Project No.:
|
21K1P
|
Project Name: |
UWMIL Central Heating Plant Chiller Replacement
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$13,360,000
|
AE Submittal Date: |
7/25/2022 2:30:00 PM |
Last Item Update: |
10/4/2022 3:12:06 PM |
AE Submitting Qualifications: |
Affiliated Engineers, Inc. Hammel, Green and Abrahamson, Inc. KFI Engineers, Inc. Ring & DuChateau, LLP Salas O’Brien North, LLC
|
AE Shortlist: |
Affiliated Engineers, Inc., Hammel, Green and Abrahamson, Inc., Ring & DuChateau, LLP |
Selected AE: |
Ring & DuChateau, LLP |
|
Project No.:
|
21I2Q R
|
Project Name: |
Wisconsin Vet Diagnostic Lab Renovation and Expansion - Barron
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
TOWN OF BARRON, Wisconsin
|
Construction Cost: |
$7,372,000
|
AE Submittal Date: |
6/23/2022 2:30:00 PM |
Last Item Update: |
9/27/2022 4:28:57 PM |
AE Submitting Qualifications: |
Cedar Corporation in assoc. with MSR Design Design Engineers in assoc. with INVISION Architecture
|
AE Shortlist: |
Cedar Corporation in assoc. with MSR Design, Design Engineers in assoc. with INVISION Architecture |
Selected AE: |
Design Engineers in assoc. with INVISION Architecture |
|
Project No.:
|
17L1L
|
Project Name: |
Central Services Kitchen Remodel
|
Institution: |
VETERANS AFFAIRS/WISCONSIN VETERANS HOME-KING
|
Location: |
TOWN OF FARMINGTON, Wisconsin
|
Construction Cost: |
$8,916,800
|
AE Submittal Date: |
4/25/2022 2:30:00 PM |
Last Item Update: |
7/11/2022 2:13:46 PM |
AE Submitting Qualifications: |
Assemblage Architects Boer Architects, Inc.
|
AE Shortlist: |
Assemblage Architects, Boer Architects, Inc. |
Selected AE: |
Assemblage Architects |
|
Project No.:
|
21L3J
|
Project Name: |
Engineering Building Replacement
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$192,444,000
|
AE Submittal Date: |
3/4/2022 2:30:00 PM |
Last Item Update: |
5/19/2022 4:33:25 PM |
AE Submitting Qualifications: |
Aro Eberle Architects in assoc. with Ballinger Continuum Architects + Planners in assoc. with SmithGroup and Ring & DuChateau, LLP Eppstein Uhen Architects in assoc. with Pelli Clarke & Partners Flad Architects Hammel, Green and Abrahamson, Inc. Kahler Slater, Inc. in assoc. with LMN Architects OPN Architects, Inc. in assoc. with ZGF Plunkett Raysich Architects in assoc. with Ennead Architects
|
AE Shortlist: |
Continuum Architects + Planners in assoc. with SmithGroup and Ring & DuChateau, LLP, Flad Architects, Hammel, Green and Abrahamson, Inc., OPN Architects, Inc. in assoc. with ZGF |
Selected AE: |
Continuum Architects + Planners in assoc. with SmithGroup and Ring & DuChateau, LLP |
|
Project No.:
|
21I1H
|
Project Name: |
WSPF New HSU and RHU Expansion
|
Institution: |
CORRECTIONS/Wisconsin Secure Program Facility
|
Location: |
CITY OF BOSCOBEL, Wisconsin
|
Construction Cost: |
$5,600,000
|
AE Submittal Date: |
1/21/2022 2:30:00 PM |
Last Item Update: |
3/3/2022 1:25:29 PM |
AE Submitting Qualifications: |
Venture Architects
|
Selected AE: |
Venture Architects |
|
Project No.:
|
19K2R
|
Project Name: |
Wisconsin History Center
|
Institution: |
HISTORICAL SOCIETY/HISTORICAL SOCIETY, MADISON
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$62,076,700
|
AE Submittal Date: |
1/20/2022 2:30:00 PM |
Last Item Update: |
3/22/2022 3:46:35 PM |
AE Submitting Qualifications: |
Continuum Architects + Planners in assoc. with SmithGroup Engberg Anderson, Inc. in assoc. with Allied Works Architecture, Inc. Eppstein Uhen Architects in assoc. with Fentress Architects, Ltd. Hammel, Green and Abrahamson, Inc. InSite Consulting Architects, LLC in assoc. with MSR Design Kahler Slater, Inc. in assoc. with SOM MartinRiley Architects + Engineers in assoc. with Quinn Evans OPN Architects, Inc. in assoc. with Adjaye Associates Plunkett Raysich Architects in assoc. with Morphosis Architects Potter Lawson, Inc. in assoc. with Perkins+Will
Quorum Architects, Inc. in assoc. with B.I.G. Architecture A.P.C. Workshop Architects, Inc. in assoc. with Snohetta |
AE Shortlist: |
Continuum Architects + Planners in assoc. with SmithGroup, Engberg Anderson, Inc. in assoc. with Allied Works Architecture, Inc., Hammel, Green, and Abrahamson, Inc., OPN Architects, Inc. in assoc. with Adjaye Associates |
Selected AE: |
Continuum Architects + Planners in assoc. with SmithGroup |
|
Project No.:
|
21H3C
|
Project Name: |
Sherman Hall Admissions Renovations
|
Institution: |
HEALTH SERVICES/WINNEBAGO MENTAL HEALTH INSTITUTE
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$13,107,000
|
AE Submittal Date: |
12/1/2021 2:30:00 PM |
Last Item Update: |
3/3/2022 3:35:11 PM |
AE Submitting Qualifications: |
Hammel, Green and Abrahamson, Inc. Kehoe Henry & Associates, Inc. Mead & Hunt, Inc. in association with BWBR Zimmerman Architectural Studios, Inc.
|
AE Shortlist: |
Hammel, Green and Abrahamson, Inc., Kehoe Henry & Associates, Inc., Mead & Hunt, Inc. in association with BWBR, Zimmerman Architectural Studios, Inc. |
Selected AE: |
Hammel, Green and Abrahamson, Inc. |
|
Project No.:
|
21D3T
|
Project Name: |
Heritage Hall Addition & Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
Construction Cost: |
$77,514,000
|
AE Submittal Date: |
11/16/2021 2:30:00 PM |
Last Item Update: |
2/8/2022 4:40:14 PM |
AE Submitting Qualifications: |
BWBR Architects, Inc. Dorschner Associates, Inc. in assoc. w/ Sasaki Associates, Inc. Kahler Slater, Inc. LHB, Inc. River Architects, Inc. River Valley Architects, Inc. in assoc. w/ HGA
|
AE Shortlist: |
Dorschner Associates, Inc. in assoc. w/ Sasaki Associates, Inc., Kahler Slater, Inc., River Architects, Inc., River Valley Architects, Inc. in assoc. w/ HGA |
Selected AE: |
River Architects, Inc. |
|
Project No.:
|
21H1L
|
Project Name: |
SRSTC Skilled Care Unit Expansion
|
Institution: |
HEALTH SERVICES/SECURE TREATMENT FACILITY, MAUSTON
|
Location: |
CITY OF MAUSTON, Wisconsin
|
Construction Cost: |
$9,696,000
|
AE Submittal Date: |
11/8/2021 2:30:00 PM |
Last Item Update: |
1/11/2022 8:43:50 AM |
AE Submitting Qualifications: |
Kehoe Henry & Associates Inc Mead & Hunt, Inc. Venture Architects
|
AE Shortlist: |
Mead & Hunt, Inc. in assoc. with BWBR, Venture Architects |
Selected AE: |
Venture Architects |
|
Project No.:
|
20K1R
|
Project Name: |
Recreation Complex: Remodeling and Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
Construction Cost: |
$19,242,000
|
AE Submittal Date: |
10/20/2021 2:30:00 PM |
Last Item Update: |
1/27/2022 2:37:02 PM |
AE Submitting Qualifications: |
HSR Associates, Inc. I & S Group, Inc. in assoc. with Hastings+Chivetta Kahler Slater, Inc. Ramlow/Stein, Inc. River Valley Architects, Inc. Shive-Hattery SmithGroup, Inc.
|
AE Shortlist: |
HSR Associates, Inc., I & S Group, Inc. in assoc. with Hastings+Chivetta, Ramlow/Stein, Inc. |
Selected AE: |
Ramlow/Stein, Inc. |
|
Project No.:
|
21E2W
|
Project Name: |
Cofrin Technology & Education Center
|
Institution: |
UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
|
Location: |
CITY OF GREEN BAY, Wisconsin
|
Construction Cost: |
$72,727,000
|
AE Submittal Date: |
9/1/2021 3:30:00 PM |
Last Item Update: |
11/22/2021 4:58:01 PM |
AE Submitting Qualifications: |
Berners-Schober Associates, Inc. Continuum Architects + Planners in assoc. with Gensler Engberg Anderson, Inc. in assoc. with Shepley Bulfinch Hammel, Green, and Abrahamson, Inc. OPN Architects, Inc. Somerville, Inc. in assoc. with Perkins + Will Workshop Architects, Inc.
|
AE Shortlist: |
Berners-Schober Associates, Inc., Engberg Anderson, Inc. in assoc. with Shepley Bulfinch, Hammel, Green, and Abrahamson, Inc. |
Selected AE: |
Engberg Anderson, Inc. in assoc. with Shepley Bulfinch |
|
Project No.:
|
21E1Z
|
Project Name: |
Cemetery Improvements Phase VI
|
Institution: |
VETERANS AFFAIRS/SOUTHERN WI VETERANS MEMORIAL CEMETERY-UNION GROVE
|
Location: |
TOWN OF DOVER, Wisconsin
|
Construction Cost: |
$10,703,000
|
AE Submittal Date: |
8/6/2021 2:30:00 PM |
Last Item Update: |
10/4/2021 4:01:14 PM |
AE Submitting Qualifications: |
SmithGroup, Inc. Stantec Consulting Services, Inc. Tribute Design Systems, LLC in assoc. with Bloom Companies, LLC
|
AE Shortlist: |
SmithGroup, Inc., Stantec Consulting Services, Inc., Tribute Design Systems, LLC in assoc. with Bloom Companies, LLC |
Selected AE: |
SmithGroup, Inc. |
|
Project No.:
|
20J1T
|
Project Name: |
Center for the Arts Parking Ramp & Police Building Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$17,391,000
|
AE Submittal Date: |
7/7/2021 2:30:00 PM |
Last Item Update: |
10/4/2021 4:11:12 PM |
AE Submitting Qualifications: |
Bloom Companies, LLC BWBR Architects, Inc. Engberg Anderson, Inc. in assoc. with WGI, Inc. GRAEF
|
AE Shortlist: |
Bloom Companies, LLC, BWBR Architects, Inc., Engberg Anderson, Inc. in assoc. with WGI, Inc., GRAEF |
Selected AE: |
GRAEF |
|
Project No.:
|
21C3B
|
Project Name: |
Engineering Drive Utilities Replacement and Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$41,379,000
|
AE Submittal Date: |
5/5/2021 2:30:00 PM |
Last Item Update: |
8/19/2021 4:52:30 PM |
AE Submitting Qualifications: |
Affiliated Engineers, Inc. Ring & DuChateau, LLP Shive-Hattery, Inc.
|
AE Shortlist: |
Affiliated Engineers, Inc., Ring & DuChateau, LLP, Shive-Hattery, Inc. |
Selected AE: |
Shive-Hattery, Inc. |
|
Project No.:
|
20K1G
|
Project Name: |
College of Letters & Science Academic Building
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$53,512,000
|
AE Submittal Date: |
4/12/2021 2:30:00 PM |
Last Item Update: |
7/8/2021 3:02:54 PM |
AE Submitting Qualifications: |
Berners-Schober Associates, Inc. Continuum Architects + Planners in assoc. w/ Bohlin Cywinski Jackson Dorschner Associates, Inc. in assoc. w/ Gensler Engberg Anderson, Inc. in assoc. w/ Perkins+Will Eppstein Uhen Architects in assoc. w/ RATIO Flad Architects Hammel, Green and Abrahamson, Inc. InSite Consulting Architects, LLC in assoc. w/ JLG Architects Korb + Associates Architects in assoc. w/ TWBTA OPN Architects, Inc. Ramlow/Stein, Inc. in assoc. w/ Bora Architecture & Interiors SmithGroup, Inc. Strang, Inc. Workshop Architects, Inc. in assoc. w/ BNIM Zimmerman Architectural Studios, Inc.
|
AE Shortlist: |
Continuum Architects + Planners in assoc. w/ Bohlin Cywinski Jackson, Flad Architects, Ramlow/Stein, Inc. in assoc. w/ Bora Architecture & Interiors, SmithGroup, Inc. |
Selected AE: |
Ramlow/Stein, Inc. in assoc. w/ Bora Architecture & Interiors |
|
Project No.:
|
20E2X
|
Project Name: |
Engineering Building Replacement Phase I
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$90,918,000
|
AE Submittal Date: |
11/4/2020 3:30:00 PM |
Last Item Update: |
1/22/2021 3:46:50 PM |
AE Submitting Qualifications: |
Aro Eberle Architects in assoc. w/ Ballinger BWBR Architects, Inc. in assoc. w/ CannonDesign Continuum Architects + Planners in assoc. w/ SmithGroup Dorschner Associates, Inc. in assoc. w/ Sasaki Associates Flad Architects Hammel, Green and Abrahamson, Inc. OPN Architects, Inc. Plunkett Raysich Architects in assoc. w/ Ennead Architects Ramlow/Stein, Inc. in assoc. w/ Payette Associates Strang, Inc. in assoc. w/ Perkins+Will Zimmerman Architectural Studios, Inc. in assoc. w/ HED
|
AE Shortlist: |
Aro Eberle Architects in assoc. w/ Ballinger, Hammel, Green and Abrahamson, Inc., OPN Architects, Inc., Plunkett Raysich Architects in assoc. w/ Ennead Architects |
Selected AE: |
Aro Eberle Architects in assoc. w/ Ballinger |
|
Project No.:
|
20D1B
|
Project Name: |
Graff Main Hall HVAC System Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$10,639,000
|
AE Submittal Date: |
10/15/2020 2:30:00 PM |
Last Item Update: |
3/31/2021 8:30:16 AM |
AE Submitting Qualifications: |
Design Engineers Dynamic Consulting Engineers, LLC Henneman Engineering, Inc. Lien & Peterson Architects, Inc.
|
AE Shortlist: |
Design Engineers, Dynamic Consulting Engineers, LLC, Henneman Engineering, Inc. |
Selected AE: |
Design Engineers |
|
Project No.:
|
19J1D
|
Project Name: |
Food Service Building Renovation
|
Institution: |
HEALTH SERVICES/MENDOTA MENTAL HEALTH INSTITUTE, MADISON
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$21,350,000
|
AE Submittal Date: |
9/1/2020 2:30:00 PM |
Last Item Update: |
12/23/2020 8:23:45 AM |
AE Submitting Qualifications: |
Assemblage Architects Potter Lawson, Inc. Sketchworks Architecture, LLC Strang, Inc. Uihlein/Wilson - Ramlow/Stein Architects, Inc. Venture Architects
|
AE Shortlist: |
Potter Lawson, Inc., Strang, Inc., Uihlein/Wilson - Ramlow/Stein Architects, Inc., Venture Architects |
Selected AE: |
Ramlow/Stein Architects, Inc. |
|
Project No.:
|
20A1E
|
Project Name: |
Addition and Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
TOWN OF MENOMONIE, Wisconsin
|
Construction Cost: |
$14,648
|
AE Submittal Date: |
8/19/2020 2:30:00 PM |
Last Item Update: |
10/21/2020 2:13:19 PM |
AE Submitting Qualifications: |
Assemblage Architects Berners-Schober Associates, Inc. BWBR Architects, Inc. BWZ Architects Engberg Anderson, Inc. Hammel, Green and Abrahamson, Inc. LHB, Inc. Lien & Peterson Architects, Inc. Mead & Hunt, Inc. MEP Associates, LLC Plunkett Raysich Architects SDS Architects, Inc. Somerville, Inc. Uihlein/Wilson - Ramlow/Stein Architects, Inc. |
AE Shortlist: |
LHB, Inc., Plunkett Raysich Architects, Somerville, Inc., Uihlein/Wilson - Ramlow/Stein Architects, Inc. |
Selected AE: |
Ramlow/Stein Architects, Inc. |
|
Project No.:
|
19G1J
|
Project Name: |
Prairie Springs Science Center - Phase II
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$63,021,000
|
AE Submittal Date: |
8/4/2020 2:30:00 PM |
Last Item Update: |
10/15/2020 11:30:18 AM |
AE Submitting Qualifications: |
Hammel, Green and Abrahamson, Inc. Performa, Inc. in association with HED River Architects, Inc. Strang, Inc. in association with CannonDesign Uihlein/Wilson - Ramlow/Stein Architects, Inc. in association with Alliiance
|
AE Shortlist: |
River Architects, Inc., Strang, Inc. in association with CannonDesign, Uihlein/Wilson - Ramlow/Stein Architects, Inc. in association with Alliiance |
Selected AE: |
River Architects, Inc. |
|
Project No.:
|
17E3C
|
Project Name: |
Building 6 Remodel
|
Institution: |
HEALTH SERVICES/CENTRAL WISCONSIN CENTER, MADISON
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$10,205,000
|
AE Submittal Date: |
4/2/2020 2:30:00 PM |
Last Item Update: |
9/18/2020 4:31:48 PM |
AE Submitting Qualifications: |
Dorschner Associates, Inc. Somerville, Inc. Zimmerman Architectural Studios, Inc.
