIATES, INC, JJR, LLC in association with GOODY CLANCY, ENGBERG ANDERSON, INC in association with SOLOMON CORDWELL BUENZ
Selected AE: HAMMEL, GREEN and ABRAHAMSON, INC. in association with SASAKI ASSOCIATES INC

Project No.: 07E4J
Project Name: Wisconsin Union Redevelopment
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $67,520,000
AE Submittal Date: 10/24/2007
Last Item Update: 2/22/2008 3:21:40 PM
AE Submitting Qualifications:

Bray Associates Architects, Inc. in association with Cannon Design, Eppstein Uhen Architects in association with Ayers/Saint/Gross, Kahler Slater Architects with association with WTW Architects, KEE Architecture, Inc in association with Perkins & Will, Plunkett Raysich Architects in association with Holzman Moss Architecture, Strang Inc in association with MHTN Architecture Inc., The Durrant Group, Inc. in association with SmithGroup, Toki & Associates, Inc. in association with Kevin Hom + Andrew Goldman Architects PC, Workshop Architects, Inc. in association with Moody Nolan, Inc.

AE Shortlist: KAHLER SLATER ARCHITECTS in association with WTW ARCHITECTS, EPPSTEIN UHEN ARCHITECTS in association with AYERS/SAINT/GROSS, PLUNKETT RAYSICH ARCHITECTS in association with HOLZMAN MOSS ARCHITECTURE, WORKSHOP ARCHITECTS, INC. in association with MOODY NOLAN, INC.
Selected AE: WORKSHOP ARCHITECTS, INC. in association with MOODY NOLAN, INC.

Project No.: 07C1N
Project Name: UW MSN Chad/Barnard Renovation PH II
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $9,520,000
AE Submittal Date: 8/21/2007
Last Item Update: 9/26/2007 12:58:30 PM
AE Submitting Qualifications:

Assemblage Architects, BWZ Architects, HSR Associates, Inc;  KEE Architecture, Inc;  Uihlein/Wilson Architects, Inc.;  William Wenzler & Associates - Architects Inc

AE Shortlist: WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC., BWZ ARCHITECTS, UIHLEIN/WILSON ARCHITECTS, INC., KEE ARCHITECTURE, INC
Selected AE: BWZ ARCHITECTS

Project No.: 06L2I
Project Name: Randall - Dayton Utility Improvements
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $4,061,000
AE Submittal Date: 6/26/2007
Last Item Update: 8/15/2007 4:11:23 PM
AE Submitting Qualifications:

Affiliated Engineers Inc, Henneman Engineering, Knight E/A, Inc. Lang Associates, a Division of Clark Dietz, Inc. with Clark Dietz, Inc., Realtime Utility Engineers, Inc., an InfraSource Services Co, Strand Associates, Inc.

AE Shortlist: LANG ASSOCIATES, a Division of Clark Dietz, Inc. with CLARK DIETZ, INC., HENNEMAN ENGINEERING, KNIGHT E/A, INC., STRAND ASSOCIATES, INC
Selected AE: HENNEMAN ENGINEERING

Project No.: 07B2F
Project Name: Stout, Hovlid Hall Renovation & Addn
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: CITY OF MENOMONIE, Wisconsin
Construction Cost: $6,800,000
AE Submittal Date: 6/11/2007
Last Item Update: 8/24/2007 9:24:48 AM
AE Submitting Qualifications:

Architects Group Limited, Architectural Design Group, Inc. in association with Mackey Mitchell Architects, Brownhouse, HSR Associates, Inc, Miller Wagner Coenen/McMahon, Inc., SDS Architects, Inc, Short Elliott Hendrickson Inc

AE Shortlist: ARCHITECTURAL DESIGN GROUP, INC. in association with MACKEY MITCHELL ARCHITECTS, SDS ARCHITECTS, INC, MILLER WAGNER COENEN/McMAHON, INC., HSR ASSOCIATES, INC
Selected AE: SDS ARCHITECTS, INC

Project No.: 06E1B
Project Name: Armed Forces Reserve Center
Institution: MILITARY AFFAIRS/MADISON
Location: CITY OF MADISON, Wisconsin
Construction Cost: $29,289,700
AE Submittal Date: 5/30/2007
Last Item Update: 7/13/2007 9:53:08 AM
AE Submitting Qualifications:

Assemblage Architects, HSR Associates, Inc, Kapur & Associates Inc in association with VOA Associates Incorporated, Mead & Hunt Inc in association with GRW Engineers Inc, Potter Lawson Inc

AE Shortlist: POTTER LAWSON INC, ASSEMBLAGE ARCHITECTS, MEAD & HUNT INC in association with GRW ENGINEERS INC, HSR ASSOCIATES, INC
Selected AE: HSR ASSOCIATES, INC

Project No.: 06K2Z
Project Name: UWMAD SoHE Addition & Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $35,255,000
AE Submittal Date: 5/16/2007
Last Item Update: 6/25/2007 9:41:06 AM
AE Submitting Qualifications:

BWZ Architects in association with Holabird & Root LLC, Dorschner|Associates, Inc. in association with Sasaki Associates Inc, Engberg Anderson Design Partnership, Inc in association with VOA Associates Incorporated, Eppstein Uhen Architects, HSR Associates, Inc in association with Ross Barney Architects

AE Shortlist: BWZ ARCHITECTS in association with HOLABIRD & ROOT LLC, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC in association with VOA ASSOCIATES INCORPORATED, EPPSTEIN UHEN ARCHITECTS, DORSCHNER|ASSOCIATES, INC. in association with SASAKI ASSOCIATES INC
Selected AE: Dorschner|Associates, Inc in association with Sasaki Associates Inc

Project No.: 06B2C
Project Name: Arlington Integr Dairy - Phase II
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: TOWN OF LEEDS, Wisconsin
Construction Cost:  
AE Submittal Date: 4/30/2007
Last Item Update: 6/11/2007 9:52:33 AM
AE Submitting Qualifications:

Following firms to be interviewed on May 25, 2007             9:00 AM Keller Builders Inc. Kaukauna, WI                10:30 AM, DairyBuilding Contractors, Oneida, WI               1:00 PM Bauman Construction Inc., Chippewa Falls, WI      2:30 PM, Brickl Bros. Inc, West Salem, WI                     ( order of interviews in random order)

Selected AE: DairyBuilding Contractors, Oneida, WI

Project No.: 06K2R
Project Name: Lakeshore Res Hall & Food Service Fac
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $36,498,000
AE Submittal Date: 4/25/2007
Last Item Update: 6/12/2007 5:08:35 PM
AE Submitting Qualifications:

Dorschner|Associates, Inc. in association with Goody Clancy, Engberg Anderson Design Partnership, Inc in association with Mackey Mitchell Architects, Eppstein Uhen Architects, Mayer Helminiak Architects LLC (Formerly BHS) in association with VOA Associates Incorporated, Uihlein/Wilson Architects, Inc. in association with Booth Hansen, William Wenzler & Associates - Architects Inc, Zimmerman Architectural Studios, Inc

AE Shortlist: EPPSTEIN UHEN ARCHITECTS, DORSCHNER|ASSOCIATES, INC in association with GOODY CLANCY, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC in association with MACKEY MITCHELL ARCHITECTS, WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC
Selected AE: ENGBERG ANDERSON DESIGN PARTNERSHIP, INC. in association with MACKEY MITCHELL ARCHITECTS

Project No.: 05I2O
Project Name: Communication Arts Renv & Addn
Institution: UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
Location: TOWN OF SOMERS, Wisconsin
Construction Cost: $27,132,000
AE Submittal Date: 4/19/2007
Last Item Update: 6/6/2007 4:51:38 PM
AE Submitting Qualifications: BWZ Architects in association with Holabird & Root LLC, Dorschner|Associates, Inc. in association with Harley Ellis Devereaux, Engberg Anderson Design Partnership, Inc in association with Holzman Moss Architecture, Flad & Associates, Hammel, Green and Abrahamson, Inc
AE Shortlist: ENGBERG ANDERSON DESIGN PARTNERSHIP, INC in association with HOLZMAN MOSS ARCHITECTURE, HAMMEL, GREEN AND ABRAHAMSON, INC., DORSCHNER|ASSOCIATES, INC. in association with HARLEY ELLIS DEVEREAUX
Selected AE: Hammel, Green and Abrahamson, Inc.

Project No.: 06K1G
Project Name: Suite Style Residence Hall
Institution: UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
Location: TOWN OF SOMERS, Wisconsin
Construction Cost: $22,076,000
AE Submittal Date: 2/6/2007
Last Item Update: 4/4/2007 5:01:50 PM
AE Submitting Qualifications:

Continuum Architects & Planners, S.C. in association with Bostwick Design Partners, Dorschner|Associates, Inc. in association with Einhorn Yaffee Prescott, Engberg Anderson Design Partnership, Inc. in association with Solomon Cordwell Buenz, Eppstein Uhen Architects,

Excel Engineering, Inc. in association with OPN Architects Inc, KEE Architecture, Inc in association with Mackey Mitchell Architects, Plunkett Raysich Architects, Renner Architects, William Wenzler & Associates - Architects Inc

AE Shortlist: Kee Architecture, Engberg Anderson Design Partnership, Eppstein Uhen Architects, William Wenzler & Associates
Selected AE: Eppstein Uhen Architects

Project No.: 05I2Y
Project Name: Swenson Hall
Institution: UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
Location: CITY OF SUPERIOR, Wisconsin
Construction Cost: $25,865,000
AE Submittal Date: 1/30/2007
Last Item Update: 3/20/2007 9:52:59 AM
AE Submitting Qualifications:

Ayres Associates Inc in association with Harley Ellis Devereaux, Dorschner|Associates, Inc. in  association with Einhorn Yaffee Prescott, Excel Engineering, Inc. in association with RDG Pnning & Design, Hammond Beeby Rupert Ainge Inc, HSR Associates, Inc in association with Ross Barney Architects, Kahler Slater Architects, Miller Wagner Coenen/McMahon, Inc. in association with Somerville, Inc., Potter Lawson Inc, SDS Architects, Inc in association with Perkins & Will,  Strang Inc in association with SmithGroup, Toki & Associates, Inc. in association with Gensler

AE Shortlist: Strang Inc in association with SmithGroup, Potter Lawson Inc, Ayres Associates Inc in association with Harley Ellis Devereaux, HSR Associates, Inc in association with Ross Barney Architects
Selected AE: Potter Lawson Inc

Project No.: 06C1Q
Project Name: UW WW New Residence Hall
Institution: UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
Location: CITY OF WHITEWATER, Wisconsin
Construction Cost: $28,251,000
AE Submittal Date: 1/22/2007
Last Item Update: 3/16/2007 11:37:36 AM
AE Submitting Qualifications:

Continuum Architects & Planners, S.C. in association with Bostwick Design Partners, Dorschner|Associates, Inc. in association with Einhorn Yaffee Prescott, Engberg Anderson Design Partnership, Inc. in association with Solomon Cordwell Buenz, Eppstein Uhen Architects,  KEE Architecture, Inc in association with Mackey Mitchell Architects,  Plunkett Raysich Architects, Potter Lawson Inc in association with Cannon Design, Renner Architects, Uihlein/Wilson Architects, Inc.

AE Shortlist: UIHLEIN/WILSON ARCHITECTS, INC., POTTER LAWSON INC in association with CANNON DESIGN, EPPSTEIN UHEN ARCHITECTS, CONTINUUM ARCHITECTS & PLANNERS, S.C
Selected AE: POTTER LAWSON INC in association with CANNON DESIGN

Project No.: 06J2N
Project Name: WID-MIR Constr Mgr at Risk
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $120,000,000
AE Submittal Date: 11/16/2006
Last Item Update: 1/19/2007 12:46:36 PM
AE Shortlist: Short listed CMAR's : CD Smith, Fond du Lac, WI, Findorf-Mortenson Joint Venture, Madison, WI, Gilbane Bldg Co, Milwaukee, WI, Oscar Boldt Co, Madison, WI
Selected AE: 1- (Selected) Findorff - Mortenson; 2nd- Oscar Boldt Co; 3rd-CD Smith Co; 4th- Gilbane Co

Project No.: 05I3N
Project Name: New Academic Building/Sage Hall
Institution: UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $36,239,000
AE Submittal Date: 11/8/2006
Last Item Update: 12/19/2006 4:10:15 PM
AE Submitting Qualifications:

Ayres Associates Inc in association with SmithGroup, Barrientos Design & Consulting, LLC in association with Goody Clancy, Berners-Schober Associates Inc. in association with VOA Associates Incorporated, Bray Associates Architects, Inc. in association with Perkins & Will,

Continuum Architects & Planners, S.C. in association with Ross Barney Architects, Eppstein Uhen Architects, Excel Engineering, Inc. in association with RDG Planning & Design, Plunkett Raysich Architects in association with Shepley Bulfinch Richardson and Abbott, Potter Lawson Inc, Somerville, Inc., Toki & Associates, Inc. in association with Gensler

AE Shortlist: BARRIENTOS DESIGN & CONSULTING, LLC in association with GOODY CLANCY, POTTER LAWSON INC, BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED, BRAY ASSOCIATES ARCHITECTS, INC. in association with PERKINS & WILL
Selected AE: BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED

Project No.: 05I2Q
Project Name: Stout, Jarvis Hall Renovation & Addition
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: CITY OF MENOMONIE, Wisconsin
Construction Cost: $26,571,000
AE Submittal Date: 10/10/2006
Last Item Update: 11/20/2006 2:29:04 PM
AE Submitting Qualifications:

Ayres Associates Inc in association with SmithGroup, Berners-Schober Associates Inc., Continuum Architects & Planners, S.C. in association with Loebl Schlossman & Hackl, Dorschner|Associates, Inc. in association with Holabird & Root, Hammel, Green and Abrahamson, Inc., Plunkett Raysich Architects, Potter Lawson Inc, SDS Architects, Inc in association with BWBR Architects, Inc., The Durrant Group Inc

AE Shortlist: SDS Architects, Inc in association with BWBR Architects, Inc., Berners-Schober Associates Inc, Potter Lawson Inc, Continuum Architects & Planners, S.C. in association with Loebl Schlossman & Hackl
Selected AE: SDS Architects, Inc in association with BWBR Architects, Inc.,

Project No.: 06D2P
Project Name: UW MSN Education Bldg Renov & Addition
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $22,864,000
AE Submittal Date: 10/2/2006
Last Item Update: 11/14/2006 3:34:00 PM
AE Submitting Qualifications:

Dorschner|Associates, Inc. in association with Miller Dunwiddie Architecture, Eppstein Uhen Architects, Hammel, Green and Abrahamson, Inc.;  KEE Architecture, Inc, Renner Architects, The Kubala Washatko Architects Inc. in association with HOK Chicago

AE Shortlist: HAMMEL, GREEN AND ABRAHAMSON, INC., EPPSTEIN UHEN ARCHITECTS, THE KUBALA WASHATKO ARCHITECTS INC. in association with HOK CHICAGO, DORSCHNER|ASSOCIATES, INC. in association with MILLER DUNWIDDIE ARCHITECTURE
Selected AE: HAMMEL, GREEN AND ABRAHAMSON, INC.

Project No.: 06F1Z
Project Name: Chazen Museum of Art Addition
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $29,989,000
AE Submittal Date: 9/26/2006
Last Item Update: 11/13/2006 4:33:02 PM
AE Submitting Qualifications:

Berners-Schober Associates Inc. in association with Gwathmey Siegel & Associates Architects, Continuum Architects & Planners, S.C. in association with Machado & Silvetti Associates Inc, Dorschner|Associates, Inc. in association with Bernard Tschumi Architects, Engberg Anderson Design Partnership, Inc in association with Schwartz Silver Architects Inc, Hammel, Green and Abrahamson, Inc., Hammond Beeby Rupert Ainge Inc, La Dallman Architects Inc in association with The Rose Guggenheimer Studio, Potter Lawson Inc in association with E Verner Johnson & Associates Museum Architects & Planners, The Durrant Group Inc in association with Frederick Fisher & Partners Architects, The Kubala Washatko Architects Inc. in association with VJAA

AE Shortlist: DALLMAN ARCHITECTS INC in association with THE ROSE GUGGENHEIMER STUDIO, DORSCHNER|ASSOCIATES, INC. in association with BERNARD TSCHUMI ARCHITECTS, BERNERS-SCHOBER ASSOCIATES INC. in association with GWATHMEY SIEGEL & ASSOCIATES, CONTINUUM ARCHITECTS & PLANNERS, S.C. in association with MACHADO & SILVETTI ASSOCIATES INC
Selected AE: Continuum Architects & Planners, S.C. in association with Machado & Silvetti Associates Inc