|
AE Shortlist: |
Dorschner Associates, Inc., Somerville, Inc., Zimmerman Architectural Studios, Inc. |
Selected AE: |
Zimmerman Architectural Studios, Inc. |
|
Project No.:
|
19J4E
|
Project Name: |
Science / Health Science Building
|
Institution: |
UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
|
Location: |
CITY OF EAU CLAIRE, Wisconsin
|
Construction Cost: |
$178,838,000
|
AE Submittal Date: |
3/3/2020 2:30:00 PM |
Last Item Update: |
7/31/2020 11:40:23 AM |
AE Submitting Qualifications: |
Bray Associates Architects, Inc. in assoc. with HED Eppstein Uhen Architects in assoc. with Perkins&Will Flad Architects Hammel, Green and Abrahamson, Inc. Potter Lawson, Inc. SmithGroup, Inc. Strang, Inc. in assoc. with CannonDesign
|
AE Shortlist: |
Bray Associates Architects, Inc. in assoc. with HED, Eppstein Uhen Architects in assoc. with Perkins&Will, Hammel, Green and Abrahamson, Inc., Potter Lawson, Inc. |
Selected AE: |
Potter Lawson, Inc. |
|
Project No.:
|
19I2Q
|
Project Name: |
New Health Services Unit, Stanley Correctional Institution
|
Institution: |
CORRECTIONS/STANLEY CORRECTIONAL INSTITUTION, STANLEY
|
Location: |
CITY OF STANLEY, Wisconsin
|
Construction Cost: |
$8,213,000
|
AE Submittal Date: |
2/26/2020 2:30:00 PM |
Last Item Update: |
9/18/2020 4:31:26 PM |
AE Submitting Qualifications: |
Kehoe Henry & Associates, Inc. Mead & Hunt Venture Architects
|
AE Shortlist: |
Kehoe Henry & Associates, Inc., Mead & Hunt, Venture Architects |
Selected AE: |
Mead & Hunt |
|
Project No.:
|
19J3I
|
Project Name: |
SWQ Master Plan Update and New Engineering Building
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$90,872,000
|
AE Submittal Date: |
2/10/2020 2:30:00 PM |
Last Item Update: |
7/28/2020 10:21:53 AM |
AE Submitting Qualifications: |
Continuum Architects + Planners in assoc. with SmithGroup Engberg Anderson, Inc. in assoc. with Gensler Eppstein Uhen Architects in assoc. with Perkins&Will Flad Architects Hammel, Green and Abrahamson, Inc. Strang, Inc. |
AE Shortlist: |
Continuum Architects + Planners in assoc. with SmithGroup, Eppstein Uhen Architects in assoc. with Perkins&Will, Flad Architects, Hammel, Green and Abrahamson, Inc. |
Selected AE: |
Continuum Architects + Planners in assoc. with SmithGroup |
|
Project No.:
|
19I1L
|
Project Name: |
Winther Hall Addition & Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
Construction Cost: |
$31,411,000
|
AE Submittal Date: |
1/3/2020 2:30:00 PM |
Last Item Update: |
4/17/2020 1:28:45 PM |
AE Submitting Qualifications: |
Dorschner Associates, Inc. Hammel, Green, and Abrahamson, Inc. Plunkett Raysich Architects Somerville, Inc. Uihlein/Wilson - Ramlow/Stein Architects, Inc. Workshop Architects, Inc. Zimmerman Architectural Studios, Inc.
|
AE Shortlist: |
Hammel, Green, and Abrahamson, Inc., Plunkett Raysich Architects, Somerville, Inc. |
Selected AE: |
Somerville, Inc. |
|
Project No.:
|
19I1M
|
Project Name: |
Science and Technology Innovation Center
|
Institution: |
UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
|
Location: |
CITY OF RIVER FALLS, Wisconsin
|
Construction Cost: |
$81,556,000
|
AE Submittal Date: |
12/16/2019 2:30:00 PM |
Last Item Update: |
2/19/2020 10:13:37 AM |
AE Submitting Qualifications: |
Ayres Associates, Inc. in assoc. with Architectural Alliance International BWBR Architects, Inc. Continuum Architects + Planners in assoc. with Bohlin Cywinski Jackson Eppstein Uhen Architects in assoc. with Perkins & Will Flad Architects Hammel, Green, and Abrahamson, Inc. Plunkett Raysich Architects, LLP SDS Architects, Inc. in assoc. with HED Strang, Inc. in assoc. with CannonDesign
|
AE Shortlist: |
Ayres Associates, Inc. in assoc. with Architectural Alliance International, BWBR Architects, Inc., Continuum Architects + Planners in assoc. with Bohlin Cywinski Jackson, Eppstein Uhen Architects in assoc. with Perkins & Will |
Selected AE: |
BWBR Architects, Inc. |
|
Project No.:
|
19F2Y DESIGN BUILD
|
Project Name: |
Camp Randall Stadium Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
|
AE Submittal Date: |
12/10/2019 12:00:00 PM |
Last Item Update: |
2/4/2020 5:39:16 PM |
AE Shortlist: |
JP Cullen & Sons, Inc., Gilbane Building Company |
Selected AE: |
JP Cullen & Sons, Inc. |
|
Project No.:
|
19H1B
|
Project Name: |
Klotsche Center Annex Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$5,418,000
|
AE Submittal Date: |
11/18/2019 2:30:00 PM |
Last Item Update: |
2/13/2020 12:23:56 PM |
AE Submitting Qualifications: |
Hammel, Green, and Abrahamson, Inc. Uihlein/Wilson - Ramlow/Stein Architects, Inc. Zimmerman Architectural Studios, Inc.
|
AE Shortlist: |
Hammel, Green, and Abrahamson, Inc., Uihlein/Wilson - Ramlow/Stein Architects, Inc., Zimmerman Architectural Studios, Inc. |
Selected AE: |
Hammel, Green, and Abrahamson, Inc. |
|
Project No.:
|
19F3E
|
Project Name: |
Albertson Hall Replacement
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$62,753,000
|
AE Submittal Date: |
10/4/2019 2:30:00 PM |
Last Item Update: |
12/27/2019 8:29:43 AM |
AE Submitting Qualifications: |
Dorschner Associates, Inc. River Architects, Inc. Somerville, Inc. Strang, Inc. Workshop Architects, Inc. Zimmerman Architectural Studios, Inc.
|
AE Shortlist: |
River Architects, Inc., Strang, Inc., Workshop Architects, Inc. |
Selected AE: |
Workshop Architects, Inc. |
|
Project No.:
|
19G2Z
|
Project Name: |
Ventilation Improvements
|
Institution: |
CORRECTIONS/MILWAUKEE SECURE DETENTION FACILITY
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$6,534,000
|
AE Submittal Date: |
9/16/2019 2:30:00 PM |
Last Item Update: |
12/20/2019 12:52:22 PM |
AE Submitting Qualifications: |
Grumman/Butkus Associates, Ltd. Strang, Inc.
|
AE Shortlist: |
Grumman/Butkus Associates, Ltd., Strang, Inc. |
Selected AE: |
Grumman/Butkus Associates, Ltd. |
|
Project No.:
|
18K1G
|
Project Name: |
Readiness Center Replacement
|
Institution: |
MILITARY AFFAIRS/VIROQUA
|
Location: |
CITY OF VIROQUA, Wisconsin
|
Construction Cost: |
$17,333,000
|
AE Submittal Date: |
8/12/2019 2:30:00 PM |
Last Item Update: |
10/14/2019 11:33:35 AM |
AE Submitting Qualifications: |
Assemblage Architects Boer Architects, Inc. in assoc. with Bailey Edward Design
HSR Associates, Inc. I & S Group, Inc. Short Elliott Hendrickson, Inc. Tactical Design North, Inc. Venture Architects Wendel Architectural Resources, Inc.
|
AE Shortlist: |
Assemblage Architects, HSR Associates, Inc., Short Elliott Hendrickson, Inc., Venture Architects |
Selected AE: |
Assemblage Architects |
|
Project No.:
|
18L2V
|
Project Name: |
Student Union Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$27,848,000
|
AE Submittal Date: |
4/1/2019 2:30:00 PM |
Last Item Update: |
6/4/2019 3:36:27 PM |
AE Submitting Qualifications: |
Ayres Associates, Inc. Continuum Architects + Planners in assoc. with WTW Architects Hammel, Green and Abrahamson, Inc. Korb + Associates Architects in assoc. with Moody Nolan, Inc. Strang, Inc. in assoc. with Perkins + Will Workshop Architects, Inc.
|
AE Shortlist: |
Continuum Architects + Planners in assoc. with WTW Architects, Hammel, Green and Abrahamson, Inc., Workshop Architects, Inc. |
Selected AE: |
Hammel, Green and Abrahamson, Inc. |
|
Project No.:
|
18H2G
|
Project Name: |
Kohl Center Addition and Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$30,637,000
|
AE Submittal Date: |
3/18/2019 2:30:00 PM |
Last Item Update: |
5/17/2019 9:59:11 AM |
AE Submitting Qualifications: |
Berners-Schober Associates, Inc. Hammel, Green and Abrahamson, Inc. in assoc. with Perkins + Will Potter Lawson, Inc. Uihlein/Wilson - Ramlow/Stein Architects, Inc. in assoc. with SRG Partnership Venture Architects in assoc. with DLR Group, Inc.
|
AE Shortlist: |
Berners-Schober Associates, Inc., Hammel, Green and Abrahamson, Inc. in assoc. with Perkins + Will, Potter Lawson, Inc., Venture Architects in assoc. with DLR Group, Inc. |
Selected AE: |
Berners-Schober Associates, Inc. |
|
Project No.:
|
18H3E
|
Project Name: |
Gymnasium/Natatorium Replacement
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$72,580,000
|
AE Submittal Date: |
3/4/2019 2:30:00 PM |
Last Item Update: |
4/23/2019 10:53:31 AM |
AE Submitting Qualifications: |
Hammel, Green, and Abrahamson, Inc. in assoc. with Perkins +Will Kahler Slater, Inc. in assoc. with HOK Korb + Associates Architects in assoc. with CannonDesign Plunkett Raysich Architects in assoc. with Hughes Group Architects Potter Lawson, Inc. in assoc. with RDG Planning & Design Zimmerman Architectural Studios, Inc. in assoc. with Moody Nolan, Inc.
|
AE Shortlist: |
Hammel, Green, and Abrahamson, Inc. in assoc. with Perkins +Will, Kahler Slater, Inc. in assoc. with HOK, Potter Lawson, Inc. in assoc. with RDG Planning & Design |
Selected AE: |
Kahler Slater, Inc. in assoc. with HOK |
|
Project No.:
|
18H2H
|
Project Name: |
Veterinary Medicine Addition and Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$84,916,000
|
AE Submittal Date: |
2/25/2019 2:30:00 PM |
Last Item Update: |
4/18/2019 2:24:43 PM |
AE Submitting Qualifications: |
Eppstein Uhen Architects in assoc. with Perkins + Will Flad Architects in assoc. with Foil Wyatt Architects & Planners
|
AE Shortlist: |
Eppstein Uhen Architects in assoc. with with Perkins + Will, Flad Architects in assoc. with Foil Wyatt Architects & Planners |
Selected AE: |
Flad Architects in assoc. with Foil Wyatt Architects & Planners |
|
Project No.:
|
18K2M
|
Project Name: |
Juvenile Corrections Regional Facility
|
Institution: |
CORRECTIONS/VARIOUS
|
Location: |
Statewide, Wisconsin
|
Construction Cost: |
$23,970,100
|
AE Submittal Date: |
12/19/2018 2:30:00 PM |
Last Item Update: |
3/8/2019 11:20:52 AM |
AE Submitting Qualifications: |
BWBR Architects, Inc. Kehoe Henry & Associates, Inc. Potter Lawson, Inc. SDS Architects, Inc. i.a.w. Klein McCarthy Architects Venture Architects i.a.w. DLR Group, Inc.
|
AE Shortlist: |
BWBR Architects, Inc., Kehoe Henry & Associates, Inc., Venture Architects i.a.w. DLR Group, Inc. |
Selected AE: |
BWBR Architects, Inc. |
|
Project No.:
|
17I1K
|
Project Name: |
Old World Wisconsin Guest Entry Experience
|
Institution: |
HISTORICAL SOCIETY/OLD WORLD WISCONSIN ETHNIC OUTDOOR MUSEUM, EAGLE
|
Location: |
TOWN OF EAGLE, Wisconsin
|
Construction Cost: |
$3,911,300
|
AE Submittal Date: |
12/17/2018 2:30:00 PM |
Last Item Update: |
3/8/2019 11:09:48 AM |
AE Submitting Qualifications: |
Aro Eberle Architects Assemblage Architects Galbraith Carnahan Architects, LLC InSite Consulting Architects, LLC Isthmus Architecture, Inc. Kehoe Henry & Associates, Inc. LHB, Inc. Quorum Architects, Inc. Zimmerman Architectural Studios, Inc.
|
AE Shortlist: |
Aro Eberle Architects, Assemblage Architects, Zimmerman Architectural Studios, Inc. |
Selected AE: |
Aro Eberle Architects |
|
Project No.:
|
18G1J
|
Project Name: |
Appleton Readiness Center Additions and Renovation
|
Institution: |
MILITARY AFFAIRS/APPLETON
|
Location: |
CITY OF APPLETON, Wisconsin
|
Construction Cost: |
$15,253,000
|
AE Submittal Date: |
12/3/2018 2:30:00 PM |
Last Item Update: |
3/8/2019 11:10:07 AM |
AE Submitting Qualifications: |
Assemblage Architects Boer Architects, Inc. i.a.w. Bailey Edward Design, Inc. Mead & Hunt, Inc.
|
AE Shortlist: |
Assemblage Architects, Boer Architects, Inc. in assoc. with Bailey Edward Design, Inc., Mead & Hunt, Inc. |
Selected AE: |
Boer Architects, Inc. i.a.w. Bailey Edward Design, Inc. |
|
Project No.:
|
18H3D
|
Project Name: |
Chemistry Building Construction and Central Utilities Expansion
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$97,081,000
|
AE Submittal Date: |
11/2/2018 2:30:00 PM |
Last Item Update: |
12/20/2018 1:04:46 PM |
AE Submitting Qualifications: |
Bray Associates Architects, Inc. in assoc. with Holabird & Root, LLC Eppstein Uhen Architects in assoc. with ZGF Architects, LLP Flad Architects Hammel, Green, and Abrahamson, Inc. Kahler Slater, Inc. in assoc. with CannonDesign Perkins+Will in assoc. with Korb + Associates, Inc. Potter Lawson, Inc. Strang, Inc. in assoc. with Ballinger Zimmerman Architectural Studios, Inc.
|
AE Shortlist: |
Eppstein Uhen Architects in assoc. with ZGF Architects, LLP; Flad Architects; Hammel, Green, and Abrahamson, Inc.; Kahler Slater, Inc. in assoc. with CannonDesign |
Selected AE: |
Kahler Slater, Inc. in assoc. with CannonDesign |
|
Project No.:
|
18F1Y
|
Project Name: |
Mendota Juvenile Treatment Center Expansion
|
Institution: |
HEALTH SERVICES/MENDOTA MENTAL HEALTH INSTITUTE, MADISON
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$39,166,000
|
AE Submittal Date: |
10/23/2018 2:30:00 PM |
Last Item Update: |
12/19/2018 7:43:25 AM |
AE Submitting Qualifications: |
BWBR, Inc. Venture Architects i.a.w. DLR Group, Inc.
|
AE Shortlist: |
BWBR, Inc., Venture Architects i.a.w. DLR Group, Inc. |
Selected AE: |
BWBR, Inc. |
|
Project No.:
|
18C2E- R
|
Project Name: |
Milwaukee State Office Building
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$108,000,000
|
AE Submittal Date: |
8/16/2018 3:00:00 PM |
Last Item Update: |
10/15/2018 9:54:07 AM |
AE Submitting Qualifications: |
Continuum Architects + Planners i.a.w. SmithGroup Eppstein Uhen Architects i.a.w. McClaren, Wilson & Lawrie, Inc. Hammel Green & Abrahamson, Inc. i.a.w. McClaren, Wilson & Lawrie, Inc. Korb + Associates Architects i.a.w. Harley Ellis Devereaux/Crime Lab Design Plunkett Raysich Architects, LLP i.a.w. HKS, Inc. Strang, Inc. i.a.w. McClaren, Wilson & Lawrie, Inc. Venture Architects i.a.w. HOK
|
AE Shortlist: |
Continuum Architects + Planners i.a.w. SmithGroup, Eppstein Uhen Architects i.a.w. McClaren, Wilson & Lawrie, Inc., Strang, Inc. i.a.w. McClaren, Wilson & Lawrie, Inc., Venture Architects i.a.w. HOK |
Selected AE: |
Continuum Architects + Planners i.a.w. SmithGroup |
|
Project No.:
|
18E2P
|
Project Name: |
Governors Hall Addition and Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
|
Location: |
CITY OF EAU CLAIRE, Wisconsin
|
Construction Cost: |
$15,774,000
|
AE Submittal Date: |
7/17/2018 2:30:00 PM |
Last Item Update: |
9/18/2018 11:58:51 AM |
AE Submitting Qualifications: |
Assemblage Architects Engberg Anderson, Inc. Hammel Green & Abrahamson, Inc. Lien & Peterson Architects, Inc. Mead & Hunt, Inc. SDS Architects, Inc. Somerville, Inc.
|
AE Shortlist: |
Engberg Anderson, Inc., Hammel Green & Abrahamson, Inc., Mead & Hunt, Inc., SDS Architects, Inc. |
Selected AE: |
SDS Architects, Inc. |
|
Project No.:
|
18C2F
|
Project Name: |
Southeast Regional Headquarters Renovation
|
Institution: |
NATURAL RESOURCES/SOUTHEASTERN REGION HDQRTS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$10,900,000
|
AE Submittal Date: |
5/22/2018 2:30:00 PM |
Last Item Update: |
7/27/2018 4:20:29 PM |
AE Submitting Qualifications: |
Engberg Anderson, Inc. Hammel Green & Abrahamson, Inc. Korb + Associates Architects LHB, Inc. Mayer Helminiak Architects LLC Plunkett Raysich Architects Quorum Architects, Inc. Uihlein/Wilson - Ramlow/Stein Architects, Inc. Zimmerman Architectural Studios, Inc.
|
AE Shortlist: |
Hammel Green & Abrahamson, Inc., Quorum Architects, Inc., Uihlein/Wilson-Ramlow/Stein Architects, Inc., Zimmerman Architectural Studios, Inc. |
Selected AE: |
Uihlein/Wilson-Ramlow/Stein Architects, Inc. |
|
Project No.:
|
18A2P
|
Project Name: |
Inmate Programs Building
|
Institution: |
CORRECTIONS/Wisconsin Secure Program Facility
|
Location: |
CITY OF BOSCOBEL, Wisconsin
|
Construction Cost: |
$6,737,000
|
AE Submittal Date: |
5/1/2018 2:30:00 PM |
Last Item Update: |
7/13/2018 12:33:17 PM |
AE Submitting Qualifications: |
Kehoe-Henry & Associates Inc. Mead & Hunt, Inc. in assoc. with HDR Architecture, Inc. Venture Architects
|
AE Shortlist: |
Kehoe-Henry & Associates Inc., Mead & Hunt, Inc. in assoc. with HDR Architecture, Inc., Venture Architects |
Selected AE: |
Mead & Hunt, Inc. in assoc. with HDR Architecture, Inc. |
|
Project No.:
|
17J2L
|
Project Name: |
Lathrop Drive-Bascom Hill Utility Repairs
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$26,439,000
|
AE Submittal Date: |
4/24/2018 2:30:00 PM |
Last Item Update: |
6/22/2018 2:04:39 PM |
AE Submitting Qualifications: |
Affiliated Engineers, Inc. Ring & DuChateau, LLP
|
AE Shortlist: |
Affiliated Engineers, Inc., Ring & DuChateau, LLP |
Selected AE: |
Ring & DuChateau, LLP |
|
Project No.:
|
18C2E
|
Project Name: |
Milwaukee State Office Building
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$43,000,000
|
AE Submittal Date: |
4/17/2018 2:30:00 PM |
Last Item Update: |
1/25/2022 1:08:42 PM |
AE Submitting Qualifications: |
This Selection has been amended and replaced by A/E Services Request dated August 2018 (18C2E- R) |
|
Project No.:
|
17D2P
|
Project Name: |
Readiness Center Renovation Phase II
|
Institution: |
MILITARY AFFAIRS/MILWAUKEE
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$4,940,000
|
AE Submittal Date: |
3/20/2018 2:30:00 PM |
Last Item Update: |
5/8/2018 1:42:14 PM |
AE Submitting Qualifications: |
Assemblage Architects Ayres Associates Inc. Boer Architects Inc. Groth Design Group Inc. Mead & Hunt, Inc.
|
AE Shortlist: |
Assemblage Architects, Boer Architects Inc., Mead & Hunt, Inc. |
Selected AE: |
Boer Architects Inc. |
|
Project No.:
|
17I1F
|
Project Name: |
Linden Drive Parking Garage
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$19,200,000
|
AE Submittal Date: |
2/7/2018 2:30:00 PM |
Last Item Update: |
4/5/2018 1:16:20 PM |
AE Submitting Qualifications: |
GRAEF Harwood Engineering Consultants, Ltd. Potter Lawson Inc. R.A. Smith, Inc. SRF Consulting Group Inc.
|
AE Shortlist: |
GRAEF, Harwood Engineering Consultants, Ltd., Potter Lawson Inc., R.A. Smith, Inc. |
Selected AE: |
Potter Lawson Inc. |
|
Project No.:
|
17H1X
|
Project Name: |
Sesquicentennial Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
|
Location: |
CITY OF PLATTEVILLE, Wisconsin
|
Construction Cost: |
$41,795,000
|
AE Submittal Date: |
1/16/2018 2:30:00 PM |
Last Item Update: |
3/2/2018 3:01:54 PM |
AE Submitting Qualifications: |
BWBR Architects Inc, Eppstein Uhen Architects iaw ZGF, Flad Architects, Hammel Green & Abrahamson Inc, Potter Lawson Inc, River Architects Inc, Strang Inc, Zimmerman Architectural Studios Inc
|
AE Shortlist: |
BWBR Architects Inc, Flad Architects, Hammel Green & Abrahamson Inc, River Architects Inc |
Selected AE: |
BWBR Architects Inc. |
|
Project No.:
|
17E1Q
|
Project Name: |
Wyllie Hall Renovation, Phase 1
|
Institution: |
UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
|
Location: |
TOWN OF SOMERS, Wisconsin
|
Construction Cost: |
$25,120,000
|
AE Submittal Date: |
11/20/2017 2:30:00 PM |
Last Item Update: |
1/31/2018 2:27:42 PM |
AE Submitting Qualifications: |
Angus Young Associates Inc. i.a.w. Demonica Kemper Architects Assemblage Architects BWZ Architects i.a.w. Holabird & Root Engberg Anderson Inc. i.a.w. Gensler Hammel Green & Abrahamson Inc. Plunkett Raysich Architects Strang Inc. Workshop Architects Inc.
|
AE Shortlist: |
Hammel Green & Abrahamson, Inc., Plunkett Raysich Architects, LLP, Workshop Architects, Inc. |
Selected AE: |
Workshop Architects, Inc. |
|
Project No.:
|
12J1K R
|
Project Name: |
Boebel Hall Addition and Renovation Phase II
|
Institution: |
UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
|
Location: |
CITY OF PLATTEVILLE, Wisconsin
|
Construction Cost: |
$19,885,000
|
AE Submittal Date: |
10/31/2017 2:30:00 PM |
Last Item Update: |
12/20/2017 9:58:07 AM |
AE Submitting Qualifications: |
Aro Eberle Architects Assemblage Architects i.a.w. Architectural Alliance International BWBR Architects, Inc. Continuum Architects + Planners Eppstein Uhen Architects Perkins+Will i.a.w. I & S Group Plunkett Raysich Architects River Architects, Inc. Strang, Inc.
|
AE Shortlist: |
Aro Eberle Architects, BWBR Architects, Inc, Continuum Architects + Planners, River Architects, Inc. |
Selected AE: |
Continuum Architects + Planners |
|
Project No.:
|
17E2E
|
Project Name: |
Utility Corridor Improvement & Chiller Upgrade
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
Construction Cost: |
$22,342,000
|
AE Submittal Date: |
7/20/2017 2:30:00 PM |
Last Item Update: |
9/21/2017 10:11:18 AM |
AE Submitting Qualifications: |
Affiliated Engineers, Inc. Hammel Green & Abrahamson, Inc. Henneman Engineering, Inc. MEP Associates, LLC Ring & DuChateau, LLP
|
AE Shortlist: |
Affiliated Engineers, Inc., Henneman Engineering, Inc., Ring & DuChateau, LLP |
Selected AE: |
Ring & DuChateau, LLP |
|
Project No.:
|
16A1T
|
Project Name: |
Champions Hall Addition and Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$35,431,000
|
AE Submittal Date: |
6/13/2017 2:30:00 PM |
Last Item Update: |
9/22/2017 8:27:48 AM |
AE Submitting Qualifications: |
Angus Young Associates, Inc. i.a.w. GMB Architecture + Engineering Berners Schober Associates, Inc. i.a.w. HOK Bray Associates Architects, Inc. i.a.w. CannonDesign BWBR Architects, Inc. i.a.w. Dewberry Continuum Architects & Planners i.a.w. RDG Planning & Design Gensler i.a.w. American Design, Inc. Kahler Slater, Inc. River Architects, Inc. i.a.w. SmithGroupJJR SDS Architects, Inc. Somerville, Inc.
|
AE Shortlist: |
Berners Schober Associates, Inc. i.a.w. HOK, BWBR Architects, Inc. i.a.w. Dewberry, Continuum Architects & Planners i.a.w. RDG Planning & Design, Kahler Slater, Inc. |
Selected AE: |
Kahler Slater, Inc. |
|
Project No.:
|
17C1U
|
Project Name: |
MMHI Heating Plant Boiler Replacement
|
Institution: |
HEALTH SERVICES/MENDOTA MENTAL HEALTH INSTITUTE, MADISON
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$4,400,000
|
AE Submittal Date: |
6/5/2017 2:30:00 PM |
Last Item Update: |
8/25/2017 2:28:43 PM |
AE Submitting Qualifications: |
Affiliated Engineers Inc. Hammel Green & Abrahamson Inc. I & S Group, Inc.
|
AE Shortlist: |
Affiliated Engineers Inc., Hammel Green & Abrahamson Inc., I & S Group, Inc. |
Selected AE: |
I & S Group, Inc. |
|
Project No.:
|
17B1O
|
Project Name: |
MIL NWQ Renovation & Student Health Services Remodel
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$47,405,000
|
AE Submittal Date: |
5/9/2017 2:30:00 PM |
Last Item Update: |
8/14/2017 11:06:59 AM |
AE Submitting Qualifications: |
Assemblage Architects Bray Associates Architects, Inc. i.a.w. Gensler Continuum Architects & Planners S C Hammel Green & Abrahamson Inc. James G. Otto Architect, LLC i.a.w. Perkins+Will Kahler Slater Inc. OPN Architects, Inc. i.a.w. The S/L/A/M Collaborative Strang Inc. Uihlein Wilson Architects Inc. i.a.w. Moody Nolan
|
AE Shortlist: |
Continuum Architects & Planners, HGA, Inc., Kahler Slater, Inc. |
Selected AE: |
Kahler Slater, Inc. |
|
Project No.:
|
16L1U
|
Project Name: |
Sandburg Residence Hall Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$27,170,000
|
AE Submittal Date: |
4/25/2017 2:30:00 PM |
Last Item Update: |
7/7/2017 2:34:04 PM |
AE Submitting Qualifications: |
Assemblage Architects Engberg Anderson, Inc. Eppstein Uhen Architects Mayer Helminiak Architects, LLC Quorum Architects, Inc.
|
AE Shortlist: |
Assemblage Architects, Engberg Anderson, Inc., Mayer Helminiak Architects, LLC, Quorum Architects, Inc. |
Selected AE: |
Engberg Anderson, Inc. |
|
Project No.:
|
16G1S
|
Project Name: |
Kettle Moraine Springs Hatchery Renovation
|
Institution: |
NATURAL RESOURCES/KETTLE MORAINE HATCHERY
|
Location: |
TOWN OF SCOTT, Wisconsin
|
Construction Cost: |
$20,138,000
|
AE Submittal Date: |
11/15/2016 2:30:00 PM |
Last Item Update: |
1/4/2017 11:47:46 AM |
AE Submitting Qualifications: |
MSA Professional Services Inc
|
AE Shortlist: |
MSA Professional Services Inc |
Selected AE: |
MSA Professional Services Inc |
|
Project No.:
|
14I2R
|
Project Name: |
May Roach Hall and Smith Hall Renovations
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$14,465,000
|
AE Submittal Date: |
10/11/2016 2:30:00 PM |
Last Item Update: |
1/5/2017 8:11:33 AM |
AE Submitting Qualifications: |
Assemblage Architects Engberg Anderson Inc. Korb + Associates Architects Mead & Hunt, Inc. SDS Architects Inc Somerville, Inc.
|
AE Shortlist: |
Assemblage Architects, Engberg Anderson Inc, SDS Architects Inc, Somerville Inc. |
Selected AE: |
Somerville Inc. |
|
Project No.:
|
15I1D
|
Project Name: |
Construct Health Services Unit
|
Institution: |
CORRECTIONS/RACINE CORRECTIONAL INSTITUTION, STURTEVANT
|
Location: |
VILLAGE OF STURTEVANT, Wisconsin
|
Construction Cost: |
$6,267,000
|
AE Submittal Date: |
8/9/2016 2:30:00 PM |
Last Item Update: |
10/26/2016 2:15:07 PM |
AE Submitting Qualifications: |
Kehoe Henry & Associates Inc. Potter Lawson Inc. Venture Architects
|
AE Shortlist: |
Kehoe Henry & Associates Inc, Potter Lawson Inc, Venture Architects |
Selected AE: |
Venture Architects |
|
Project No.:
|
15I2I
|
Project Name: |
Fieldhouse and Soccer Support Facility
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$26,487,000
|
AE Submittal Date: |
7/12/2016 2:30:00 PM |
Last Item Update: |
9/30/2016 3:18:46 PM |
AE Submitting Qualifications: |
Ayres Associates Inc i.a.w. Hastings+Chivetta, Bray Associates Architects Inc i.a.w. Gensler, Continuum Architects & Planners S C i.a.w. CannonDesign, HSR Associates Inc i.a.w. RDG Planning & Design, Kahler Slater Inc, Potter Lawson Inc, River Architects Inc i.a.w. HOK, SDS Architects Inc, Venture Architects i.a.w. Moody Nolan
|
AE Shortlist: |
HSR Associates Inc iaw RDG Planning & Design, Kahler Slater Inc, SDS Architects Inc |
Selected AE: |
HSR Associates Inc iaw RDG Planning & Design |
|
Project No.:
|
15K1F
|
Project Name: |
South Campus Utility Improvements
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$12,486,000
|
AE Submittal Date: |
6/16/2016 2:30:00 PM |
Last Item Update: |
10/26/2016 2:15:49 PM |
AE Submitting Qualifications: |
Affiliated Engineers Inc, Burns & McDonnell, Henneman Engineering Inc, Ring & DuChateau, LLP, Sebesta, Inc.
|
AE Shortlist: |
Affiliated Engineers Inc, Henneman Engineering Inc, Ring & DuChateau, LLP, Sebesta, Inc. |
Selected AE: |
Affiliated Engineers Inc. |
|
Project No.:
|
16D1I
|
Project Name: |
Little Falls Dam Reconstruction
|
Institution: |
NATURAL RESOURCES/WILLOW RIVER STATE PARK
|
Location: |
TOWN OF HUDSON, Wisconsin
|
Construction Cost: |
$6,724,800
|
AE Submittal Date: |
5/24/2016 2:30:00 PM |
Last Item Update: |
7/18/2016 2:03:25 PM |
AE Submitting Qualifications: |
AECOM USA, Inc. Ayres Associates Inc Mead & Hunt, Inc.
|
AE Shortlist: |
AECOM USA, Inc., Ayres Associates Inc, Mead & Hunt, Inc. |
Selected AE: |
Mead & Hunt, Inc. |
|
Project No.:
|
15I1B
|
Project Name: |
Price Commons First Floor Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
Construction Cost: |
$5,052,000
|
AE Submittal Date: |
3/3/2016 2:30:00 PM |
Last Item Update: |
6/21/2016 12:16:01 PM |
AE Submitting Qualifications: |
Ayres Associates Inc Groth Design Group Inc Lien & Peterson Architects, Inc SDS Architects Inc
|
AE Shortlist: |
Ayres Associates Inc, Groth Design Group Inc, Lien & Peterson Architects, Inc, SDS Architects Inc |
Selected AE: |
Lien & Peterson Architects, Inc |
|
Project No.:
|
15I1A
|
Project Name: |
1 West Wilson Comprehensive Fire Protection Retrofit
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$4,221,600
|
AE Submittal Date: |
2/16/2016 2:30:00 PM |
Last Item Update: |
6/21/2016 12:11:26 PM |
AE Submitting Qualifications: |
Assemblage Architects CMG & Associates Inc
|
AE Shortlist: |
Assemblage Architects, CMG & Associates Inc |
Selected AE: |
CMG & Associates Inc |
|
Project No.:
|
15F2A
|
Project Name: |
DeBot Dining Center Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$12,741,000
|
AE Submittal Date: |
2/8/2016 2:30:00 PM |
Last Item Update: |
4/28/2016 3:43:51 PM |
AE Submitting Qualifications: |
Ayres Associates Inc Engberg Anderson Inc Groth Design Group Inc SDS Architects Inc Strang Inc
|
AE Shortlist: |
Ayres Associates Inc., Engberg Anderson Inc., SDS Architects Inc. |
Selected AE: |
SDS Architects Inc. |
|
Project No.:
|
15K2E
|
Project Name: |
New Residence Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
Construction Cost: |
$26,394,000
|
AE Submittal Date: |
1/15/2016 2:30:00 PM |
Last Item Update: |
4/11/2016 1:45:48 PM |
AE Submitting Qualifications: |
Angus Young Associates Inc in association with Cannon Design BWBR Architects, Inc. BWZ Architects Engberg Anderson Inc. Eppstein Uhen Architects Korb + Associates Architects Mead & Hunt, Inc. Potter Lawson Inc. SDS Architects Inc. Uihlein Wilson Architects Inc.
|
AE Shortlist: |
BWBR Architects, Inc., Engberg Anderson Inc., Eppstein Uhen Architects |
Selected AE: |
Eppstein Uhen Architects |
|
Project No.:
|
15F2Q
|
Project Name: |
Milwaukee Readiness Center Renovation - Phase 1
|
Institution: |
MILITARY AFFAIRS/MILWAUKEE
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$4,821,200
|
AE Submittal Date: |
11/16/2015 2:30:00 PM |
Last Item Update: |
2/29/2016 8:30:58 AM |
AE Submitting Qualifications: |
Assemblage Architects HSR Associates Inc Mead & Hunt, Inc. Venture Architects
|
AE Shortlist: |
Assemblage Architects, HSR Associates Inc., Mead & Hunt, Inc., Venture Architects |
Selected AE: |
Mead & Hunt, Inc. |
|
Project No.:
|
14J2W
|
Project Name: |
North Hall Renovation and Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
TOWN OF MENOMONIE, Wisconsin
|
Construction Cost: |
$12,649,000
|
AE Submittal Date: |
11/13/2015 2:30:00 PM |
Last Item Update: |
2/29/2016 8:31:47 AM |
AE Submitting Qualifications: |
Angus Young Associates Inc Architectural Design Group LLC in association with LHB, Inc. Assemblage Architects BWBR Architects, Inc. Engberg Anderson Inc Kindness Architecture & Planning in association with Mead & Hunt Korb Tredo Architects Inc Lien & Peterson Architects, Inc SDS Architects Inc Somerville, Inc.