Project No.: 06D2R
Project Name: New Stadium & Fields Complex
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $11,973,000
AE Submittal Date: 9/14/2006
Last Item Update: 10/30/2006 3:01:51 PM
AE Submitting Qualifications:

Berners-Schober Associates Inc., Hammel, Green and Abrahamson, Inc. in association with Donald Eyberg Architects, HSR Associates, Inc in association with RDG Planning & Design, SDS Architects, Inc in association with Ellerbe Becket

AE Shortlist: SDS ARCHITECTS, INC in association with ELLERBE BECKET, HSR ASSOCIATES, INC in association with RDG PLANNING & DESIGN, BERNERS-SCHOBER ASSOCIATES INC., HAMMEL, GREEN AND ABRAHAMSON, INC. in association with DONALD EYBERG ARCHITECTS
Selected AE: HSR ASSOCIATES, INC in association with RDG PLANNING & DESIGN

Project No.: 06A1M
Project Name: UW MSN East Campus Utility Improvement
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $16,300,000
AE Submittal Date: 8/8/2006
Last Item Update: 9/25/2006 1:30:17 PM
AE Submitting Qualifications:

Affiliated Engineers, Inc., Henneman Engineering, Strand Associates, Inc. in association with Ring & DuChateau Inc

AE Shortlist: Strand Associates, Inc. in association with Ring & DuChateau Inc, Henneman Engineering, Affiliated Engineers, Inc.
Selected AE: Affiliated Engineers, Inc.

Project No.: 05L1W
Project Name: Jim Dan Hill Library Renov
Institution: UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
Location: CITY OF SUPERIOR, Wisconsin
Construction Cost: $5,917,000
AE Submittal Date: 7/31/2006
Last Item Update: 9/11/2006 3:08:22 PM
AE Submitting Qualifications:

 Ayres Associates Inc in association with Ross Barney+Jankowski Inc, Engberg Anderson Design Partnership, Inc, River Architects, Inc., SDS Architects, Inc, The Durrant Group, Inc.

AE Shortlist: Engberg Anderson Design Partnership, Inc, River Architects, Inc., SDS Architects, Inc, The Durrant Group, Inc.
Selected AE: River Architects, Inc.

Project No.: 06B1R
Project Name: Warehouse Rem Arts Relocation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $7,142,000
AE Submittal Date: 7/25/2006
Last Item Update: 8/31/2006 2:22:21 PM
AE Submitting Qualifications:

ANGUS YOUNG ASSOCIATES INC in association with OWP/P, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC, HAMMEL, GREEN AND ABRHAMSON, INC

AE Shortlist: ANGUS YOUNG ASSOCIATES INC in association with OWP/P, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC, HAMMEL, GREEN AND ABRHAMSON, INC
Selected AE: HAMMEL, GREEN AND ABRHAMSON, INC

Project No.: 05L1D
Project Name: Rothwell Stu Cntr Replacement
Institution: UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
Location: CITY OF SUPERIOR, Wisconsin
Construction Cost: $16,575,000
AE Submittal Date: 7/19/2006
Last Item Update: 9/1/2006 10:35:07 AM
AE Submitting Qualifications:

Ayres Associates Inc in association with Design Partnership of Cambridge, Dorschner|Associates, Inc., Engberg Anderson Design Partnership, Inc in association with Ellerbe Becket, KEE Architecture, Inc, SDS Architects, Inc in association with Perkins & Will, Workshop Architects, Inc.

AE Shortlist: Ayres Associates Inc in association with Design Partnership of Cambridge, Engberg Anderson Design Partnership, Inc in association with Ellerbe Becket, SDS Architects, Inc in association with Perkins & Will, Workshop Architects, Inc.
Selected AE: Workshop Architects, Inc.

Project No.: 06D1T
Project Name: WI Instit for Discovery
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $120,000,000
AE Submittal Date: 7/18/2006
Last Item Update: 9/20/2006 1:09:55 PM
AE Submitting Qualifications:

 

Firms nine showing interest in alphabetical order:  Eppstein Uhen Arch, Madison & Milw, in association with in association with Perkins + Will, San Francisco & Los Angeles; Flad and Assoc. Madison; HGA Inc Milw & Minneapolis, MN, in association  with Foster & Partners, London, England; Kahler Slater Arch Milw, in association with Tsoi/Kobus assoc. Cambridge, MA;  Plunket Raysich Arch, Milw, in association with CO Architect, Los Angeles, CA; Skidmore Owins and Merrill, Chicago, IL in association with Engberg Anderson Design, Milw; Smith Group San Francisco CO in association with Ayres Associates, Eau Claire; Uihlein Wilson Arch. Milw, in association with Ballinger, Philadelphia, PA; The Zimmerman Design Group, Milw, in association with HOK Chicago ILL and HOK Atlanta

AE Shortlist: Uihlein Wilson Arch., Milw, WI, in association with Ballinger, Philadelphia, PA; Eppstein Uhen Arch. , Madison & Mil in association with Perkins + Will, San Francisco & Los Angeles CA; HGA Inc Milw WI & Minneapolis, Min in association with Foster & Partners, London , England; PRA Arch. Milwaukee, WI in association with CO Architect Los Angeles, CA
Selected AE: Rank: 1-Uihlein Wilson - Ballinger, 2-PRA-CO Architects, 3-HGA-Foster, 4-Eppstein Uhen -Perkins Will

Project No.: 06B3C
Project Name: DHFS SRSTC Expansion
Institution: HEALTH SERVICES/SECURE TREATMENT FACILITY, MAUSTON
Location: CITY OF MAUSTON, Wisconsin
Construction Cost: $24,100,000
AE Submittal Date: 7/13/2006
Last Item Update: 8/22/2006 8:44:19 AM
AE Submitting Qualifications:

Ayres Associates Inc in association with BWBR Architects, Inc., Mead & Hunt Inc in association with Quantic Architecture LLC, Potter Lawson Inc, Venture Architects

AE Shortlist: Ayres Associates Inc in association with BWBR Architects, Inc., Mead & Hunt Inc in association with Quantic Architecture LLC, Potter Lawson Inc, Venture Architects
Selected AE: Venture Architects

Project No.: 05D1Y
Project Name: Eau Claire, McPhee Renovation
Institution: UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
Location: CITY OF EAU CLAIRE, Wisconsin
Construction Cost: $5,215,000
AE Submittal Date: 7/11/2006
Last Item Update: 8/22/2006 11:15:54 AM
AE Submitting Qualifications:

APEX Engineering, Berners-Schober Associates Inc., Dorschner|Associates, Inc., Henneman Engineering, SDS Architects, Inc

AE Shortlist: Berners-Schober Associates Inc., Dorschner|Associates, Inc., Henneman Engineering, SDS Architects, Inc
Selected AE: SDS Architects, Inc

Project No.: 05I2F
Project Name: Fine Arts HVAC Sys Repl
Institution: UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
Location: CITY OF RIVER FALLS, Wisconsin
Construction Cost: $4,177,600
AE Submittal Date: 6/13/2006
Last Item Update: 8/1/2006 8:54:50 AM
AE Submitting Qualifications:

Grumman Butkus Associates, Henneman Engineering, Lang Associates, Inc in association with Clark Dietz, Inc, Power Engineers Collaborative LLC

AE Shortlist: LANG ASSOCIATES, INC. in association with CLARK DIETZ, INC, POWER ENGINEERS COLLABORATIVE LLC, GRUMMAN BUTKUS ASSOCIATES
Selected AE: GRUMMAN BUTKUS ASSOCIATES

Project No.: 05I3O
Project Name: UWL New Academic Build.
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $23,560,000
AE Submittal Date: 4/20/2006
Last Item Update: 7/13/2006 3:32:43 PM
AE Submitting Qualifications:

Ayres Associates Inc in joint venture with SJA Architects, Eppstein Uhen Architects, Flad & Associates, Gensler, Hammel, Green and Abrahamson, Inc., HSR Associates, Inc, Potter Lawson Inc, River Architects, Inc., SDS Architects, Inc, Somerville, Inc.