|
AE Shortlist: |
BWBR Architects, Inc., Engberg Anderson Inc., Lien & Peterson Architects Inc., SDS Architects Inc. |
Selected AE: |
BWBR Architects, Inc. |
|
Project No.:
|
14K1G
|
Project Name: |
PLT Williams Fieldhouse Addition, Phase II
|
Institution: |
UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
|
Location: |
TOWN OF PLATTEVILLE, Wisconsin
|
Construction Cost: |
$12,079,000
|
AE Submittal Date: |
9/24/2015 2:30:00 PM |
Last Item Update: |
12/15/2015 12:51:48 PM |
AE Submitting Qualifications: |
American Design Inc Angus Young Associates Inc w/ GMB Architecture + Engineering Berners Schober Associates Inc Bray Associates Architects, Inc Groth Design Group Inc w/ BBLD Architects, Inc. HSR Associates Inc Kahler Slater Inc KEE Architecture Inc SDS Architects Inc Venture Architects
|
AE Shortlist: |
American Design, Kahler Slater, KEE Architecture, Inc., SDS Architects |
Selected AE: |
Kahler Slater |
|
Project No.:
|
14I2B
|
Project Name: |
Recreational Eagles Center Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$6,936,000
|
AE Submittal Date: |
9/17/2015 2:30:00 PM |
Last Item Update: |
12/15/2015 12:52:24 PM |
AE Submitting Qualifications: |
Berners Schober Associates Inc HSR Associates Inc KEE Architecture Inc SDS Architects Inc
|
AE Shortlist: |
Berners Schober Associates Inc, HSR Associates Inc, KEE Architecture Inc, SDS Architects Inc |
Selected AE: |
SDS Architects, Inc. |
|
Project No.:
|
15F1T
|
Project Name: |
Bowman Hall - Exterior Envelope Maintenance and Repair
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
Construction Cost: |
$6,843,000
|
AE Submittal Date: |
9/11/2015 2:30:00 PM |
Last Item Update: |
12/15/2015 12:53:12 PM |
AE Submitting Qualifications: |
Ayres Associates Inc Bloom Companies LLC in association with James G. Otto Architect, LLC InSite Consulting Architects, LLC LHB Inc Mead & Hunt, Inc. in association with Isthmus Architecture, Inc. River Architects Inc Specialty Engineering Group LLC Ziad Salameh LLC (ZSLLC)
|
AE Shortlist: |
Bloom Companies LLC in association with James G. Otto Architect, LLC, Mead & Hunt, Inc. in association with Isthmus Architecture, Inc., Specialty Engineering Group LLC |
Selected AE: |
Mead & Hunt, Inc. in association with Isthmus Architecture, Inc. |
|
Project No.:
|
14L2T
|
Project Name: |
Southeast Recreational Facility Replacement
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$68,783,000
|
AE Submittal Date: |
7/10/2015 2:30:00 PM |
Last Item Update: |
9/23/2015 12:54:48 PM |
AE Submitting Qualifications: |
Berners Schober Associates Inc. in association with Hughes Group Architects Continuum Architects & Planners S C in association with Moody Nolan Engberg Anderson Inc. in association with Gensler Kahler Slater Inc. in association with RDG Planning and Design, Inc. SDS Architects Inc. in association with HKS Architects, Inc. Strang Inc. in association with Hastings + Chivetta Workshop Architects Inc. in association with HOK Zimmerman Architectural Studios Inc. in association with Cannon Design
|
AE Shortlist: |
Berners Schober Associates i.a.w. Hughes Group Architects; Kahler Slater i.a.w. RDG Planning and Design, Inc.; Workshop Architects i.a.w. HOK |
Selected AE: |
Workshop Architects in assocation with HOK |
|
Project No.:
|
14H1Z
|
Project Name: |
Towers Hall Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
|
Location: |
CITY OF EAU CLAIRE, Wisconsin
|
Construction Cost: |
$26,670,000
|
AE Submittal Date: |
5/22/2015 2:30:00 PM |
Last Item Update: |
8/5/2015 1:18:30 PM |
AE Submitting Qualifications: |
Engberg Anderson Inc Eppstein Uhen Architects SDS Architects Inc
|
AE Shortlist: |
Engberg Anderson Inc., Eppstein Uhen Architects, SDS Architects Inc. |
Selected AE: |
Eppstein Uhen Architects |
|
Project No.:
|
14I2O
|
Project Name: |
Wittich Hall Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$16,917,000
|
AE Submittal Date: |
5/15/2015 2:30:00 PM |
Last Item Update: |
8/5/2015 1:54:37 PM |
AE Submitting Qualifications: |
Angus Young Associates Inc. Aro Eberle Architects BWBR Architects, Inc. Dorschner Associates Inc. Engberg Anderson Inc. HSR Associates Inc. Mayer Helminiak Architects LLC. Strang Inc.
|
AE Shortlist: |
Aro Eberle Architects, BWBR Architects, Inc., HSR Associates Inc. |
Selected AE: |
Aro Eberle Architects |
|
Project No.:
|
14A2N
|
Project Name: |
John R. Moses Skilled Nursing Facility
|
Institution: |
VETERANS AFFAIRS/WISCONSIN VETERANS HOME-KING
|
Location: |
TOWN OF FARMINGTON, Wisconsin
|
Construction Cost: |
$60,974,000
|
AE Submittal Date: |
3/25/2015 2:30:00 PM |
Last Item Update: |
7/1/2015 10:34:47 AM |
AE Submitting Qualifications: |
Abacus Architects Inc. in association with SFCS Inc. Berners Schober Associates Inc. in association with Harley, Ellis, Deveraux BWBR Architects, Inc. Engberg Anderson Inc. in association with Horty Elving Eppstein Uhen Architects Korb Tredo Architects Inc, in association with Perkins Eastman Plunkett Raysich Architects Strang Inc. in association with Nelson-Tremain Partnership
|
AE Shortlist: |
Berners Schober Associates Inc. in association with Harley, Ellis, Deveraux; Engberg Anderson Inc. in association with Horty Elving; Eppstein Uhen Architects |
Selected AE: |
Eppstein Uhen Architects |
|
Project No.:
|
14F3J
|
Project Name: |
Segregation Unit Expansion
|
Institution: |
CORRECTIONS/COLUMBIA CORRECTIONAL INSTITUTION, PORTAGE
|
Location: |
CITY OF PORTAGE, Wisconsin
|
Construction Cost: |
$4,610,000
|
AE Submittal Date: |
3/6/2015 2:30:00 PM |
Last Item Update: |
6/3/2015 1:41:37 PM |
AE Submitting Qualifications: |
BWBR Architects, Inc. Kehoe Henry & Associates Inc. Venture Architects
|
AE Shortlist: |
BWBR Architects, Inc., Kehoe Henry & Associates Inc., Venture Architects |
Selected AE: |
Venture Architects |
|
Project No.:
|
14I3Y
|
Project Name: |
MIL New Welcome Center and Center for Entrepreneurship
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$6,211,000
|
AE Submittal Date: |
1/16/2015 2:30:00 PM |
Last Item Update: |
4/14/2015 3:39:57 PM |
AE Submitting Qualifications: |
Bray Associates Architects, Inc Continuum Architects & Planners S C Engberg Anderson Inc Flad Architects Groth Design Group Inc Hammel Green & Abrahamson Inc KEE Architecture Inc Kindness Architecture & Planning Korb Tredo Architects Inc Mayer Helminiak Architects LLC Plunkett Raysich Architects Renner Architects LLC Rinka Chung Architecture Inc Somerville, Inc. The Kubala Washatko Architects, Inc. Uihlein Wilson Architects Inc
|
AE Shortlist: |
Continuum Architects & Planners SC, KEE Architecture Inc, Plunkett Raysich Architects, The Kubala Washatko Architects, Inc. |
Selected AE: |
Continuum Architects & Planners SC |
|
Project No.:
|
14H3H
|
Project Name: |
Near West Playfields Upgrade
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$5,414,000
|
AE Submittal Date: |
1/16/2015 2:30:00 PM |
Last Item Update: |
4/14/2015 1:04:49 PM |
AE Submitting Qualifications: |
General Engineering Company GRAEF I&S Group, Inc. Rettler Corporation SmithGroupJJR
|
AE Shortlist: |
GRAEF, Rettler Corporation, SmithGroupJJR |
Selected AE: |
SmithGroupJJR |
|
Project No.:
|
14E2O
|
Project Name: |
Witte Residence Hall Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$38,089,000
|
AE Submittal Date: |
10/29/2014 2:30:00 PM |
Last Item Update: |
1/13/2015 1:55:36 PM |
AE Submitting Qualifications: |
Engberg Anderson Inc Henneman Engineering Inc (Madison, WI & Champaign, IL) Korb Tredo Architects Inc in association with VOA Associates SDS Architects Inc. in association with ESG Architects, Inc. Uihlein Wilson Architects Inc
|
AE Shortlist: |
Engberg Anderson Inc.; SDS Architects Inc. in association with ESG Architects, Inc.; Uihlein Wilson Architects Inc. |
Selected AE: |
Uihlein Wilson Architects Inc. |
|
Project No.:
|
12K1L
|
Project Name: |
Garfield Avenue Corridor Improvements
|
Institution: |
UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
|
Location: |
CITY OF EAU CLAIRE, Wisconsin
|
Construction Cost: |
$9,712,000
|
AE Submittal Date: |
9/18/2014 2:30:00 PM |
Last Item Update: |
12/4/2014 4:43:13 PM |
AE Submitting Qualifications: |
Ayres Associates Inc. MSA Professional Services Inc. Short Elliott Hendrickson Inc. Strand Associates Inc.
|
AE Shortlist: |
Ayres Associates Inc., MSA Professional Services Inc., Short Elliott Hendrickson Inc. |
Selected AE: |
Ayres Associates Inc. |
|
Project No.:
|
13F2B
|
Project Name: |
MIL Integrated Research Center at Innovation Park
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF WAUWATOSA, Wisconsin
|
Construction Cost: |
$58,500,000
|
AE Submittal Date: |
8/14/2014 2:30:00 PM |
Last Item Update: |
11/5/2014 11:56:26 AM |
AE Submitting Qualifications: |
Berners Schober Associates Inc in assocation with Harley Ellis Devereaux Continuum Architects & Planners S C in assocation with Cannon Design Engberg Anderson Inc in assocation with Skidmore Owings & and Merrill LLP Eppstein Uhen Architects in assocation with ZGF Architects LLP Flad Architects Hammel Green & Abrahamson Inc in assocation with Perkins + Will Kahler Slater Inc in assocation with Lord Aeck and Sargent, Inc. Uihlein Wilson Architects Inc Zimmerman Architectural Studios Inc
|
AE Shortlist: |
Continuum Architects & Planners S C in assocation with Cannon Design; Eppstein Uhen Architects in assocation with ZGF Architects LLP; Flad Architects; Kahler Slater Inc in assocation with Lord Aeck and Sargent, Inc. |
Selected AE: |
Eppstein Uhen Architects (Milwaukee, WI) in assocation with ZGF Architects LLP |
|
Project No.:
|
13K3E
|
Project Name: |
Health Services Unit Expansion
|
Institution: |
CORRECTIONS/OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$5,887,000
|
AE Submittal Date: |
8/12/2014 2:30:00 PM |
Last Item Update: |
11/13/2014 2:42:24 PM |
AE Submitting Qualifications: |
Angus Young Associates Inc. BWBR Architects, Inc. Mead & Hunt, Inc. Somerville, Inc. Venture Architects
|
AE Shortlist: |
BWBR Architects, Inc.; Somerville, Inc.; Venture Architects |
Selected AE: |
BWBR Architects, Inc. |
|
Project No.:
|
13L2I
|
Project Name: |
Lorenz Hall Secure Treatment Unit Renovation
|
Institution: |
HEALTH SERVICES/MENDOTA MENTAL HEALTH INSTITUTE, MADISON
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$4,279,000
|
AE Submittal Date: |
8/6/2014 2:30:00 PM |
Last Item Update: |
11/5/2014 12:02:23 PM |
AE Submitting Qualifications: |
Dorschner Associates Inc Engberg Anderson Inc in association with Horty Elving Mead & Hunt, Inc Venture Architects
|
AE Shortlist: |
Dorschner Associates Inc; Engberg Anderson Inc in assocation with Horty Elving; Mead & Hunt, Inc; Venture Architects |
Selected AE: |
Dorschner Associates Inc. (Madison, WI) |
|
Project No.:
|
13B3G
|
Project Name: |
Chemistry Building Addition and Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$85,130,000
|
AE Submittal Date: |
4/21/2014 2:30:00 PM |
Last Item Update: |
11/5/2014 11:58:37 AM |
AE Submitting Qualifications: |
Berners Schober Associates Inc in association with Harley Ellis Devereaux BWBR Architects, Inc. Continuum Architects & Planners S C in association with Cannon Design Dorschner Associates Inc in association with BSA Life Structures Eppstein Uhen Architects in association with ZGF Architects Flad Architects Plunkett Raysich Architects in association with CO Architects Strang Inc in assocation with Ballinger Uihlein Wilson Architects Inc in assocation with Ellenzweig Zimmerman Architectural Studios Inc
|
AE Shortlist: |
BWBR Architects; Continuum Architects & Planners S C in association with Cannon Design; Eppstein Uhen Architects in association with ZGF Architects; Strang Inc in assocation with Ballinger |
Selected AE: |
Strang Inc. (Madison, WI) in assocation with Ballinger |
|
Project No.:
|
13F3H
|
Project Name: |
Health Services Unit
|
Institution: |
CORRECTIONS/COLUMBIA CORRECTIONAL INSTITUTION, PORTAGE
|
Location: |
CITY OF PORTAGE, Wisconsin
|
Construction Cost: |
$4,773,000
|
AE Submittal Date: |
3/28/2014 2:30:00 PM |
Last Item Update: |
11/5/2014 12:03:04 PM |
AE Submitting Qualifications: |
BWBR Architects, Inc. Mead & Hunt, Inc. Venture Architects
|
AE Shortlist: |
BWBR Architects, Inc.; Mead & Hunt, Inc.; Venture Architects; |
Selected AE: |
Venture Architects (Milwaukee, WI) |
|
Project No.:
|
13I2Y
|
Project Name: |
Meat Science and Muscle Biology Laboratory
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$28,413,000
|
AE Submittal Date: |
3/20/2014 2:30:00 PM |
Last Item Update: |
11/5/2014 11:59:34 AM |
AE Submitting Qualifications: |
Aro Eberle Architects Assemblage Architects in assocation with Architectural Alliance International Berners Schober Associates Inc in association with Harley Ellis Devereaux Flad Architects Potter Lawson Inc Strang Inc Zimmerman Architectural Studios Inc
|
AE Shortlist: |
Aro Eberle Architects; Flad Architects; Potter Lawson Inc; Zimmerman Architectural Studios Inc |
Selected AE: |
Potter Lawson Inc. (Madison, WI) |
|
Project No.:
|
13A1O
|
Project Name: |
Reeve Union Entrance and Expansion
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$5,624,000
|
AE Submittal Date: |
1/17/2014 2:30:00 PM |
Last Item Update: |
11/5/2014 12:11:44 PM |
AE Submitting Qualifications: |
Aro Eberle Architects
Assemblage Architects
Berners Schober Associates
Bloom Companies, LLC in association with James G. Otto Architect, LLC
Boer Architects, Inc.
Groth Design Group, Inc.
Engberg Anderson
Dorschner|Associates, Inc.
HGM Architecture, Inc.
I&S Group, Inc.
KEE Architecture, Inc.
Korb Tredo Architects, Inc.
MartinRiley architects-engineers
Uihlein/Wilson Architects |
AE Shortlist: |
Berners-Schober Associates; Korb Tredo Architects, Inc.; KEE Architecture, Inc.; Groth Design Group, Inc. |
Selected AE: |
Berners-Schober Associates, Inc. (Green Bay, WI) |
|
Project No.:
|
13B2B
|
Project Name: |
Fletcher Hall Renovation and Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$13,382,000
|
AE Submittal Date: |
1/13/2014 2:30:00 PM |
Last Item Update: |
3/7/2014 5:13:42 PM |
AE Submitting Qualifications: |
Angus Young Associates, Inc.
Assemblage Architects
Berners-Schober Associates in association with VOA
Engberg Anderson, Inc.
Eppstein Uhen: Architects
Groth Design Group, Inc. in association with BLDD Architects, Inc.
Korb Tredo Architects
Plunkett Raysich Architects
SDS Architects, Inc.
Somerville, Inc.
Uihlein Wilson Architects
|
AE Shortlist: |
Angus Young Associates, Inc.; Engberg Anderson, Inc.; Eppstein Uhen: Architects; Somerville, Inc. |
Selected AE: |
Eppstein Uhen Architects |
|
Project No.:
|
13B3H
|
Project Name: |
Science Labs Building
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$63,894,000
|
AE Submittal Date: |
1/10/2014 2:30:00 PM |
Last Item Update: |
11/5/2014 12:00:43 PM |
AE Submitting Qualifications: |
Architectural Design Group (ADG) in assoc. with Rafferty Rafferty Tollefson Lindeke Architects (RRTL) in assoc. with Research Facilities Design
Berners-Schober Associates, Inc. in association with Harley Ellis Devereaux
BWBR
Continuum Architects + Planners, S.C. in association with Cannon Design
Loebl Schlossman & Hackl in association with CWE Inc.