AE Shortlist: FLAD & ASSOCIATES, RIVER ARCHITECTS, INC, HAMMEL, GREEN AND ABRAHAMSON, INC, POTTER LAWSON INC
Selected AE: RIVER ARCHITECTS, INC

Project No.: 05I2H
Project Name: UW MSN West Campus Utility Improvement
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $18,700,000
AE Submittal Date: 3/23/2006
Last Item Update: 5/9/2006 11:38:53 AM
AE Shortlist: HENNEMAN ENGINEERING, RING & DUCHATEAU INC, SHORT ELLIOTT HENDRICKSON INC in association with POWER ENGINEERS COLLABORATIVE LLC, AFFILIATED ENGINEERS INC
Selected AE: RING & DUCHATEAU INC.

Project No.: 05F1K
Project Name: Biochemistry II, Henry Mall
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $70,157,000
AE Submittal Date: 3/8/2006
Last Item Update: 5/9/2006 11:41:24 AM
AE Shortlist: HAMMEL, GREEN AND ABRAHAMSON, INC. in association with TSOI/KOBUS & ASSOCIATES, INC., PLUNKETT RAYSICH ARCHITECTS in association with SHEPLEY BULFINCH RICHARDSON AND ABBOTT, UIHLEIN/WILSON ARCHITECTS, INC. in association with BALLINGER, FLAD & ASSOCIATES
Selected AE: FLAD & ASSOCIATES

Project No.: 05G2W
Project Name: SWVMC - Columbarium Dev Phase III
Institution: VETERANS AFFAIRS/SOUTHERN WI VETERANS MEMORIAL CEMETERY-UNION GROVE
Location: VILLAGE OF UNION GROVE, Wisconsin
Construction Cost: $4,544,700
AE Submittal Date: 2/28/2006
Last Item Update: 5/9/2006 11:41:42 AM
AE Shortlist: TRIBUTE DESIGN SYSTEMS LLC in joint venture with RAMAKER & ASSOCIATES INC, STRAND ASSOCIATES, INC. in association with THE LA GROUP LANDSCAPE ARCHITECTURE & Engineering P C
Selected AE: TRIBUTE DESIGN SYSTEMS LLC in joint venture with RAMAKER & ASSOCIATES INC

Project No.: 05G1L
Project Name: New Drug Abuse Treatment Facility
Institution: CORRECTIONS/DRUG ABUSE CORRECTIONAL CENTER, WINNEBAGO
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $11,400,000
AE Submittal Date: 2/20/2006
Last Item Update: 3/31/2006 12:25:12 PM
AE Shortlist: SEAN BUJOLD & ASSOCIATES, INC., in joint venture with HORTY ELVING AND ASSOCIATES INC., VENTURE ARCHITECTS, KEHOE-HENRY AND ASSOCIATES, INC.
Selected AE: KEHOE-HENRY AND ASSOCIATES, INC.

Project No.: 05G1J
Project Name: DOC OCI Food Service Facility
Institution: CORRECTIONS/OAKHILL CORRECTIONAL INSTITUTION, OREGON
Location: TOWN OF OREGON, Wisconsin
Construction Cost: $3,800,000
AE Submittal Date: 12/13/2005
Last Item Update: 2/9/2006 3:48:26 PM
AE Shortlist: ARCHITECTS GROUP LIMITED, BRAY ASSOCIATES ARCHITECTS, INC., KEHOE-HENRY AND ASSOCIATES, INC., PERFORMA, INC.
Selected AE: ARCHITECTS GROUP LIMITED

Project No.: 04J1T
Project Name: UW MSN Univ Ridge Golf Course Expans
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $4,088,000
AE Submittal Date: 12/7/2005
Last Item Update: 2/8/2006 3:05:49 PM
AE Shortlist: MELCHERT WALKKY INC., TOKI & ASSOCIATES, INC. in association with JACOBSON GOLF COURSE DESIGN INC., MSA PROFESSIONAL SERVICES, INC. in association with CLYDE JOHNSTON DESIGNS INC., JJR, LLC in association with ROBERT TRENT JONES II LLC
Selected AE: JJR, LLC in association with ROBERT TRENT JONES II LLC

Project No.: 05E1Z
Project Name: Sterling Hall Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $29,345,600
AE Submittal Date: 11/15/2005
Last Item Update: 1/11/2006 3:05:00 PM
AE Shortlist: HAMMEL, GREEN AND ABRAHAMSON, INC., UIHLEIN/WILSON ARCHITECTS, INC. in association with BALLINGER, STRANG, INC., BERNERS-SCHOBER ASSOCIATES, INC.
Selected AE: STRANG, INC.

Project No.: 05D2N
Project Name: GEF 2 - Phase 2 Renovation
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MADISON, Wisconsin
Construction Cost: $3,862,500
AE Submittal Date: 10/20/2005
Last Item Update: 2/2/2006 8:17:50 AM
AE Shortlist: BRAY ASSOCIATES ARCHITECTS, INC., BWZ ARCHITECTS, DORSCHNER|ASSOCIATES, INC., STRANG, INC.
Selected AE: STRANG, INC.

Project No.: 05C2Q
Project Name: UW MSN Chadbourne Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $4,504,000
AE Submittal Date: 9/15/2005
Last Item Update: 11/8/2005 10:27:48 AM
AE Shortlist: ASSEMBLAGE ARCHITECTS, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC. in association with SOLOMON CORDWELL BUENZ , WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC., ROHRBACH ASSOCIATES PC
Selected AE: WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC.

Project No.: 05F2F
Project Name: GBY Union Expansion & Remodeling
Institution: UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
Location: CITY OF GREEN BAY, Wisconsin
Construction Cost: $4,871,000
AE Submittal Date: 8/3/2005
Last Item Update: 9/12/2005 9:55:37 AM
AE Shortlist: ARCHITECTS GROUP LIMITED in association with MOODY NOLAN, INC., CONTINUUM ARCHITECTS + PLANNERS, S.C., PERFORMA, INC., KEE ARCHITECTURE, INC.
Selected AE: KEE ARCHITECTURE, INC.

Project No.: 05B2G
Project Name: UWO South Campus Parking Ramp
Institution: UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $6,321,000
AE Submittal Date: 7/25/2005
Last Item Update: 9/12/2005 9:55:15 AM
AE Shortlist: GRAEF, ANHALT, SCHLOEMER & ASSOCIATES, INC., ARNOLD & O’SHERIDAN, INC., BLOOM CONSULTANTS, LLC, HARWOOD ENGINEERING CONSULTANTS, LLC
Selected AE: BLOOM CONSULTANTS, LLC.

Project No.: 04I1D
Project Name: UW PLT New Engineering Building
Institution: UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
Location: CITY OF PLATTEVILLE, Wisconsin
Construction Cost: $21,373,000
AE Submittal Date: 6/7/2005
Last Item Update: 8/10/2005 9:07:31 AM
AE Shortlist: CONTINUUM ARCHITECTS & PLANNERS, S.C. in joint venture with ROSS BARNEY+JANKOWSKI, INC., FLAD & ASSOCIATES, RIVER ARCHITECTS in association with HDR ARCHITECTURE, INC., WELMAN ARCHITECTS, INC. in association with VOA ASSOCIATES, INC.
Selected AE: RIVER ARCHITECTS in association with HDR ARCHITECTURE, INC.

Project No.: 04K1M
Project Name: Student Union Expansion & Admissions Cnt
Institution: UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
Location: CITY OF KENOSHA, Wisconsin
Construction Cost: $18,836,000
AE Submittal Date: 3/15/2005
Last Item Update: 5/10/2005 4:24:19 PM
AE Shortlist: BWZ ARCHITECTS in association with VASILKO. HAUSERMAN & ASSOCIATES, INC., PERFORMA INC. in association with ELLERBE BECKET, KAHLER SLATER ARCHITECTS in association with WTW ARCHITECTS. BARRIENTOS DESIGN & CONSULTING, LLC in association with DESIGN PARTNERSHIP OF CAMBRIDGE
Selected AE: KAHLER SLATER ARCHITECTS in association with WTW ARCHITECTS

Project No.: 04L1E
Project Name: UWSP Air Pollution Control Project
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $15,050,000
AE Submittal Date: 3/14/2005
Last Item Update: 5/10/2005 4:24:39 PM
AE Shortlist: HENNEMAN RAUFEISEN & ASSOCIATES, INC. ,OMNNI ASSOCIATES INC., PCI MANAGEMENT & CONSULTING CO, RAASCH ASSOCIATES, INC.
Selected AE: RAASCH ASSOCIATES, INC.

Project No.: 03D1Q
Project Name: UW WW College of Business & Economics
Institution: UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
Location: CITY OF WHITEWATER, Wisconsin
Construction Cost: $30,873,000
AE Submittal Date: 3/8/2005
Last Item Update: 5/10/2005 4:25:08 PM
AE Shortlist: WELMAN ARCHITECTS, INC. in association with VOA ASSOCIATES, INC., PERFORMA INC. in association with ELLERBE BECKET, ANGUS YOUNG ASSOCIATES INC. in association with BURT HILL KOSAR RITTELMAN ASSOCIATES, KAHLER SLATER ARCHITECTS
Selected AE: KAHLER SLATER ARCHITECTS

Project No.: 04H3L
Project Name: Waisman Ctr 6th 7th Floor Renov
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $4,522,000
AE Submittal Date: 1/24/2005
Last Item Update: 3/18/2005 3:30:52 PM
AE Shortlist: THE DURRANT GROUP in association with HARLEYELLIS, BERNERS-SCHOBER ASSOCIATES, INC., POTTER LAWSON, INC., STRANG, INC.
Selected AE: STRANG, INC.

Project No.: 00L1B
Project Name: UW PLT Ullsvik Ctr Remodeling & Addition
Institution: UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
Location: CITY OF PLATTEVILLE, Wisconsin
Construction Cost: $17,404,000
AE Submittal Date: 12/29/2004
Last Item Update: 3/18/2005 3:30:12 PM
AE Shortlist: CONTINUUM ARCHITECTS & PLANNERS, S.C., ANGUS YOUNG ASSOCIATES, INC., ISTHMUS ARCHITECTURE, INC., EPPSTEIN UHEN ARCHITECTS
Selected AE: EPPSTEIN UHEN ARCHITECTS

Project No.: 04B3F
Project Name: UW MSN 21st Century Telecom, Phase I
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $3,333,550
AE Submittal Date: 11/15/2004
Last Item Update: 2/1/2005 11:19:36 AM
AE Shortlist: TOKI & ASSOCIATES, INC. in association with INTELLIGENT NETWORK SOLUTIONS, CAMP, DRESSER & McKEE, INC. (Milwaukee, WI; St. Paul, MN; Walnut Creek, CA; Pittsburgh, PA; Chicago, IL), ARNOLD & O'SHERIDAN, INC., KJWW ENGINEERING CONSULTANTS
Selected AE: TOKI & ASSOCIATES, INC. in association with INTELLIGENT NETWORK SOLUTIONS

Project No.: 02K2U
Project Name: Stevens Point, University Ctr Addition
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $14,482,000
AE Submittal Date: 8/25/2004
Last Item Update: 10/8/2004 10:19:25 AM
AE Shortlist: Continuum Architects & Planners, S.C in joint venture with Dagit/Saylor Architects, Kahler Slater Architects in association with Mackey Mitchell Architects, Workshop Architects, Inc., SDS Architects, Inc. in association with Perkins & Will
Selected AE: SDS Architects, Inc. in association with Perkins & Will

Project No.: 04D1I
Project Name: UW MSN Fredric A Ogg Residence Hall
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $28,228,500
AE Submittal Date: 5/14/2004
Last Item Update: 4/20/2005 10:28:06 AM
AE Shortlist: UIHLEIN/WILSON ARCHITECTS, INC. in association with BOOTH HANSEN, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC. in association with SOLOMON CORDWELL BUENZ & ASSOCIATES, INC., POTTER LAWSON, INC. in association with ANTUNOVICH ASSOCIATES, EPPSTEIN UHEN ARCHITECTS
Selected AE: UIHLEIN/WILSON ARCHITECTS, INC. in association with BOOTH HANSEN

Project No.: 04A1W
Project Name: UW MSN Central Campus Utility Imprv
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $10,029,000
AE Submittal Date: 5/6/2004
Last Item Update: 7/2/2004 1:42:00 PM
AE Shortlist: HARWOOD ENGINEERING CONSULTANTS, LTD. IN ASSOCIATION WITH RMF ENGINEERING, INC., AFFILIATED ENGINEERS, INC., HENNEMAN, RAUFEISEN & ASSOCIATES, INC., RING & DuCHATEAU, INC.
Selected AE: RING & DuCHATEAU, INC.

Project No.: 03I1F
Project Name: Wild Rose Design Report
Institution: NATURAL RESOURCES/WILD ROSE HATCHERY
Location: TOWN OF ROSE, Wisconsin
Construction Cost: $20,051,700
AE Submittal Date: 4/27/2004
Last Item Update: 7/2/2004 10:56:30 AM
AE Shortlist: Graef, Anhalt, Schloemer & Associates, Inc. in association with Tetra Tech KCM and Tetra Tech KCM, Triad Engineering Incorporated (TEI) in association with Tetra Tech/KCM, Liesch Environmental Services, Inc. in association with Liesch Associates, Inc. and FishPro
Selected AE: Liesch Environmental Services, Inc. in association with Liesch Associates, Inc. and FishPro

Project No.: 03H3J
Project Name: DMA Camp Douglas Readiness Center
Institution: ADMINISTRATION/
Location: VILLAGE OF CAMP DOUGLAS, Wisconsin
Construction Cost: $5,396,000
AE Submittal Date: 4/16/2004
Last Item Update: 7/2/2004 10:55:25 AM
AE Shortlist: HSR ASSOCIATES, INC., BARRIENTOS DESIGN & CONSULTING, LLC. ARCHITECTS GROUP LIMITED, FISCHER-FISCHER-THEIS, INC
Selected AE: FISCHER-FISCHER-THEIS, INC

Project No.: 03D1R
Project Name: Phoenix Sports Exp and Remodel
Institution: UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
Location: CITY OF GREEN BAY, Wisconsin
Construction Cost: $23,802,000
AE Submittal Date: 2/10/2004
Last Item Update: 3/29/2004 3:27:35 PM
AE Shortlist: Venture Architects in association with Moody Nolan, Inc., Uihlein/Wilson Architects, Inc. in association with RDG Planning and Design, Berners-Schober Associates, Inc. in association with Rossetti, Potter Lawson Inc in association with Ellerbe Becket
Selected AE: Venture Architects in association with Moody Nolan, Inc.

Project No.: 03G1C
Project Name: UWO Student Rec and Wellness Center
Institution: UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $16,133,000
AE Submittal Date: 12/15/2003
Last Item Update: 2/20/2004 10:11:54 AM
AE Shortlist: Hammel, Green & Abrahamson, Inc., Uihlein/Wilson Architects, Inc. in association with RDG Planning and Design, Bray Associate Architects, Inc. in association with Hastings+Chivetta Architects, Inc., Potter Lawson, Inc. in association with Cannon Design
Selected AE: Potter Lawson, Inc. in association with Cannon Design

Project No.: 03H2L
Project Name: UW WW Connor Center Add & Remodeling
Institution: UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
Location: CITY OF WHITEWATER, Wisconsin
Construction Cost: $5,638,000
AE Submittal Date: 12/12/2003
Last Item Update: 2/20/2004 10:11:16 AM
AE Shortlist: KEE Architecture, Inc., Potter Lawson, Inc., BWZ Architects in joint venture with Vasilko.Hauserman & Associates, Inc., Workshop Architects, Inc.
Selected AE: Workshop Architects, Inc.

Project No.: 02G1S
Project Name: UW MSN Interdiscip Research Complex
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $133,991,954
AE Submittal Date: 12/12/2003
Last Item Update: 9/19/2005 4:43:16 PM
AE Shortlist: EPPSTEIN UHEN ARCHITECTS in association with NBBJ , KAHLER SLATER ARCHITECTS, INC. in association with DAVIS BRODY BOND, POTTER LAWSON, INC. in association with ZIMMER GUNSUL FRASCA PARTNERSHIP, FLAD & ASSOCIATES, UIHLEIN/WILSON ARCHITECTS, INC. in joint venture with BALLINGER, ZIMMERMAN DESIGN GROUP, INC. in association with HOK, Inc.
Selected AE: ZIMMERMAN DESIGN GROUP, INC. in association with HOK, Inc.

Project No.: 02G3H
Project Name: UW LX New Residence Hall
Institution: UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
Location: CITY OF LA CROSSE, Wisconsin
Construction Cost: $17,723,000
AE Submittal Date: 7/23/2003
Last Item Update: 11/12/2008 8:53:02 AM
AE Shortlist: Wenzler Architects, KEE Architecture, Inc. in association with Mackey Mitchell Associates, HSR Associates, Inc., Eppstein Uhen Architects
Selected AE: Eppstein Uhen Architects, Inc.