Hammel, Green and Abrahamson, Inc.
River Architects in association with SmithGroupJRR
SDS Architects Inc. in association with EYP, Inc.
Sommerville Inc. in association with Perkins + Will
Strang, Inc. in association with Ballinger
Uihlein Wilson Architects Inc. in association with Ellenzweig |
AE Shortlist: |
Berners-Schober Associates, Inc. in assoc. with Harley Ellis Devereaux; BWBR; Continuum Architects + Planners, S.C. in assoc. with Cannon Design; River Architects in assoc. with SmithGroupJRR |
Selected AE: |
River Architects (La Crosse, WI) in association with SmithGroupJRR |
|
Project No.:
|
13B2C
|
Project Name: |
Chemistry-Biology Building
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$59,700,000
|
AE Submittal Date: |
9/19/2013 2:30:00 PM |
Last Item Update: |
12/11/2013 3:29:31 PM |
AE Submitting Qualifications: |
Architectural Design Group (ADG) in association with Rafferty Rafferty Tollefson Lindeke Architects (RRTL) in association with Research Facilities Design; Berners-Schober Associates, Inc in association with Harley Ellis Devereaux; Bray Associates Architects, Inc. in association with Stantec Architecture; BWBR; Continuum Architects + Planners in Association with Cannon Design; FLAD Architects; Groth Design Group, Inc. in association with BSA Life Structures; Hammel, Green & Abrahamson, Inc.; Plunkett Raysich Architects, LLP in association with Holabird & Root; Potter Lawson, Inc.; SDS Architects; Somerville Inc. in association with Perkins + Will; Strang Inc. in association with Lord Aeck & Sargent Architecture; Uihlein/Wilson Architects, Inc. in association with Ellenzweig; Zimmerman Architectural Studios, Inc. |
AE Shortlist: |
BWBR; Continuum Architects + Planners in Association with Cannon Design; Potter Lawson, Inc.; Somerville Inc. in association with Perkins + Will |
Selected AE: |
Potter Lawson Inc. |
|
Project No.:
|
13A2U
|
Project Name: |
Dairy Plant Renovation & Center for Dairy Research Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$20,652,000
|
AE Submittal Date: |
5/30/2013 2:30:00 PM |
Last Item Update: |
11/8/2013 10:32:22 AM |
AE Submitting Qualifications: |
Assemblage Architects, BWZ Architects, Continuum Architects & Planners S C, Hammel Green & Abrahamson Inc, Mead & Hunt, Inc. in association with Aro Eberle Architects, Potter Lawson Inc, Zimmerman Architectural Studios Inc |
AE Shortlist: |
BWZ Architects, Potter Lawson Inc, Zimmerman Architectural Studios Inc |
Selected AE: |
Zimmerman Architectural Studios Inc. |
|
Project No.:
|
13B3K
|
Project Name: |
West Campus Chilled Water Plant
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$6,912,000
|
AE Submittal Date: |
5/29/2013 2:30:00 PM |
Last Item Update: |
11/26/2013 1:51:48 PM |
AE Submitting Qualifications: |
Affiliated Engineers Inc, Angus Young Associates Inc in association with GMB Architecture + Engineering, Clark Dietz Inc, Henneman Engineering Inc, Juhl Energy, Inc. dba Power Engineers Collaborative LLC, Karges-Faulconbridge, Inc. in association with Short Elliot Hendrickson Inc, MEP Associates LLC, Ring & DuChateau, LLP, Sebesta Blomberg & Associates Inc |
AE Shortlist: |
Affiliated Engineers Inc, Karges-Faulconbridge, Inc. in association with Short Elliot Hendrickson Inc,Ring & DuChateau, LLP, Sebesta Blomberg & Associates Inc |
Selected AE: |
Ring & DuChateau, LLP |
|
Project No.:
|
12D2N
|
Project Name: |
DOJ Crime Lab Expansion in Building D
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$3,820,700
|
AE Submittal Date: |
5/23/2013 2:30:00 PM |
Last Item Update: |
10/17/2013 2:11:11 PM |
AE Submitting Qualifications: |
Assemblage Architects, Continuum Architects & Planners S C, Mayer Helminiak Architects LLC |
AE Shortlist: |
Mayer Helminiak Architects LLC, Assemblage Architects, Continuum Architects & Planners S C |
Selected AE: |
Mayer Helminiak Architects LLC |
|
Project No.:
|
12L1C
|
Project Name: |
N. DeBot Res. Hall Renov.PH II
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$11,203,000
|
AE Submittal Date: |
3/21/2013 2:30:00 PM |
Last Item Update: |
5/16/2013 11:19:16 AM |
AE Submitting Qualifications: |
Angus Young Associates Inc; Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc; Assemblage Architects; Berners Schober Associates Inc; Boer Architects Inc in association with BLDD Architects, Inc.; BWZ Architects; Dorschner Associates Inc in association with RADA Architects; Lien & Peterson Architects, Inc; SDS Architects Inc; Somerville, Inc. |
AE Shortlist: |
Somerville, Inc.; Angus Young Associates Inc; SDS Architects Inc; Lien & Peterson Architects, Inc |
Selected AE: |
Somerville, Inc. |
|
Project No.:
|
12J3C
|
Project Name: |
New Residence Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
Construction Cost: |
$21,767,000
|
AE Submittal Date: |
3/21/2013 2:30:00 PM |
Last Item Update: |
4/11/2013 9:04:23 AM |
AE Submitting Qualifications: |
Assemblage Architects; Berners Schober Associates Inc in association with VOA Associates Incorporated; Boer Architects Inc with association with BLDD Architects, Inc.; BWZ Architects; Engberg Anderson Inc; Eppstein Uhen Architects; Hammel Green & Abrahamson Inc; Kahler Slater Inc in association with Mackey Mitchell Architects; Korb Tredo Architects Inc; Mayer Helminiak Architects LLC; Mead & Hunt Inc in association with Treanor Architects; Potter Lawson Inc; SDS Architects Inc |
|
Project No.:
|
12J1K
|
Project Name: |
Boebel Hall Addition and Renovation Phase II
|
Institution: |
UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
|
Location: |
CITY OF PLATTEVILLE, Wisconsin
|
Construction Cost: |
$12,525,000
|
AE Submittal Date: |
1/3/2013 2:30:00 PM |
Last Item Update: |
12/20/2017 9:57:48 AM |
AE Submitting Qualifications: |
Angus Young Associates Inc in association with Harley Ellis Devereaux, Aro Eberle Architects, Assemblage Architects, BWBR Architects, Inc., Continuum Architects & Planners S C, Dorschner Associates Inc in association with OPN Architects, Inc., Mayer Helminiak Architects LLC, Plunkett Raysich Architects, SDS Architects Inc, Strang Inc |
AE Shortlist: |
Plunkett Raysich Architects, Strang Inc, Continuum Architects & Planners S C, Aro Eberle Architects |
|
Project No.:
|
12I1R
|
Project Name: |
Rodli Hall Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
|
Location: |
CITY OF RIVER FALLS, Wisconsin
|
Construction Cost: |
$11,296,000
|
AE Submittal Date: |
1/3/2013 2:30:00 PM |
Last Item Update: |
11/13/2014 2:43:01 PM |
AE Submitting Qualifications: |
Boer Architects Inc, Dorschner Associates Inc, Frisbie Architects Inc, KEE Architecture Inc, Lien & Peterson Architects, Inc; Mead & Hunt Inc, SDS Architects Inc, Somerville, Inc |
AE Shortlist: |
Lien & Peterson Architects, Inc; KEE Architecture Inc; Frisbie Architects Inc; Somerville, Inc. |
Selected AE: |
Somerville, Inc. |
|
Project No.:
|
11A1X-01
|
Project Name: |
University Houses Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$11,598,000
|
AE Submittal Date: |
11/27/2012 2:30:00 PM |
Last Item Update: |
2/4/2013 9:18:14 AM |
AE Submitting Qualifications: |
Angus Young Associates Inc in association with SHW Group , LLP; Architects Group Limited, BWZ Architects with association with Knothe & Bruce Architects LLC, Henneman Engineering Inc, Kindness Architecture & Planning, Welman Architects Inc |
AE Shortlist: |
Kindness Architecture & Planning, Henneman Engineering Inc, Welman Architects Inc, BWZ Architect with association with Knothe & Bruce Architects LLC |
Selected AE: |
BWZ Architects with association with Knothe & Bruce Architects LLC |
|
Project No.:
|
12G3K
|
Project Name: |
Stout, McCalmont Hall Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
TOWN OF MENOMONIE, Wisconsin
|
Construction Cost: |
$5,946,000
|
AE Submittal Date: |
11/6/2012 2:30:00 PM |
Last Item Update: |
2/20/2013 8:16:35 AM |
AE Submitting Qualifications: |
Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc, Assemblage Architects, BWBR Architects, Inc.; BWZ Architects, Cedar Corporation in association with Bray Associates Architects, Inc; SDS Architects Inc, Somerville, Inc. |
AE Shortlist: |
Somerville, Inc; BWZ Architects, BWBR Architects, Assemblage Architects |
Selected AE: |
BWBR Architects, Inc. |
|
Project No.:
|
12H2W
|
Project Name: |
New Student Center
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$40,396,000
|
AE Submittal Date: |
11/1/2012 2:30:00 PM |
Last Item Update: |
2/4/2013 8:44:33 AM |
AE Submitting Qualifications: |
Eppstein Uhen Architects in association with Moody Nolan Inc, Kahler Slater Inc in association with Mackey Mitchell Architects, KEE Architecture Inc, Kindness Architecture & Planning, SDS Architects Inc, Strang Inc in association with Holzman Moss Bottino Architecture, Uihlein Wilson Architects Inc, Workshop Architects Inc |
AE Shortlist: |
SDS Architects Inc, KEE Architecture Inc, Kindness Architecture & Planning, Eppstein Uhen Architects in association with Moody Nolan Inc |
Selected AE: |
Kindness Architecture & Planning |
|
Project No.:
|
12B2E
|
Project Name: |
Construct Operations Center-JFHQ
|
Institution: |
MILITARY AFFAIRS/MADISON
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$4,895,176
|
AE Submittal Date: |
8/28/2012 2:30:00 PM |
Last Item Update: |
10/30/2012 8:22:25 AM |
AE Submitting Qualifications: |
Angus Young Associates Inc, Boer Architects Inc in association with Epstein, BWZ Architects in association with Tactical Design, LLC; Fischer-Fischer-Theis, Inc.; HSR Associates Inc, Knight E/A Inc, Mead & Hunt Inc in association with Mason & Hanger, Plunkett Raysich Architects, Venture Architects |
AE Shortlist: |
Mead & Hunt Inc in association with Mason & Hanger, Venture Architects, Fischer-Fischer-Theis, Inc.; Boer Architects Inc in association with Epstein |
Selected AE: |
Venture Architects |
|
Project No.:
|
12D1D
|
Project Name: |
New Residence Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
|
Location: |
CITY OF EAU CLAIRE, Wisconsin
|
Construction Cost: |
$26,000,000
|
AE Submittal Date: |
7/17/2012 2:30:00 PM |
Last Item Update: |
10/30/2012 8:21:41 AM |
AE Submitting Qualifications: |
Angus Young Associates Inc in association with SHW Group, LLP; Berners Schober Associates Inc in association with VOA Associates Incorporated; Boer Architects Inc. with association with Booth Hansen; Bray Associates Architects, Inc in association with KSQ Architects, PC; Dorschner Associates Inc in association with Sasaki Associates Inc; Engberg Anderson Inc; Eppstein Uhen Architects; Frisbie Architects Inc in association with Mackey Mitchell Architects; Groth Design Group Inc in association with BLDD Architects, Inc.; Mayer Helminiak Architects LLC; Potter Lawson Inc; SDS Architects Inc; Uihlein Wilson Architects Inc |
AE Shortlist: |
Eppstein Uhen Architects; Berners Schober Associates Inc in association with VOA Associates Incorporated; Engberg Anderson Inc; SDS Architects Inc |
Selected AE: |
Engberg Anderson Inc |
|
Project No.:
|
12C3M
|
Project Name: |
WCGP Boiler Replacement
|
Institution: |
CORRECTIONS/CENTRAL GENERATING PLANT, WAUPUN
|
Location: |
CITY OF WAUPUN, Wisconsin
|
Construction Cost: |
$7,000,000
|
AE Submittal Date: |
6/26/2012 2:30:00 PM |
Last Item Update: |
8/29/2012 8:18:23 AM |
AE Submitting Qualifications: |
Affiliated Engineers Inc with Ross Infrastructure, LLC, an Affiliated Engineers, Inc Firm; Henneman Engineering Inc; Karges-Faulconbridge, Inc.; MEP Associates LLC in association with Fosdick & Hilmer Inc; Poyry LLC; Raasch Associates Inc; TCGroup Inc in association with Stantec Consulting Services Inc |
AE Shortlist: |
Raasch Associates Inc; Henneman Engineering Inc; Poyry LLC |
Selected AE: |
Raasch Associates Inc |
|
Project No.:
|
11H2A
|
Project Name: |
WMHI Boiler Replacement
|
Institution: |
HEALTH SERVICES/WINNEBAGO MENTAL HEALTH INSTITUTE
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$4,450,000
|
AE Submittal Date: |
6/26/2012 2:30:00 PM |
Last Item Update: |
8/29/2012 8:18:47 AM |
AE Submitting Qualifications: |
Affiliated Engineers Inc with Ross Infrastructure, LLC, an Affiliated Engineers, Inc Firm; Grumman Butkus Associates; Henneman Engineering Inc; Karges-Faulconbridge, Inc.; MEP Associates LLC in association with Fosdick & Hilmer Inc; Poyry LLC; Raasch Associates Inc; Ring & DuChateau, LLP in association with Sebesta Blomberg & Associates Inc; TCGroup Inc in association with Stantec Consulting Services Inc |
AE Shortlist: |
Raasch Associates Inc; Henneman Engineering Inc; Poyry LLC; Ring & DuChateau, LLP in association with Sebesta Blomberg & Associates Inc |
Selected AE: |
Raasch Associates Inc |
|
Project No.:
|
10E3R
|
Project Name: |
Readiness Center Add/Alt
|
Institution: |
MILITARY AFFAIRS/PORTAGE
|
Location: |
CITY OF PORTAGE, Wisconsin
|
Construction Cost: |
$4,500,000
|
AE Submittal Date: |
6/12/2012 2:30:00 PM |
Last Item Update: |
8/20/2012 8:50:19 AM |
AE Submitting Qualifications: |
Architects Group Limited, Architectural Design Group LLC in association with Leo A Daly, Assemblage Architects, BWZ Architects, FEH Associates Inc., Fischer-Fischer-Theis, Inc.; HSR Associates Inc, Mead & Hunt Inc in association with Mason & Hanger, Short Elliot Hendrickson Inc in association with Cox Group Architects, LLC |
AE Shortlist: |
Architectural Design Group LLC in association with Leo A Daly, Fischer-Fischer-Theis, Inc.; Mead & Hunt Inc in association with Mason & Hanger, BWZ Architects |
Selected AE: |
Fischer-Fischer-Theis, Inc. |
|
Project No.:
|
12B1K
|
Project Name: |
UW Hospital Parking Ramp Expansion
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$24,545,000
|
AE Submittal Date: |
5/10/2012 2:30:00 PM |
Last Item Update: |
6/29/2012 5:03:22 PM |
AE Submitting Qualifications: |
Arnold & O’Sheridan, Inc.; BWZ Architects in association with Carl Walker Inc, Bloom Companies LLC, GRAEF, Henneman Engineering Inc, JSD Professional Services Inc in association with Kimley-Horn and Associates, Inc. |
AE Shortlist: |
Arnold & O’Sheridan Inc., Bloom Companies LLC, JSD Professional Services Inc in association with Kimley-Horn and Associates, Inc.; GRAEF |
Selected AE: |
GRAEF |
|
Project No.:
|
11A1E
|
Project Name: |
River Falls, Falcon Center
|
Institution: |
UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
|
Location: |
CITY OF RIVER FALLS, Wisconsin
|
Construction Cost: |
$49,004,000
|
AE Submittal Date: |
5/8/2012 2:30:00 PM |
Last Item Update: |
7/2/2012 7:51:21 AM |
AE Submitting Qualifications: |
AECOM USA, Inc.; Angus Young Associates Inc.in association with GMB Architecture + Engineering, Ayres Associates Inc in association with Hastings+Chivetta Architects, Inc.; Berners Schober Associates Inc in association with VOA Associates Incorporated, Bray Associates Architects, Inc. in association with Hastings+Chivetta Architects, Inc.; Continuum Architects & Planners S C in association with SmithGroupJJR, Frisbie Architects Inc in association with Moody Nolan Inc, HSR Associates Inc in association with RDG Planning & Design, Kahler Slater Inc, Potter Lawson Inc in association with Cannon Design, SDS Architects Inc in association with Dewberry Architects Inc., Somerville, Inc.in association with Pelli Clarke Pelli Architects |
AE Shortlist: |
AECOM USA, Inc.; Ayres Associates Inc in association with Hastings+Chivetta Architects, Inc., SDS Architects in association with Dewberry Architects, Inc., HSR Associates Inc in association with RDG Planning & Design |
Selected AE: |
Ayres Associates Inc in association with Hastings+Chivetta Architects, Inc. |
|
Project No.:
|
11I2E
|
Project Name: |
Renovation of Clow Social Science Center