Project No.: 02I3F
Project Name: UWO Taylor Residence Hall Renov
Institution: UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $3,480,000
AE Submittal Date: 5/13/2003
Last Item Update: 7/23/2003 3:50:58 PM
AE Shortlist: EPPSTEIN UHEN ARCHITECTS, HGM ARCHITECTS, INC. in association with SOLOMON CORDWELL BUENZ & ASSOCIATES, INC., MILLER WAGNER COENEN/McMAHON, INC., UIHLEIN/WILSON ARCHITECTS, INC.
Selected AE: UIHLEIN/WILSON ARCHITECTS, INC.

Project No.: 00I2A
Project Name: DMA Constr US Property & Fiscal Office
Institution: MILITARY AFFAIRS/CAMP WILLIAMS
Location: VILLAGE OF CAMP DOUGLAS, Wisconsin
Construction Cost: $11,053,100
AE Submittal Date: 6/13/2002
Last Item Update: 8/20/2002 11:26:16 AM
AE Shortlist: HSR Associates, Inc., Zimmerman Design Group, Inc., Strang, Inc., Potter Lawson, Inc.
Selected AE: Potter Lawson, Inc.

Project No.: 00D1T
Project Name: New North Campus Res Hall Master Plan
Institution: UNIVERSITY OF WISCONSIN/STOUT CAMPUS
Location: TOWN OF MENOMINEE, Wisconsin
Construction Cost: $12,335,000
AE Submittal Date: 6/12/2002
Last Item Update: 8/20/2002 11:24:53 AM
AE Shortlist: Potter Lawson, Inc., Cedar Corporation in association with Mackey Mitchell Associates, SDS Architects, Inc. in association with Elness Swenson Graham Architects, Inc., Wenzler Architects
Selected AE: SDS Architects, Inc. in association with Elness Swenson Graham Architects, Inc.

Project No.: 02C2M
Project Name: UW PLT Ullrich Hall Renov
Institution: UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
Location: CITY OF PLATTEVILLE, Wisconsin
Construction Cost: $4,483,000
AE Submittal Date: 5/30/2002
Last Item Update: 7/23/2002 10:27:47 AM
AE Shortlist: HSR Associates, Inc., SDS Architects, Inc., River Architects, The Durrant Group
Selected AE: River Architects

Project No.: 01L4P
Project Name: Charter St. Boilers (104) Overhaul & Rep
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $2,270,000
AE Submittal Date: 5/24/2002
Last Item Update: 8/20/2002 11:23:55 AM
AE Shortlist: TC Group, Inc., Raasch Associates, Inc., Henneman Jaspal Engineering Services in association with SEGA, Inc., Jacobs – Green Bay Operations
Selected AE: TC Group, Inc.

Project No.: 02A4U
Project Name: DOC WPN North Cell Hall Plbg Fxt Replace
Institution: CORRECTIONS/WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
Location: CITY OF WAUPUN, Wisconsin
Construction Cost: $2,080,000
AE Submittal Date: 4/15/2002
Last Item Update: 7/23/2002 11:01:01 AM
AE Shortlist: Harwood Engineering Consultants, Ltd., Henneman Jaspal Engineering Services, PSJ Engineering Inc., The Durrant Group
Selected AE: PSJ Engineering Inc.

Project No.: 00J3Q
Project Name: DOC New Health Service - Oakhill
Institution: CORRECTIONS/OAKHILL CORRECTIONAL INSTITUTION, OREGON
Location: TOWN OF OREGON, Wisconsin
Construction Cost: $2,249,100
AE Submittal Date: 4/8/2002
Last Item Update: 7/31/2002 10:03:41 AM
AE Shortlist: Bray Associate Architects, Inc., Somerville, Inc., The Durrant Group, Venture Architects
Selected AE: Venture Architects

Project No.: 99J3O
Project Name: UWMIL Lapham North Wing Remodeling
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $7,210,000
AE Submittal Date: 3/28/2002
Last Item Update: 7/23/2002 10:04:33 AM
AE Shortlist: Continuum Architects + Planners, S.C., HSR Associates, Inc., The Durrant Group in association with HarleyEllis, Zimmerman Design Group, Inc.
Selected AE: Continuum Architects + Planners, S.C.

Project No.: 00H2W
Project Name: Gruenhagen Hall Fire Sprinkler Systems
Institution: UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $2,860,000
AE Submittal Date: 3/28/2002
Last Item Update: 6/3/2002 5:09:44 PM
AE Shortlist: Arnold & O’Sheridan, Inc., Berners Schober Associates, Inc., PSJ Engineering, Inc., Toki & Associates, Inc., in joint venture with Gage-Babcock & Associates, Inc.
Selected AE: PSJ Engineering, Inc.

Project No.: 02A3T
Project Name: Horicon Marsh International Education Ce
Institution: NATURAL RESOURCES/HORICON WILDLIFE AREA
Location: CITY OF HORICON, Wisconsin
Construction Cost: $2,060,000
AE Submittal Date: 3/25/2002
Last Item Update: 6/7/2002 8:12:06 AM
AE Shortlist: Mayo Corporation, Somerville, Inc., The Durrant Group, The Kubala Washatko Architects, Inc.
Selected AE: Mayo Corporation

Project No.: 00H2D
Project Name: Cemetery Planning
Institution: VETERANS AFFAIRS/WISCONSIN VETERANS HOME-KING
Location: Wisconsin
Construction Cost: $5,204,400
AE Submittal Date: 3/22/2002
Last Item Update: 6/3/2002 8:50:21 AM
AE Shortlist: Central Wisconsin Engineers & Architects, Inc. in association with VOA Associates, Inc., Strand Associates, Inc. in association with Carter and Burgess, Inc., Toki & Associates, Inc. in joint venture with Rae R. Reuss & Associates, Inc., Tribute Design Systems, Inc.
Selected AE: Strand Associates, Inc. in association with Carter and Burgess, Inc.

Project No.: 02A3W
Project Name: UW MDN ResHallsMaint Cole,Sull,Brad,Ogg
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $4,342,314
AE Submittal Date: 2/18/2002
Last Item Update: 4/26/2002 10:19:56 AM
AE Shortlist: Arnold & O'Sheridan, Barrientos Design & Consulting, LLC., HSR Associates, Inc., Somerville, Inc.
Selected AE: HSR Associates, Inc.

Project No.: 00J3P
Project Name: Mech Engineering Add & Remode
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $25,800,000
AE Submittal Date: 1/22/2002
Last Item Update: 3/6/2002 4:50:16 PM
AE Shortlist: Kahler Slater Architects, Renner Architects, Uihlein/Wilson Architects in joint venture with Ballinger, The Zimmerman Design Group
Selected AE: Zimmerman Design Group, Inc.

Project No.: 00K4A
Project Name: UW MSN Microbial Sciences Building
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $78,668,000
AE Submittal Date: 11/19/2001
Last Item Update: 2/22/2002 2:51:24 PM
AE Shortlist: Hammel, Green & Abrahamson, Inc. in assoc. Earl Walls Assoc.; HSR Associates, Inc. in assoc CUH2A; Kahler Slater Architects in assoc Davis Brody Bond, LLC; Plunkett Raysich Architects in assoc Anshen+Allen LA; Potter Lawson, Inc. in assoc Flad & Assoc., Inc.; Zimmerman Design Group in assoc Ellenzweig Assoc., Inc.
Selected AE: Plunkett Raysich Architects in assoc Anshen+Allen LA

Project No.: 01I1P
Project Name: Advanced Food Production Additions and R
Institution: VETERANS AFFAIRS/WISCONSIN VETERANS HOME-KING
Location: TOWN OF WAUPACA, Wisconsin
Construction Cost: $918,100
AE Submittal Date: 10/23/2001
Last Item Update: 1/4/2002 2:05:27 PM
AE Shortlist: Architects Group Limited, Central Wisconsin Engineers & Architects, Henneman-Jaspal Engineering Services, Marathon Engineers/Architects/Planners, LLC
Selected AE: Central Wisconsin Engineers & Architects

Project No.: 00B3T
Project Name: DOC FLCI Infrastructure Improve
Institution: CORRECTIONS/FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
Location: TOWN OF FOX LAKE, Wisconsin
Construction Cost: $16,000,000
AE Submittal Date: 9/24/2001
Last Item Update: 11/19/2001 4:49:50 PM
AE Shortlist: Bray Associate Architects, Inc. in association with C.G. Smith Construction, Inc.; DLR Group; The Durrant Group; PTD, Inc. in association with Marathon Engineers/Architects/Planners, LLC.
Selected AE: The Durrant Group

Project No.: 01C1T
Project Name: UW MSN Crew House
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $6,176,000
AE Submittal Date: 4/4/2001
Last Item Update: 2/28/2002 8:35:36 AM
AE Shortlist: Isthmus Architecture, Inc. in association with Turner Brooks Architects, KEE Architecture, Inc. in association with Vincent James Associates, Hammel, Green & Abrahamson, Inc., Graef, Anhalt, Schloemer & Associates, Inc. in association with Engberg Anderson Design Partnership, Inc.
Selected AE: KEE Architecture, Inc. in association with Vincent James Associates

Project No.: 00K1C
Project Name: UWMAD Weeks Hall Addition
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $5,000,000
AE Submittal Date: 4/4/2001
Last Item Update: 6/12/2001 11:58:28 AM
AE Shortlist: HSR Associates, Inc., Strang, Inc., Zimmerman Design Group, Inc., Toki & Associates, Inc. in association with Gensler Associates Architects
Selected AE: HSR Associates, Inc.

Project No.: 00F1Q
Project Name: Superior, Aquaculture Facility
Institution: UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
Location: CITY OF SUPERIOR, Wisconsin
Construction Cost: $2,600,000
AE Submittal Date: 1/17/2001
Last Item Update: 3/19/2001 2:27:24 PM
AE Shortlist: Short Elliott Hendrickson, Inc., G.W. Kortness Associates, Inc. in association with Cooper Engineering Co. Inc. , Louis Wasserman & Associates in association with MSA Professional Services, Inc.
Selected AE: Short Elliott Hendrickson, Inc.

Project No.: 99J3M
Project Name: Chamberlin Hall Renovation
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $18,576,000
AE Submittal Date: 11/15/2000
Last Item Update: 1/7/2001 10:25:07 AM
AE Shortlist: ZIMMERMAN DESIGN GROUP, INC.; STRANG, INC.; HSR ASSOCIATES, INC.; RENNER ARCHITECTS
Selected AE: RENNER ARCHITECTS

Project No.: 00F2G
Project Name: DVA Skilled Nursing Facility
Institution: VETERANS AFFAIRS/WISCONSIN VETERANS HOME-UNION GROVE
Location: VILLAGE OF UNION GROVE, Wisconsin
Construction Cost: $13,647,800
AE Submittal Date: 11/7/2000
Last Item Update: 10/27/2005 4:39:18 PM
AE Shortlist: Engberg Anderson Design Partnership in association with Nelson Tremain Partnership, P.A.; Wenzler Architects; Balestrieri-Kehoe & Associates, Inc. in joint venture with Wilmot/Sanz, Inc.; Zimmerman Design Group, Inc.
Selected AE: Engberg Anderson Design Partnership in association with Nelson Tremain Partnership

Project No.: 00F2C
Project Name: Meat/Muscle Science Lab Replacement
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $12,600,000
AE Submittal Date: 11/7/2000
Last Item Update: 1/18/2001 9:44:10 AM
AE Shortlist: KJWW ENGINEERING CONSULTANTS; ZIMMERMAN DESIGN GROUP, INC.; MEAD & HUNT, INC.; WENZLER ARCHITECTS
Selected AE: KJWW ENGINEERING CONSULTANTS

Project No.: 99K3Y
Project Name: DOA New Crime Laboratory 2001-03 enum
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MADISON, Wisconsin
Construction Cost: $8,378,000
AE Submittal Date: 10/11/2000
Last Item Update: 12/14/2000 10:44:21 AM
AE Shortlist: BHS Architects, Inc. in association with Affiliated Engineers, Inc.; HSR Associates, Inc. in association with CUH2A, Inc. ; Strang, Inc.; The Durrant Group in association with McClaren, Wilson & Lawrie, Inc.
Selected AE: BHS Architects, Inc. in association with Affiliated Engineers, Inc

Project No.: 00F1O
Project Name: NORTHEAST REGIONAL HEADQUARTERS FACILITY
Institution: NATURAL RESOURCES/NORTHEASTERN REGIONAL OFFICE
Location: VILLAGE OF HOWARD, Wisconsin
Construction Cost: $3,900,000
AE Submittal Date: 9/20/2000
Last Item Update: 11/27/2000 11:16:51 AM
AE Shortlist: Berners-Schobers Associates, Strang, Inc., Architects Group, Ltd., Raasch Associates, Inc.
Selected AE: Berners-Schober Associates, Inc.

Project No.: 99J3S
Project Name: UWW Upham Science Addition/Renovation
Institution: UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
Location: CITY OF WHITEWATER, Wisconsin
Construction Cost: $16,500,000
AE Submittal Date: 8/16/2000
Last Item Update: 10/25/2000 3:53:59 PM
AE Shortlist: Renner Architects, Plunkett Raysich Architects in association with Earl Walls Associates, Uihlein/Wilson Architects, Inc. in joint venture with Ballinger, HSR Associates, Inc. in association with Ellerbe Becket
Selected AE: Uihlein/Wilson Architects, Inc. in joint venture with Ballinger

Project No.: 99K4N
Project Name: River Falls, New Residence Hall
Institution: UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
Location: CITY OF RIVER FALLS, Wisconsin
Construction Cost: $8,965,000
AE Submittal Date: 8/16/2000
Last Item Update: 10/6/2000 10:34:09 AM
AE Shortlist: Zimmerman Design Group, Inc.; DLR Group, Wenzler Architects, HSR Associates, Inc.
Selected AE: Wenzler Architects

Project No.: 00G2V
Project Name: River Falls, Student Union
Institution: UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
Location: CITY OF RIVER FALLS, Wisconsin
Construction Cost: $20,350,000
AE Submittal Date: 8/16/2000
Last Item Update: 10/6/2000 10:33:38 AM
AE Shortlist: Berners Schober Associates, Workshop Architects, Inc. in association with Moody/Nolan, Ltd. Inc.; HSR Associates, Inc. in association with Ellerbe Becket, Inc.; SDS Architects, Inc.
Selected AE: Workshop Architects, Inc. in association with Moody/Nolan, Ltd. Inc.

Project No.: 00C5A
Project Name: UW MSN Biotechnology Building Addition
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $27,000,000
AE Submittal Date: 8/2/2000
Last Item Update: 9/20/2000 3:04:46 PM
AE Shortlist: HSR Associates, Inc. in association with CUH2A, Inc.; Potter Lawson, Inc. in association with GPR Planners Collaborative, Inc.; Zimmerman Design Group in association with Research Facilities Design; Hammel, Green & Abahamson, Inc.
Selected AE: Potter Lawson, Inc. in association with GPR Planners Collaborative, Inc.

Project No.: 99J3R
Project Name: Superior, Gates Phy Ed Addition/Remodel
Institution: UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
Location: CITY OF SUPERIOR, Wisconsin
Construction Cost: $14,088,000
AE Submittal Date: 8/2/2000
Last Item Update: 9/7/2000 3:25:01 PM
AE Shortlist: Berners Schober Associates; Somerville, Inc. in association with GW Korness & Associates, Inc.; SDS Architects, Inc.; HSR Associates, Inc., in association with RDG Bussard Dikis
Selected AE: SDS Architects, Inc.

Project No.: 00F3O
Project Name: DOA Info Tech Second Site Computer Fac
Institution: ADMINISTRATION/ADMINISTRATIVE FACILITIES
Location: CITY OF MADISON, Wisconsin
Construction Cost: $4,630,000
AE Submittal Date: 7/11/2000
Last Item Update: 4/7/2005 2:12:56 PM
AE Shortlist: Affiliated Engineers, Inc.; Arnold & O’Sheridan, Inc.; Grumman Butkus Associates, Durrant Engineers, Inc.
Selected AE: Arnold & O'Sheridan, Inc.

Project No.: 00E2F
Project Name: New Exposition Building
Institution: STATE FAIR PARK/STATE FAIR PARK - WEST ALLIS
Location: CITY OF WEST ALLIS, Wisconsin
Construction Cost:  
AE Submittal Date: 6/14/2000
Last Item Update: 7/21/2000 1:14:08 PM
AE Shortlist: Renner Architects in association with Bullock, Smith & Partners; Eppstein Uhen Architects in association with RTKL; Durrant Architects in association with Convention Center Design Group; Zimmerman Design Group in association with HOK
Selected AE: Eppstein Uhen Architects in association with RTKL

Project No.: 00C4L
Project Name: UW MSN WI Veterinary Diagnostic Lab
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost:  
AE Submittal Date: 6/14/2000
Last Item Update: 8/3/2000 4:06:59 PM
AE Shortlist: HSR Associates, Inc. in association with CUH2A, Inc.; Zimmerman Design Group, Inc. in association with Research Facilities Design; Potter Lawson Inc., in association with HLM Design; Strang Inc.
Selected AE: Strang, Inc.