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$18,163,000
|
AE Submittal Date: |
4/3/2012 2:30:00 PM |
Last Item Update: |
5/22/2012 3:56:33 PM |
AE Submitting Qualifications: |
Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc; Berners Schober Associates Inc; Bray Associates Architects, Inc. in association with Stantec Architecture Inc; Continuum Architects & Planners S C; Dorschner Associates Inc in association with Harley Ellis Devereaux; Groth Design Group Inc in association with BSA LifeStructures; Hammel Green & Abrahamson Inc; Kahler Slater Inc; McMahon; Rinka Chung Architecture Inc in association with Legat Architects; Strang Inc in association with Richter Cornbrooks Gribble, Inc |
AE Shortlist: |
Strang Inc in association with Richter Cornbrooks Gribble, Inc; Kahler Slater Inc; Groth Design Group Inc in association with BSA LifeStructures; Dorschner Associates Inc in association with Harley Ellis Devereaux |
Selected AE: |
Kahler Slater Inc |
|
Project No.:
|
11L2J
|
Project Name: |
West Campus Res Hall Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
Construction Cost: |
$9,522,000
|
AE Submittal Date: |
3/22/2012 2:30:00 PM |
Last Item Update: |
5/17/2012 8:07:06 AM |
AE Submitting Qualifications: |
Barrientos Design & Consulting, Inc.; Boer Architects Inc in association with Booth Hansen, Bray Associates Architects Inc in association with Stantec Architecture Inc., BWZ Architects, Continuum Architects & Planners S C, Dorschner Associates Inc in association with RADA Architects, Engberg Anderson Inc, Eppstein Uhen Architects, Groth Design Group Inc in association with BLDD Architects Inc, Korb Tredo Architects Inc, Mayer Helminiak Architects LLC, Mead & Hunt Inc, Potter Lawson Inc, Rinka Chung Architecture Inc in association with Trivers Associates, Somerville Inc |
AE Shortlist: |
Mayer Helminiak Architects LLC, Groth Design Group Inc in association with BLDD Architects, Inc; Mead & Hunt Inc, Korb Tredo Architects Inc |
Selected AE: |
Mead & Hunt Inc |
|
Project No.:
|
11I1X
|
Project Name: |
Stout, Harvey Hall Renovation - Ph II
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
Construction Cost: |
$19,859,000
|
AE Submittal Date: |
2/9/2012 2:30:00 PM |
Last Item Update: |
4/6/2012 10:20:07 AM |
AE Submitting Qualifications: |
Aro Eberle Architects; Bloom Companies LLC in association with James G. Otto Architect, LLC; BWZ Architects; Dorschner Associates Inc in association with Miller Dunwiddie Architecture Inc; Eppstein Uhen Architects; Frisbie Architects Inc in association with Mackey Mitchell Architects; Hammel Green & Abrahamson Inc; Krech Ojard & Associates; River Architects Inc; SDS Architects Inc; Strang Inc |
AE Shortlist: |
Aro Eberle Architects; River Architects Inc; Strang Inc; SDS Architects Inc |
Selected AE: |
River Architects Inc |
|
Project No.:
|
10C4L
|
Project Name: |
Reconstruct Montello Dam
|
Institution: |
NATURAL RESOURCES/MONTELLO DAM
|
Location: |
CITY OF MONTELLO, Wisconsin
|
Construction Cost: |
$7,120,300
|
AE Submittal Date: |
2/2/2012 2:30:00 PM |
Last Item Update: |
3/30/2012 9:42:48 AM |
AE Submitting Qualifications: |
AECOM USA Inc, Ayres Associates Inc, CDM Smith Inc. in association with Bloom Companies LLC, Mead & Hunt Inc, MWH Americas Inc |
AE Shortlist: |
Mead & Hunt Inc, AECOM USA Inc, MWH Americas Inc, Ayres Associates Inc |
Selected AE: |
Mead & Hunt Inc |
|
Project No.:
|
11F3C
|
Project Name: |
Residence Halls Renovation Dobson & Melcher
|
Institution: |
UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
|
Location: |
CITY OF PLATTEVILLE, Wisconsin
|
Construction Cost: |
$9,882,000
|
AE Submittal Date: |
11/29/2011 2:30:00 PM |
Last Item Update: |
1/30/2012 3:16:01 PM |
AE Submitting Qualifications: |
American Design Inc in association with Eppstein Uhen Architects, Angus Young Associates Inc in association with Treanor Architects, Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc, Assemblage Architects, Bray Associates Architects Inc, Engberg Anderson Inc, HSR Associates Inc in association with KINDNESS architecture + planning, Krech Ojard & Associates in association with Bentz Thompson Rietow Architects, Inc, Mead & Hunt Inc in association with BWZ Architects, Zimmerman Architectural Studios Inc |
AE Shortlist: |
ASSEMBLAGE ARCHITECTS, MEAD & HUNT INC INC in association with BWZ ARCHITECTS, ANGUS YOUNG ASSOCIATES INC in association with TREANOR ARCHITECTS, ENGBERG ANDERSON INC |
Selected AE: |
Assemblage Architects |
|
Project No.:
|
09K1K CMAR
|
Project Name: |
WI Union Redevelopment Project
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$37,753,000
|
AE Submittal Date: |
11/14/2011 2:00:00 PM |
Last Item Update: |
12/20/2011 12:03:26 PM |
AE Submitting Qualifications: |
The Boldt Company, Camosy Construction, CD Smith Construction Services, CG Schmidt, Gilbane Building Company, Hunzinger Construction Company, JH Findorff & Son, JP Cullen & Sons, Lend Lease Construction in association with Maas Brothers Construction, Mortenson Construction |
AE Shortlist: |
The Boldt Company, CG Schmidt, JH Findorff & Son, Mortenson Construction |
Selected AE: |
THE BOLDT COMPANY |
|
Project No.:
|
11F1X
|
Project Name: |
Elizabeth Waters Hall Renovations
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$5,342,000
|
AE Submittal Date: |
9/1/2011 2:30:00 PM |
Last Item Update: |
10/28/2011 11:26:30 AM |
AE Submitting Qualifications: |
Assemblage Architects, Bray Associates Architects Inc, BWZ Architects, Engberg Anderson Inc, Korb Tredo Architects Inc, Potter Lawson Inc, Somerville Inc, Strang Inc |
AE Shortlist: |
ASSEMBLAGE ARCHITECTS, POTTER LAWSON INC, SOMERVILLE INC, BWZ ARCHITECTS |
Selected AE: |
SOMERVILLE INC |
|
Project No.:
|
10H3A CMAR
|
Project Name: |
Madison, Student Athlete Performance Ctr
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$58,400,000
|
AE Submittal Date: |
8/25/2011 2:00:00 PM |
Last Item Update: |
10/10/2011 12:43:39 PM |
AE Submitting Qualifications: |
The Boldt Company; CD Smith Construction Services; CG Schmidt, Inc; Hunzinger Construction Company; J.H. Findorff and Son, Inc; J.P. Cullen & Sons, Inc; Mortenson Construction |
AE Shortlist: |
CG SCHMIDT INC, JH FINDORFF AND SON INC, JP CULLEN AND SONS INC, MORTENSON CONSTRUCTION |
Selected AE: |
JP Cullen & Sons, Inc |
|
Project No.:
|
11C2L
|
Project Name: |
MIL NWQ Children’s Center Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$9,127,300
|
AE Submittal Date: |
8/18/2011 2:30:00 PM |
Last Item Update: |
10/5/2011 8:08:37 AM |
AE Submitting Qualifications: |
American Design Inc in association with Ross Barney Architects, Hammel Green & Abrahamson Inc in association with Holabird & Root LLC, Quorum Architects Inc., Zimmerman Architectural Studios Inc |
AE Shortlist: |
ZIMMERMAN ARCHITECTURAL STUDIOS INC, QUORUM ARCHITECTS INC |
Selected AE: |
QUORUM ARCHITECTS INC |
|
Project No.:
|
11C1O
|
Project Name: |
Ross and Hawkes Halls Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
|
Location: |
CITY OF SUPERIOR, Wisconsin
|
Construction Cost: |
$12,140,000
|
AE Submittal Date: |
6/14/2011 2:30:00 PM |
Last Item Update: |
8/2/2011 3:44:14 PM |
AE Submitting Qualifications: |
Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc, Assemblage Architects, Ayres Associates Inc in association with Design Plus, Inc; Frisbie Architects Inc in association with Mackey Mitchell Architects, Korb Tredo Architects Inc, Krech Ojard Architects Inc in association with Bentz Thompson Rietow Architects, Inc; Lien & Peterson Architects, Inc; McMahon, Potter Lawson Inc, SDS Architects Inc, Workshop Architects Inc |
AE Shortlist: |
SDS ARCHITECTS INC, KRECH OJARD & ASSOCIATES in association with BENTZ THOMPSON RIETOW ARCHITECTS, INC, ARCHITECTURAL DESIGN GROUP LLC in association with RAFFERTY RAFFERTY TOLLEFSON LINDEKE ARCHITECTS INC, WORKSHOP ARCHITECTS INC in association with LHB INC |
Selected AE: |
WORKSHOP ARCHITECTS INC in association with LHB INC |
|
Project No.:
|
11A2C
|
Project Name: |
N DeBot Residence Halls Renovation Ph I
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$9,621,000
|
AE Submittal Date: |
4/4/2011 2:30:00 PM |
Last Item Update: |
5/19/2011 3:05:49 PM |
AE Submitting Qualifications: |
American Design Inc in association with Eppstein Uhen Architects; Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc; Assemblage Architects; Boer Architects Inc in association with BLDD Architects Inc; Bray Associates Architects Inc (Milwaukee and Sheboygan); Cox & Associates; Engberg Anderson Inc; Grumman Butkus Associates; McMahon; SDS Architects Inc; Somerville Inc; Zimmerman Architectural Studios Inc |
AE Shortlist: |
Grumman Butkus Associates, Assemblage Architects, American Design Inc in association with Eppstein Uhen Architects, Somerville Inc |
Selected AE: |
Somerville Inc |
|
Project No.:
|
10K1H
|
Project Name: |
WCCF Chiller Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$53,691,000
|
AE Submittal Date: |
3/15/2011 2:30:00 PM |
Last Item Update: |
5/3/2011 7:46:37 AM |
AE Submitting Qualifications: |
Affiliated Engineers Inc, GRAEF in association with Ring & DuChateau, LLP, Henneman Engineering Inc in association with RMF Engineering Inc, Syska Hennessy Group Inc in association with Stanley Consultants Inc |
AE Shortlist: |
Affiliated Engineers Inc, GRAEF in association with Ring & DuChateau, LLP, Henneman Engineering Inc in association with RMF Engineering Inc, Syska Hennessy Group Inc in association with Stanley Consultants Inc |
Selected AE: |
Affiliated Engineers Inc |
|
Project No.:
|
10D2Q CMAR
|
Project Name: |
MIL IRC
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF WEST ALLIS, Wisconsin
|
Construction Cost: |
$59,186,281
|
AE Submittal Date: |
3/3/2011 2:00:00 PM |
Last Item Update: |
5/10/2011 12:51:29 PM |
AE Submitting Qualifications: |
THE BOLDT COMPANY, BOVIS LEND LEASE/ARTEAGA CONSTRUCTION INC, CD SMITH CONSTRUCTION SERVICES, CG SCHMIDT, GILBANE BUILDING COMPANY, HUNZINGER BUILDERS/F.A WILHELM, JH FINDORFF & SONS, JP CULLEN & SONS, INC, M A MORTENSON CONSTRUCTION, MIRON/MCCARTHY, VJS CONSTRUCTION SERVICES |
AE Shortlist: |
CG Schmidt Inc, Gilbane Building Company, Miron Construction Company/McCarthy Building Companies, Mortenson Construction |
Selected AE: |
CG SCHMIDT, INC |
|
Project No.:
|
10K2G
|
Project Name: |
Carson Gully Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MIDDLETON, Wisconsin
|
Construction Cost: |
$7,207,000
|
AE Submittal Date: |
2/1/2011 2:30:00 PM |
Last Item Update: |
3/21/2011 10:47:32 AM |
AE Submitting Qualifications: |
Assemblage Architects, Boer Architects Inc in association with HBRA Architects, Connolly Architects Inc, Engberg Anderson Inc, HSR Associates Inc, KEE Architecture Inc, Mead & Hunt Inc, SDS Architects Inc, Teng & Associates Inc, TWP Architecture, Workshop Architects Inc |
AE Shortlist: |
ASSEMBLAGE ARCHITECTS, BOER ARCHITECTS INC in association with HBRA ARCHITECTS, KEE ARCHITECTURE INC; WORKSHOP ARCHITECTS INC |
Selected AE: |
KEE ARCHITECTURE INC |
|
Project No.:
|
10J2S
|
Project Name: |
Parking Ramp and Police Services Building
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$10,000,000
|
AE Submittal Date: |
1/6/2011 2:30:00 PM |
Last Item Update: |
3/16/2011 2:31:24 PM |
AE Submitting Qualifications: |
Angus Young Associates Inc , Arnold & O Sheridan Inc, Bloom Companies, LLC, Engberg Anderson Inc, Frisbie Architects Inc in association with Collaborative Design Group Inc, GRAEF,
Gries Architectural Group Inc, Harwood Engineering Consultants Ltd, Henneman Engineering Inc, HSR Associates Inc, SDS Architects Inc in association with Palanisami & Associates Inc, Somerville Inc |
AE Shortlist: |
Arnold & O Sheridan Inc, Bloom Companies, LLC, Henneman Engineering Inc, GRAEF |
Selected AE: |
GRAEF |
|
Project No.:
|
10H3A
|
Project Name: |
Madison, Student Athlete Performance Ctr
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$56,800,000
|
AE Submittal Date: |
11/9/2010 2:30:00 PM |
Last Item Update: |
12/15/2010 4:20:16 PM |
AE Submitting Qualifications: |
Berners Schober Associates Inc in association with VOA Associates Incorporated; Engberg Anderson Inc in association with 360 Architecture Inc; Eppstein Uhen Architects in association with HNTB Architecture; Kahler Slater Inc; Potter Lawson Inc in association with Cannon Design |
AE Shortlist: |
POTTER LAWSON INC in association with CANNON DESIGN; BERNERS SCHOBER ASSOCIATES INC in association with VOA ASSOCIATES INCORPORATED; EPPSTEIN UHEN ARCHITECTS in association with HNTB ARCHITECTURE; KAHLER SLATER INC |
Selected AE: |
BERNERS SCHOBER ASSOCIATES INC in association with VOA ASSOCIATES INCORPORATED |
|
Project No.:
|
10D2Q
|
Project Name: |
MIL IRC
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF WEST ALLIS, Wisconsin
|
Construction Cost: |
$59,950,000
|
AE Submittal Date: |
10/13/2010 2:30:00 PM |
Last Item Update: |
11/19/2010 3:53:23 PM |
AE Submitting Qualifications: |
Engberg Anderson Inc in association with SmithGroup Inc; Flad Architects; Hammel Green & Abrahamson Inc; Kahler Slater Inc in association with ZGF Architects LLP; Plunkett Raysich Architects; Strang Inc in association with BSA LifeStructures; Teng & Associates Inc; Zimmerman Architectural Studios Inc in association with HOK Chicago , HOK Atlanta |
AE Shortlist: |
Flad Architects; Kahler Slater Inc in association with ZGF Architects LLP; Strang Inc in association with BSA LifeStructures; Hammel Green & Abrahamson Inc |
Selected AE: |
Flad Architects |
|
Project No.:
|
10F2J
|
Project Name: |
Music Performance Building
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$33,104,000
|
AE Submittal Date: |
10/12/2010 2:30:00 PM |
Last Item Update: |
11/19/2010 11:39:40 AM |
AE Submitting Qualifications: |
Angus Young Associates Inc in association with Cannon Design; Bray Associates Architects Inc in association with Zeidler Partnership Inc. Architects; Continuum Architects & Planners S C in association with Pfeiffer Partners Architects Inc; Dorschner Associates Inc in association with Trahan Architects; Engberg Anderson Inc in association with Ennead Architects LLP; Flad Architects; Hammel Green & Abrahamson Inc; La Dallman Architects Inc in association with Barton Myers Associates Inc; Potter Lawson Inc in association with LMN Architects; Somerville Inc in association with Westlake Reed Lekosky; Strang Inc in association with Holzman Moss Bottino Architecture; The Kubala Washatko Architects, Inc. in association with William Rawn Associates Architects Inc; Workshop Architects Inc in association with Boora Architects |
AE Shortlist: |
Strang Inc in association with Holzman Moss Bottino Architecture; The Kubala Washatko Architects, Inc. in association with William Rawn Associates Architects Inc; Flad Architects; Continuum Architects & Planners S C in association with Pfeiffer Partners Architects Inc |
Selected AE: |
Strang Inc in association with Holzman Moss Bottino Architecture |
|
Project No.:
|
10G3D
|
Project Name: |
Lakeshore Residence Hall PH II
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$10,489,000
|
AE Submittal Date: |
9/20/2010 2:30:00 PM |
Last Item Update: |
11/2/2010 10:26:16 AM |
AE Submitting Qualifications: |
Boer Architects Inc in association with BLDD Architects, Inc., BWZ Architects, Dorschner Associates Inc, Eppstein Uhen Architects, Johnsen Schmaling Architects in association with Baird Sampson Neuert Architects Inc., Potter Lawson Inc, The Kubala Washatko Architects, Inc. in association with Mackey Mitchell Architects |
AE Shortlist: |