Project No.: 00D2A
Project Name: Veterinary Med Teaching Hospital
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $3,200,000
AE Submittal Date: 6/14/2000
Last Item Update: 8/2/2000 5:04:23 PM
Selected AE: Zimmerman Design Group

Project No.: 99J3N
Project Name: UWMIL Klotsche Ctr PE Add Remodel Pkg
Institution: UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $19,800,000
AE Submittal Date: 5/24/2000
Last Item Update: 7/6/2000 1:46:06 PM
AE Shortlist: Workshop Architects, Inc., Venture Architects, Uihlein/Wilson Architects, Inc.
Selected AE: Venture Architects in association with HOK Sports Facilities

Project No.: 00B5K
Project Name: DNR Building Addition & Remodeling
Institution: NATURAL RESOURCES/SOUTH CENTRAL REGIONAL OFFICE
Location: CITY OF FITCHBURG, Wisconsin
Construction Cost: $3,140,000
AE Submittal Date: 5/10/2000
Last Item Update: 8/4/2000 1:58:50 PM
AE Shortlist: Bray Associates, Inc.; Fischer-Fischer-Theis, Inc.; HSR Associates, Inc.; Plunkett Raysich Architects
Selected AE: Fischer-Fischer-Theis, Inc.

Project No.: 00B6B
Project Name: New Facility OMS #10
Institution: MILITARY AFFAIRS/OSHKOSH
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $4,223,200
AE Submittal Date: 5/10/2000
Last Item Update: 6/21/2000 10:39:45 AM
AE Shortlist: Fischer-Fischer-Theis, Inc.; Graef Anhalt Schloemer & Assoc., Inc.; HSR Assoc., Inc.; Short Elliott Hendrickson, Inc.
Selected AE: HSR Associates, Inc.

Project No.: 99K4R
Project Name: Add 50 Cells
Institution: CORRECTIONS/OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $4,189,500
AE Submittal Date: 5/3/2000
Last Item Update: 6/13/2000 9:09:29 AM
AE Shortlist: DLR Group, Durrant Architects, Potter Lawson, Inc.; Venture Architects
Selected AE: Potter Lawson, Inc.

Project No.: 99L6Q
Project Name: DACC Repl Windows / Upgrd HVAC Sys
Institution: CORRECTIONS/DRUG ABUSE CORRECTIONAL CENTER, WINNEBAGO
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $5,360,000
AE Submittal Date: 5/3/2000
Last Item Update: 6/13/2000 10:01:24 AM
AE Shortlist: Balestrieri-Kehoe & Assoc., Inc.; DLR Group, PTD, Inc.
Selected AE: Balestrieri-Kehoe & Assoc., Inc.

Project No.: 00B6J
Project Name: DVA New Domiciliary Building
Institution: VETERANS AFFAIRS/WISCONSIN VETERANS HOME-UNION GROVE
Location: VILLAGE OF UNION GROVE, Wisconsin
Construction Cost: $3,000,000
AE Submittal Date: 4/12/2000
Last Item Update: 6/12/2000 7:36:58 AM
AE Shortlist: Plunkett Raysich Architects, HSR Associates, Inc., Zimmerman Design Group, Inc., Hammel, Green & Abrahamson, Inc.
Selected AE: Plunkett Raysich Architects

Project No.: 00A4V
Project Name: Lakeshore State Park
Institution: NATURAL RESOURCES/Lakeshore State Park
Location: CITY OF MILWAUKEE, Wisconsin
Construction Cost: $9,000,000
AE Submittal Date: 4/3/2000
Last Item Update: 5/2/2000 2:58:49 PM
Selected AE: JJR, Incorporated

Project No.: 99J3L
Project Name: UWGB Lab Sciences Addition & Rmdl
Institution: UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
Location: CITY OF GREEN BAY, Wisconsin
Construction Cost: $16,600,000
AE Submittal Date: 3/29/2000
Last Item Update: 5/17/2000 5:12:50 PM
AE Shortlist: Uihlein Wilson Architects Inc. in joint venture with Ballinger, Zimmerman Design Group,Inc., Berners Schober Assoc., Inc., Plunkett Raysich Architects
Selected AE: Plunkett Raysich Architects

Project No.: 99J1C
Project Name: Fine Arts Center Addition and Remodeling
Institution: UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
Location: CITY OF STEVENS POINT, Wisconsin
Construction Cost: $21,557,000
AE Submittal Date: 3/22/2000
Last Item Update: 5/2/2000 1:30:16 PM
Selected AE: Hammel, Green & Abrahamson, Inc.

Project No.: 99L6M
Project Name: Remodel Cottages 1 and 12
Institution: CORRECTIONS/OAKHILL CORRECTIONAL INSTITUTION, OREGON
Location: Wisconsin
Construction Cost: $3,553,000
AE Submittal Date: 3/22/2000
Last Item Update: 5/2/2000 3:31:05 PM
Selected AE: PTD, Inc.

Project No.: 00A1U
Project Name: SFP Replace Grandstand
Institution: STATE FAIR PARK/STATE FAIR PARK - WEST ALLIS
Location: CITY OF WEST ALLIS, Wisconsin
Construction Cost: $12,500,000
AE Submittal Date: 1/31/2000
Last Item Update: 4/21/2000 3:50:41 PM
Selected AE: Venture Architects

Project No.: 99I4U
Project Name: UW Mad. SE Recreation Facility
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $6,106,000
AE Submittal Date: 12/7/1999
Last Item Update: 4/21/2000 4:02:24 PM
Selected AE: Bray Associate Architects, Inc.

Project No.: 99I1F
Project Name: UWMad Witte A&B - Kronshage Hall Remodel
Institution: UNIVERSITY OF WISCONSIN/MADISON CAMPUS
Location: CITY OF MADISON, Wisconsin
Construction Cost: $8,288,500
AE Submittal Date: 12/7/1999
Last Item Update: 4/21/2000 3:49:17 PM
Selected AE: Arnold & O'Sheridan, Madison, Wisconsin

Project No.: 99H3E
Project Name: Segregation / Housing Unit
Institution: CORRECTIONS/TAYCHEEDAH CORRECTIONAL INSTITUTION
Location: TOWN OF TAYCHEEDAH, Wisconsin
Construction Cost: $15,843,800
AE Submittal Date: 9/24/1999
Last Item Update: 4/21/2000 3:26:58 PM
Selected AE: Boldt Construction & Venture Architects

Project No.: 99H3B
Project Name: DOC WCC 150 Bed Work House
Institution: CORRECTIONS/WINNEBAGO CORRECTION CENTER
Location: CITY OF OSHKOSH, Wisconsin
Construction Cost: $5,120,000
AE Submittal Date: 9/23/1999
Last Item Update: 4/21/2000 2:54:43 PM
Selected AE: PTD, Inc.

Project No.: 99H3D
Project Name: DOC VARIOUS Prob/Parole Hold Fac-4 Locat
Institution: CORRECTIONS/VARIOUS
Location: VILLAGE OF STURTEVANT, Wisconsin
Construction Cost: $22,789,000
AE Submittal Date: 9/22/1999
Last Item Update: 4/21/2000 3:23:27 PM
Selected AE: Durrant Architects in association with Durrant Eng

Project No.: 99I1Q
Project Name: DOC HIGH Correctional Institution
Institution: CORRECTIONS/GERIATRIC OFFENDER-NORTHERN WISCONSIN CENTER
Location: CITY OF CHIPPEWA FALLS, Wisconsin
Construction Cost: $7,294,000
AE Submittal Date: 9/21/1999
Last Item Update: 4/21/2000 3:28:49 PM
Selected AE: PTD, Inc.

Project No.: 99E2I
Project Name: DOC WCI Visitors Center Renovation
Institution: CORRECTIONS/WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
Location: CITY OF WAUPUN, Wisconsin
Construction Cost: $7,604,900
AE Submittal Date: 9/17/1999
Last Item Update: 4/21/2000 2:59:46 PM
Selected AE: Venture Architects