The Kubala Washatko Architects, Inc. in association with Mackey Mitchell Architects, BWZ Architects, Boer Architects Inc in association with BLDD Architects, Inc., Eppstein Uhen Architects |
Selected AE: |
Eppstein Uhen Architects |
|
Project No.:
|
08A1Z
|
Project Name: |
UWEC, Education Building
|
Institution: |
UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
|
Location: |
CITY OF EAU CLAIRE, Wisconsin
|
Construction Cost: |
$31,042,800
|
AE Submittal Date: |
9/14/2010 2:30:00 PM |
Last Item Update: |
10/22/2010 1:42:52 PM |
AE Submitting Qualifications: |
Angus Young Associates Inc in association with Treanor Architects, Architectural Design Group LLC in association with Rafferty Rafferty Tollefson Lindeke Architects Inc, Ayres Associates Inc in association with DLR Group, Berners Schober Associates Inc in association with VOA Associates Incorporated, Boer Architects Inc in association with Holabird & Root LLC, Eppstein Uhen Architects in association with PSA-Dewberry Inc, Hammel Green & Abrahamson Inc, River Architects Inc, SDS Architects Inc in association with BWBR Architects Inc, Teng & Associates Inc, Workshop Architects Inc in association with Lord Aeck & Sargent Architecture |
AE Shortlist: |
SDS Architects Inc in association with BWBR Architects Inc, Eppstein Uhen Architects in association with PSA-Dewberry Inc, River Architects Inc, Workshop Architects Inc in association with Lord Aeck & Sargent Architecture |
Selected AE: |
River Architects, Inc. |
|
Project No.:
|
10E3F
|
Project Name: |
Stout, Fleming Hall Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
Construction Cost: |
$4,785,400
|
AE Submittal Date: |
8/31/2010 2:30:00 PM |
Last Item Update: |
10/5/2010 3:24:19 PM |
AE Submitting Qualifications: |
Boer Architects Inc, Boldt Technical Services, Groth Design Group Inc, Kehoe-Henry & Associates, Inc., Lien & Peterson Architects, Inc; McMahon, SDS Architects Inc |
AE Shortlist: |
LIEN & PETERSON ARCHITECTS, INC; GROTH DESIGN GROUP INC, BOER ARCHITECTS INC., McMAHON |
Selected AE: |
Lien & Peterson Architects, Inc |
|
Project No.:
|
10E1A
|
Project Name: |
Tactical Unmanned Aircraft Sys Fac
|
Institution: |
MILITARY AFFAIRS/CAMP WILLIAMS
|
Location: |
VILLAGE OF CAMP DOUGLAS, Wisconsin
|
Construction Cost: |
$6,480,250
|
AE Submittal Date: |
8/10/2010 2:30:00 PM |
Last Item Update: |
10/1/2010 3:38:41 PM |
AE Submitting Qualifications: |
Bailey Edward Architecture, Barrientos Design & Consulting LLC, Bray Associates Architects Inc in association with DRS Architects, Inc., BWZ Architects, Fischer Fischer Theis Inc, Gries Architectural Group Inc in association with KMA Architecture & Engineering, HSR Associates Inc, Mead & Hunt Inc |
AE Shortlist: |
HSR ASSOCIATES INC; BWZ ARCHITECTS; MEAD & HUNT INC; FISCHER FISCHER THEIS INC |
Selected AE: |
Fischer Fischer Theis Inc |
|
Project No.:
|
10E3H
|
Project Name: |
MIL SFS Addn Ph 1
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$36,997,500
|
AE Submittal Date: |
7/13/2010 2:30:00 PM |
Last Item Update: |
9/7/2010 11:09:13 AM |
AE Submitting Qualifications: |
Boer Architects Inc in association with Holabird & Root LLC, Camp Dresser & McKee Inc in association with Perkins& Will in association with Bloom Companies LLC, Continuum Architects & Planners S C in association with Bohlin Cywinski Jackson, Engberg Anderson Inc in association with SmithGroup Inc, Eppstein Uhen Architects in association with HOK Chicago and HOK, Flad Architects, Hammel Green & Abrahamson Inc, Kahler Slater Inc in association with Gould Evans, Korb Tredo Architects Inc in association with Payette, La Dallman Architects Inc in association with Tsoi Kobus & Associates, Inc.; Plunkett Raysich Architects, Strang Inc in association with HDR Architecture Inc, Workshop Architects Inc in association with Lord Aeck & Sargent Architecture |
AE Shortlist: |
CONTINUUM ARCHITECTS + PLANNERS in association with BOHLIN CYWINSKI JACKSON, HAMMEL GREEN AND ABRAHAMSON, INC, PLUNKETT RAYSICH ARCHITECTS, LLP; STRANG, INC. in association with HDR ARCHITECTURE, INC. |
Selected AE: |
Continuum Architects + Planners in association with Bohlin Cywinski Jackson |
|
Project No.:
|
10F1P
|
Project Name: |
UW MSN WIMR CMAR
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$102,700,000
|
AE Submittal Date: |
7/9/2010 2:00:00 PM |
Last Item Update: |
8/26/2010 8:16:13 AM |
AE Submitting Qualifications: |
The Boldt Company, CG Schmidt, Inc., J.H. Findorff and Son, Inc., Mortenson Construction, Vogel in association with Gilbane |
AE Shortlist: |
The Boldt Company, CG Schmidt, Inc., J.H. Findorff and Son, Inc., Vogel in association with Gilbane |
Selected AE: |
THE BOLDT COMPANY |
|
Project No.:
|
10B1X
|
Project Name: |
Carlson Hall Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
Construction Cost: |
$12,368,000
|
AE Submittal Date: |
5/19/2010 2:30:00 PM |
Last Item Update: |
7/1/2010 12:22:37 PM |
AE Submitting Qualifications: |
American Design Inc, Angus Young Associates Inc, Aro Eberle Architects, Assemblage Architects, Boer Architects Inc, Bouril Design Studio in association with HLKB Architecture, Bray Associates Architects Inc, Continuum Architects & Planners S C, Dorschner Associates Inc in association with Harley Ellis Devereaux, Engberg Anderson Inc, Eppstein Uhen Architects, Groth Design Group Inc, Mead & Hunt Inc in association with Architectural Alliance International, PSA Dewberry with PSA-Dewberry Inc, Somerville Inc, Strang Inc, The Kubala Washatko Architects, Inc. |
AE Shortlist: |
EPPSTEIN UHEN ARCHITECTS, ANGUS YOUNG ASSOCIATES INC, CONTINUUM ARCHITECTS & PLANNERS S C, STRANG INC |
Selected AE: |
STRANG INC |
|
Project No.:
|
09G3P
|
Project Name: |
Construct Field Main Shop WAUSAU
|
Institution: |
MILITARY AFFAIRS/WAUSAU
|
Location: |
CITY OF WAUSAU, Wisconsin
|
Construction Cost: |
$11,058,000
|
AE Submittal Date: |
5/13/2010 2:30:00 PM |
Last Item Update: |
6/24/2010 9:49:31 AM |
AE Submitting Qualifications: |
Angus Young Associates Inc, Ayres Associates Inc, Barrientos Design & Consulting LLC, Boer Architects Inc in association with Epstein, Cox & Associates in association with SSV Architecture Inc., Fischer Fischer Theis Inc, HSR Associates Inc, GRAEF, Gries Architectural Group Inc, MartinRiley Architects Engineers, Mead & Hunt Inc, Raasch Associates Inc, Short Elliot Hendrickson Inc, Somerville Inc |
AE Shortlist: |
BARRIENTOS DESIGN & CONSULTING LLC, FISCHER FISCHER THEIS INC, GRAEF, HSR ASSOCIATES INC |
Selected AE: |
HSR Associates Inc |
|
Project No.:
|
09I1M
|
Project Name: |
UW-MSN Charter St HP EPC
|
Institution: |
ADMINISTRATION/
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$175,000,000
|
AE Submittal Date: |
3/4/2010 2:00:00 PM |
Last Item Update: |
6/21/2010 1:39:27 PM |
AE Submitting Qualifications: |
Bibb Engineers, Architects & Constructors in/a/w Fagen, Inc.; The Boldt Company in/a/w AMEC; J.H. Findorff and Son, Inc. in/a/w Burns & McDonnell in/a/w ANZO, Inc.; Miron Construction Co., Inc. in/a/w Black & Veatch; SNC-Lavalin Constructors Inc.; URS Corporation in/a/w ENGlobal |
AE Shortlist: |
The Boldt Company in/a/w AMEC; Miron Construction Co., Inc. in/a/w Black & Veatch; SNC-Lavalin Constructors Inc.; URS Corporation in/a/w ENGlobal |
Selected AE: |
The Boldt Company in association with AMEC |
|
Project No.:
|
09K1K
|
Project Name: |
WI Union Redevelopment Project
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$37,753,000
|
AE Submittal Date: |
2/22/2010 2:30:00 PM |
Last Item Update: |
4/15/2010 7:50:52 AM |
AE Submitting Qualifications: |
Engberg Anderson Inc in association with Design Collective, Inc; Eppstein Uhen Architects in association with Finegold Alexander & Associates Inc, Hammel Green & Abrahamson Inc, Hammond Beeby Rupert Ainge Inc and Hammond Beeby Rupert Ainge Architects in association with Holabird & Root LLC and Martinez & Johnson Architecture, Plunkett Raysich Architects in association with Holzman Moss Bottino Architecture, Strang Inc in association with LMN Architects, The Kubala Washatko Architects, Inc. in association with Lord Aeck & Sargent Architecture, Uihlein Wilson Architects Inc in association with Moody Nolan Inc, Workshop Architects Inc in association with Quinn Evans Architects |
AE Shortlist: |
WORKSHOP ARCHITECTS INC in association with QUINN EVANS ARCHITECTS, UIHLEIN WILSON ARCHITECTS in association with MOODY NOLAN INC, PLUNKETT RAYSICH ARCHITECTS in association with HOLZMAN MOSS BOTTINO ARCHITECTURE, THE KUBALA WASHATKO ARCHITECTS, INC. in association with LORD AECK & SARGENT ARCHITECTURE |
Selected AE: |
UIHLEIN WILSON ARCHITECTS in association with MOODY NOLAN INC |
|
Project No.:
|
09J3Y
|
Project Name: |
Madison, School of Nursing
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$37,619,000
|
AE Submittal Date: |
2/9/2010 2:30:00 PM |
Last Item Update: |
3/23/2010 7:47:44 AM |
AE Submitting Qualifications: |
Boer Architects Inc in association with Holabird & Root LLC, Continuum Architects & Planners S C in association with HOK Chicago, Hammel Green & Abrahamson Inc, Eppstein Uhen Architects in association with Ayers Saint Gross, Flad Architects, Kahler Slater Inc, River Architects Inc in association with HDR Architecture Inc, Somerville Inc, Strang Inc in association with Richter Cornbrooks Gribble, Inc, Zimmerman Architectural Studios Inc |
AE Shortlist: |
Continuum Architects & Planners S C in association with HOK Chicago, Kahler Slater Inc, Strang Inc in association with Richter Cornbrooks Gribble, Inc, Eppstein Uhen Architects in association with Ayers Saint Gross |
Selected AE: |
Kahler Slater Inc |
|
Project No.:
|
08C4J
|
Project Name: |
Co-located Labs-DATCP&WSLH
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$22,618,000
|
AE Submittal Date: |
2/2/2010 2:30:00 PM |
Last Item Update: |
3/11/2010 1:17:41 PM |
AE Submitting Qualifications: |
Boer Architects Inc in association with Perkins Eastman, Bray Associates Architects Inc in association with Lord Aeck & Sargent Architecture, Flad Architects, Plunkett Raysich Architects, Strang Inc |
AE Shortlist: |
FLAD ARCHITECTS, BOER ARCHITECTS INC in association with PERKINS EASTMAN, STRANG INC, BRAY ASSOCIATES ARCHITECTS INC in association with LORD AECK & SARGENT ARCHITECTURE |
Selected AE: |
Flad Architects |
|
Project No.:
|
09K1J
|
Project Name: |
UWM Central Heating Plant Chiller Add
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$5,050,000
|
AE Submittal Date: |
2/2/2010 2:30:00 PM |
Last Item Update: |
3/16/2010 9:24:33 AM |
AE Submitting Qualifications: |
Affiliated Engineers Inc, Boer Architects Inc in association with Epstein, Power Engineers Collaborative LLC, Raasch Associates Inc, Ring & DuChateau, LLP, Syska Hennessy Group Inc |
AE Shortlist: |
AFFILIATED ENGINEERS INC, SYSKA HENNESSY GROUP INC, RAASCH ASSOCIATES INC, RING & DUCHATEAU, LLP |
Selected AE: |
Ring & DuChateau, LLP |
|
Project No.:
|
09H2K
|
Project Name: |
1 W. Wilson Envelope Repairs
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$10,700,000
|
AE Submittal Date: |
1/19/2010 2:30:00 PM |
Last Item Update: |
2/26/2010 3:01:27 PM |
AE Submitting Qualifications: |
Bloom Companies LLC in association with James G. Otto Architect, Boer Architects Inc in association with Thornton Tomasetti Inc, BWZ Architects in association with Quinn Evans Architects, Facility Engineering Inc in association with Wiss Janney Elstner Associates,
GRAEF, InSite Consulting Services LLC in association with DSGW Architects, Inc, Specialty Engineering Group LLC in association with Moody Nolan Inc |
AE Shortlist: |
BLOOM COMPANIES LLC in association with JAMES G. OTTO ARCHITECTS, LLC; GRAEF; FACILITY ENGINEERING INC in association with WISS JANNEY ELSTNER ASSOCIATES, BOER ARCHITECTS INC in association with THORNTON TOMASETTI INC |
Selected AE: |
Bloom Companies LLC in association with James G. Otto Architects LLC |
|
Project No.:
|
08J4P
|
Project Name: |
Wade House Visitor Ctr/Museum
|
Institution: |
HISTORICAL SOCIETY/WADE HOUSE, GREENBUSH
|
Location: |
TOWN OF GREENBUSH, Wisconsin
|
Construction Cost: |
$8,100,000
|
AE Submittal Date: |
1/5/2010 2:30:00 PM |
Last Item Update: |
3/9/2010 4:49:25 PM |
AE Submitting Qualifications: |
Boer Architects, Inc in association with Epstein; Bouril Design Studio, LLC in association with Holabird & Root; Bray Associates Architects, Inc in association with Barker Rinker Seacat Architecture; BWZ Architects, Inc in association with Quinn Evans Architects; Dorschner/Associates, Inc in association with Hammond Beeby Rupert Ainge Architects Inc; Engberg Anderson, Inc; Groth Design Group, Inc in association with Verner Johnson, Inc; The Kubala Washatko Architects, Inc; La Dallman Architects, Inc; MartinRiley architects-engineers; Quorum Architects, Inc; River Architects, Inc; Uihlein Wilson Architects |
AE Shortlist: |
BOER ARCHITECTS, INC in association with EPSTEIN; LA DALLMAN ARCHITECTS, INC; THE KUBALA WASHATKO ARCHITECTS, INC; AND UIHLEIN WILSON ARCHITECTS |
Selected AE: |
UIHLEIN WILSON ARCHITECTS |
|
Project No.:
|
09A1D
|
Project Name: |
TCI Monarch & Segregation Annexes
|
Institution: |
CORRECTIONS/TAYCHEEDAH CORRECTIONAL INSTITUTION
|
Location: |
CITY OF FOND DU LAC, Wisconsin
|
Construction Cost: |
$5,763,800
|
AE Submittal Date: |
12/14/2009 2:30:00 PM |
Last Item Update: |
2/2/2010 10:16:44 AM |
AE Submitting Qualifications: |
Mead & Hunt Inc, Kehoe Henry & Associates Inc, PSA Dewberry with PSA-Dewberry Inc, Somerville Inc, Venture Architects |
AE Shortlist: |
VENTURE ARCHITECTS, MEAD & HUNT INC, KEHOE HENRY & ASSOCIATES INC, SOMERVILLE INC |
Selected AE: |
Venture Architects |
|
Project No.:
|
06E2B
|
Project Name: |
Skilled Nursing Facility
|
Institution: |
VETERANS AFFAIRS/WISCONSIN VETERANS HOME-CHIPPEWA FALLS
|
Location: |
CITY OF CHIPPEWA FALLS, Wisconsin
|
Construction Cost: |
$15,850,000
|
AE Submittal Date: |
12/3/2009 2:30:00 PM |
Last Item Update: |
1/22/2010 9:39:42 AM |
AE Submitting Qualifications: |
Architectural Design Group Inc in association with Miller Hanson Partners; Ayres Associates Inc in association with Nelson-Tremain Partnership; Boer Architects Inc in association with PDC Midwest Inc; Cedar Corporation in association with Loebl Schlossman & Hackl; Dimension IV Madison Design Group in association with Sean Bujold & Associates Inc; Engberg Anderson Inc;
Frisbie Architects Inc in association with Nelson-Tremain Partnership; HSR Associates Inc in association with Horty Elving and Associates Inc; Plunkett Raysich Architects; Somerville Inc; Strang Inc in association with Nelson-Tremain Partnership; WAI Continuum |
AE Shortlist: |
HSR ASSOCIATES INC in association with HORTY ELVING AND ASSOCIATES INC; STRANG INC in association with NELSON-TREMAIN PARTNERSHIP; AYRES ASSOCIATESE INC in association with NELSON-TREMAIN PARTNERSHIP; FRISBIE ARCHITECTS INC in association with NELSON-TREMAIN PARTNERSHIP |
Selected AE: |
Frisbie Architects Inc in association with Nelson-Tremain Partnership |
|
Project No.:
|
09I1N
|
Project Name: |
UW-MSN CM for WI Energy Initiative
|
Institution: |
ADMINISTRATION/
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$100,000,000
|
AE Submittal Date: |
10/5/2009 2:00:00 PM |
Last Item Update: |
11/9/2009 1:51:51 PM |
AE Submitting Qualifications: |
The Boldt Co, CG Schmidt, Gilbane Building Co, JH Findorff & Son Inc, JP Cullen & Sons, Inc, Kraemer Brothers, Miron Construction Co in JVw/Walsh Construction Co, MA Mortenson Construction, PCL Construction Services, Inc |
AE Shortlist: |
THE BOLDT COMPANY, CG SCHMIDT, JP CULLEN & SONS, INC, MORTENSON CONSTRUCTION |
Selected AE: |
MA Mortenson Company |
|
Project No.:
|
09D3L
|
Project Name: |
Stout, Memorial Student Center Renov.
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
Construction Cost: |
$13,833,000
|
AE Submittal Date: |
9/22/2009 2:30:00 PM |
Last Item Update: |
11/4/2009 8:07:31 AM |
AE Submitting Qualifications: |
Ayres Associates Inc in association with Design Plus, Inc; Boer Architects Inc in association with Loebl Schlossman & Hackl; Dorschner Associates Inc in association with Sasaki Associates Inc;
Frisbie Architects Inc in association with Mackey Mitchell Architects; KEE Architecture Inc; PSA Dewberry; SDS Architects Inc; Strang Inc in association with LMN Architects; Uihlein Wilson Architects Inc; Yaggy Colby Associates in association with Kevin Hom & Andrew Goldman Architects PC |
AE Shortlist: |
FRISBIE ARCHITECTS INC in association with MACKEY MITCHELL ARCHITECTS; KEE ARCHITECTURE INC; UIHLEIN WILSON ARCHITECTS INC; SDS ARCHITECTS INC |
Selected AE: |
FRISBIE ARCHITECTS INC in association with MACKEY MITCHELL ARCHITECTS |
|
Project No.:
|
09H2L
|
Project Name: |
State Archive Preservation Facility
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$19,163,700
|
AE Submittal Date: |
9/21/2009 2:30:00 PM |
Last Item Update: |
10/27/2009 4:09:32 PM |
AE Submitting Qualifications: |
BWZ Architects in association with Opus Architects & Engineers, Inc.; Engberg Anderson Inc in association with SmithGroup; KEE Architecture Inc in association with Hammond Beeby Rupert Ainge Architects; PSA Dewberry |
AE Shortlist: |
ENGBERG ANDERSON INC in association with SMITHGROUP; PSA DEWBERRY; BWZ ARCHITECTS in association with OPUS ARCHITECTS & ENGINEERS, INC. |
Selected AE: |
ENGBERG ANDERSON INC in association with SMITHGROUP |
|
Project No.:
|
09H2D
|
Project Name: |
UW-MSN Athl/Hockey Fac CM
|
Institution: |
ADMINISTRATION/
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$22,292,000
|
AE Submittal Date: |
9/3/2009 2:00:00 PM |
Last Item Update: |
9/28/2009 1:14:28 PM |
AE Submitting Qualifications: |
CD Smith Construction Services, Fond du Lac, WI; Walsh Construction Co, Chicago, Ill; Hunzinger Construction Co, Milwaukee, WI; Miron Construction CO, Neenah, WI; JP Cullen & Sons, Janesville, WI, Vogel Bros Building CO, Madison, WI; KBS Co joint venture with Huffman Facility Dev. Inc, Madison, WI; Gilbane Building Co, Milwaukee, WI; Mortenson Construction Co, Madison, WI; Oscar J Boldt Construction Co, Madison, WI; JH Findorff Construction CO, Madison, WI; CG Schmidt Co, Madison, WI |
AE Shortlist: |
Oscar Boldt Co, Madison, WI; Gilbane Building Co, Milwaukee, WI; J H Findorff Co, Madison, WI; Mortenson Construction Co, Madison, WI |
Selected AE: |
JH FINDORFF & SON, INC. |
|
Project No.:
|
09D2H
|
Project Name: |
UWRF South Fork Suites Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
|
Location: |
CITY OF RIVER FALLS, Wisconsin
|
Construction Cost: |
$15,654,000
|
AE Submittal Date: |
8/4/2009 2:30:00 PM |
Last Item Update: |
9/10/2009 1:55:21 PM |
AE Submitting Qualifications: |
Angus Young Associates Inc in association with Treanor Architects, Ayres Associates Inc in association with Design Plus, Inc, Boer Architects Inc in association with Lohan Anderson LLC, Bouril Design Studio in association with KSQ Architects PC, Frisbie Architects Inc in association with Mackey Mitchell Architects, Mayer Helminiak Architects LLC, McMahon, SDS Architects Inc, William Wenzler & Associates Architects Inc |
AE Shortlist: |
ANGUS YOUNG ASSOCIATES Inc in association with TREANOR ARECHITECTS, AYRES ASSOCIATES Inc in association with DESIGN PLUS, INC, FRISBIE ARCHITECTS INC in association with MACKEY MITCHELL ARCHITECTS, SDS ARCHITECTS INC |
Selected AE: |
SDS Architects Inc |
|
Project No.:
|
09D2U
|
Project Name: |
Phy Plant Shops/Office Bldg
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$4,600,000
|
AE Submittal Date: |
7/15/2009 2:00:00 PM |
Last Item Update: |
8/12/2009 10:32:50 AM |
AE Submitting Qualifications: |
MSI General Contractors, Howard Immel Inc/BSA, Miron Construction Co/Eppstein Uhen, Alexander Co/Bachmann Construction,Tri-North Builders, CD Smith Construction/PRA, JH Findorff/Strand, Ideal Builders/Shulfer Architects, Iconica, Kraemer Bros/Strang, ACS/KBS/Flad, Mortenson Co/Assemblage Architects, Hunzinger Co/Zimmerman Design, CG Schmidt/Bray Architects, JP Cullen & Sons/GRAEFF, |
AE Shortlist: |
Kraemer Brothers, Miron Construction, Iconica, Mortenson Construction Co |
Selected AE: |
Kraemer Bros, Plain, WI |
|
Project No.:
|
08A2E
|
Project Name: |
WI Energy Institute
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$75,673,000
|
AE Submittal Date: |
4/30/2009 2:30:00 PM |
Last Item Update: |
6/2/2009 11:11:40 AM |
AE Submitting Qualifications: |
Flad & Associates dba Flad Architects with Flad & Associates dba Flad Architects Inc; Hammel Green & Abrahamson Inc in association with Zimmer Gunsul Frasca Architects LLP; HDR Architecture Inc with HDR Archs & Engrs PC; Plunkett Raysich Architects in association with CO Architectsl; Potter Lawson Inc; Strang Inc in association with SmithGroup, Inc.; Yaggy Colby Associates in association with Stantec Consulting Services Inc and Stantec Architecture Ltd and Stantec Consulting Ltd; Zimmerman Architectural Studios Inc |
AE Shortlist: |
STRANG INC in association with SMITHGROUP, INC.; PLUNKETT RAYSICH ARCHITECTS in association with CO ARCHTECTS; FLAD & ASSOCIATES dba FLAD ARCHITECTS with FLAD & ASSOCIATES dba FLAD ARCHITECTS INC; POTTER LAWSON INC |
Selected AE: |
POTTER LAWSON INC |
|
Project No.:
|
09B1U
|
Project Name: |
Madison - Hockey/Swimming Facility
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$22,292,000
|
AE Submittal Date: |
4/28/2009 2:30:00 PM |
Last Item Update: |
5/28/2009 3:09:38 PM |
AE Submitting Qualifications: |
Bray Associates Architects Inc in association with HNTB Architecture and HNTB Corporation, Engberg Anderson Inc in association with Cannon Design and Cannon Design Architecture and Cannon Design dba Cannon Boston Inc, Kahler Slater Inc, Potter Lawson Inc, The Durrant Group Inc in association with JLG Architects, Uihlein Wilson Architects Inc in association with RDG Planning & Design, Zimmerman Architectural Studios Inc in association with Populous |
AE Shortlist: |
UIHLEIN WILSON ARCHITECTS INC in association with RDG PLANNING & DESIGN, THE DURRANT GROUP INC in association with JLG ARCHITECTS, POTTER LAWSON INC, KAHLER SLATER INC |
Selected AE: |
KAHLER SLATER INC |
|
Project No.:
|
09A3E
|
Project Name: |
Gordon Commons
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$31,695,000
|
AE Submittal Date: |
4/21/2009 2:30:00 PM |
Last Item Update: |
5/22/2009 4:20:10 PM |
AE Submitting Qualifications: |
Angus Young Associates Inc in association with Cuningham Group Architecture, Berners Schober Associates Inc association with VOA Associates Incorporated, Bray Associates Architects Inc in association with Mesher Shing Architects in association with Burt Hill, Engberg Anderson Inc in association with Livermore Edwards & Associates, KEE Architecture Inc in association with Perry Dean Rogers Partners Architects, Potter Lawson Inc in association with Cannon Design, Quality Management Services Inc, Strang Inc in association with MHTN Architects Inc, The Durrant Group Inc in association with Mackey Mitchell Architects, Yaggy Colby Associates in association with Kevin Hom & Andrew Goldman Architects PC, Zingg Design Inc in association with OWP/P |
AE Shortlist: |
STRANG INC in association with MHTN ARCHITECTS INC, POTTER LAWSON INC in association with CANNON DESIGN, THE DURRANT GROUP, INC. in association with MACKEY MITCHELL ARCHITECTS, ENGBERG ANDERSON INC in association with LIVERMORE EDWARDS & ASSOCIATES |
Selected AE: |
POTTER LAWSON INC in association with CANNON DESIGN |
|
Project No.:
|
09A3F
|
Project Name: |
Fischer & Wellers Halls Renov.
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
Construction Cost: |
$7,134,000
|
AE Submittal Date: |
4/16/2009 2:30:00 PM |
Last Item Update: |
5/15/2009 12:31:26 PM |
AE Submitting Qualifications: |
Angus Young Associates Inc in association with Treanor Architects, Boer Architects Inc in association with Lohan Anderson LLC, BWZ Architects, Eppstein Uhen Architects, HGM Architecture Inc, Kehoe Henry & Associates Inc, Mayer Helminiak Architects LLC, McMahon, The Durrant Group Inc, Uihlein Wilson Architects Inc |
AE Shortlist: |
BOER ARCHITECTS INC in association with LOHAN ANDERSON LLC, ANGUS YOUNG ASSOCIATES INC in association with TREANOR ARCHITECTS, BWZ ARCHITECTS, UIHLEIN WILSON ARCHITECTS INC |
Selected AE: |
UIHLEIN WILSON ARCHITECTS INC |
|
Project No.:
|
09B1C
|
Project Name: |
North Campus Chiller
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$6,348,000
|
AE Submittal Date: |
4/13/2009 2:30:00 PM |
Last Item Update: |
5/15/2009 8:42:15 AM |
AE Submitting Qualifications: |
Affiliated Engineers Inc, Arnold & O Sheridan Inc, GRAEF, Grumman Butkus Associates, MEP Associates LLC, Raasch Associates Inc, Ring & DuChateau, LLP; Syska Hennessy Group Inc,
TCGroup Inc in association with Sebesta Blomberg & Associates Inc |
AE Shortlist: |
RING & DUCHATEAU, LLP; TCGROUP INC in association with SEBESTA BLOMBERG & ASSOCIATES INC, GRUMMAN BUTKUS ASSOCIATES, RAASCH ASSOCIATES INC |
Selected AE: |
RING & DUCHATEAU, LLP |
|
Project No.:
|
08K3J
|
Project Name: |
New Residence Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$25,644,000
|
AE Submittal Date: |
3/11/2009 2:30:00 PM |
Last Item Update: |
4/23/2009 3:58:06 PM |
AE Submitting Qualifications: |
AECOM Technical Services, Inc. and AECOM Services, Inc. and AECOM USA, Inc.; Berners-Schober Associates Inc. in association with VOA Associates Incorporated; Boer Architects, Inc. in association with Lohan Anderson LLC; Bray Associates Architects, Inc. in association with Hanbury Evans Wright Vlattas + Company; Continuum Architects & Planners, S.C. in association with Bostwick Design Partnership; Dorschner|Associates, Inc. in association with Sasaki Associates Inc; Eppstein Uhen Architects; Gensler; KEE Architecture, Inc in association with Treanor Architects; Potter Lawson Inc in association with Cannon Design; SDS Architects, Inc;
Somerville, Inc. in association with Booth Hansen; The Durrant Group Inc in association with Mackey Mitchell Architects; Uihlein/Wilson Architects, Inc.; Zimmerman Architectural Studios, Inc |
AE Shortlist: |
BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED, THE DURRANT GROUP INC in association with MACKEY MITCHELL ARCHITECTS, SOMERVILLE, INC. in association with BOOTH HANSEN, UIHLEIN/WILSON ARCHITECTS, INC. |
Selected AE: |
BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED |
|
Project No.:
|
07H1H
|
Project Name: |
GBY Rose & Wood Hall Remodeling
|
Institution: |
UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
|
Location: |
CITY OF GREEN BAY, Wisconsin
|
Construction Cost: |
$5,183,000
|
AE Submittal Date: |
2/24/2009 2:30:00 PM |
Last Item Update: |
4/9/2009 3:27:17 PM |
AE Submitting Qualifications: |
Berners-Schober Associates Inc., Boer Architects, Inc., Continuum Architects & Planners, S.C., HGM Architecture Inc, McMAHON, Somerville, Inc., The Durrant Group, Inc. |
AE Shortlist: |
BERNERS-SCHOBER ASSOCIATES INC., McMAHON, SOMERVILLE, INC., THE DURRANT GROUP, INC. |
Selected AE: |
BERNERS-SCHOBER ASSOCIATES INC. |
|
Project No.:
|
09A2K
|
Project Name: |
Capitol Heat and Power Plant Rebuild
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$15,000,000
|
AE Submittal Date: |
2/23/2009 2:30:00 PM |
Last Item Update: |
3/10/2009 9:35:15 AM |
AE Submitting Qualifications: |
Black & Veatch Corporation; Hammel, Green and Abrahamson, Inc.; Henneman Engineering, Inc.; Power Egineers Collaborative; Raasch Associates, Inc.; Ring & DuChateau, LLP; TCGroup Inc. in association with Sebasta Blomberg & Associates, Inc |
AE Shortlist: |
HENNEMAN ENGINEERING, INC.; POWER ENGINEERS COLLABORATIVE, LLC; RAASCH ASSOCIATES, INC.; RING & DUCHATEAU, LLP |
Selected AE: |
Henneman Engineering, Inc. |
|
Project No.:
|
09A2L
|
Project Name: |
Charter Street Heating Plant Rebuild
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$200,000,000
|
AE Submittal Date: |
2/23/2009 2:30:00 PM |
Last Item Update: |
5/6/2009 10:37:59 AM |
AE Submitting Qualifications: |
Black & Veatch Corporation; Jacobs; Luta, Daily & Brain, LLC; Power Engineers Collaborative, LLC in association with Poyry (Appleton), LLC; Sargent & Lundy; Stanley Consultants, Inc.; TC Group, Inc. in association with Sebesta Blomberg & Associates, Inc. |
AE Shortlist: |
JACOBS; LUTZ, DAILY & BRAIN, LLC; POWER ENGINEERS COLLABORATIVE, LLC in association with POYRY (APPLETON), LLC; SARGENT & LUNDY |
Selected AE: |
Power Engineers Collaborative, LLC in association with Poyry (Appleton), LLC |
|
Project No.:
|
08I3G
|
Project Name: |
WSHP Chiller No. 1 Repl
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$6,920,000
|
AE Submittal Date: |
12/15/2008 2:30:00 PM |
Last Item Update: |
2/12/2009 4:47:50 PM |
AE Submitting Qualifications: |
Affiliated Engineers Inc, Graef, Anhalt, Schloemer & Associates, Inc.; Henneman Engineering, Ring & DuChateau Inc, Syska Hennessy Group; The Durrant Group, Inc. |
AE Shortlist: |
SYSKA HENNESSY GROUP, HENNEMAN ENGINEERING, RING & DUCHATEAU INC, AFFILIATED ENGINEERS INC |
Selected AE: |
Affiliated Engineers Inc |
|
Project No.:
|
08A2B
|
Project Name: |
Stout, Harvey Hall Theater Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
Construction Cost: |
$3,680,000
|
AE Submittal Date: |
11/5/2008 2:30:00 PM |
Last Item Update: |
12/10/2008 12:55:33 PM |
AE Submitting Qualifications: |
Engberg Anderson, Inc.: Isthmus Architecture, Inc.; Lien and Peterson Architects in association with Hammel, Green and Abrahamson, Inc.; MartinRiley Architects Engineers in association with Sandberg Architecture & Design; Potter Lawson Inc, SDS Architects, Inc; Strang Inc in association with Miller Dunwiddie Architecture, Inc. |
AE Shortlist: |
ISTHMUS ARCHITECTURE, INC, SDS ARCHITECTS, INC.; STRANG INC in association with MILLER DUNWIDDIE ARCHITECTURE, INC.; ENGBERG ANDERSON, INC. |
Selected AE: |
STRANG INC in association with MILLER DUNWIDDIE ARCHITECTURE, INC. |
|
Project No.:
|
08F2E
|
Project Name: |
Charter St HP BACT Compliance
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$0
|
AE Submittal Date: |
9/5/2008 2:30:00 PM |
Last Item Update: |
9/12/2008 1:25:30 PM |
Selected AE: |
The Titus Group Inc., Milwaukee,Wi |
|
Project No.:
|
07E2D
|
Project Name: |
UWEC, University Student Center
|
Institution: |
UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
|
Location: |
CITY OF EAU CLAIRE, Wisconsin
|
Construction Cost: |
$38,182,000
|
AE Submittal Date: |
6/24/2008 2:30:00 PM |
Last Item Update: |
9/4/2008 2:43:31 PM |
AE Submitting Qualifications: |
Ayres Associates Inc in association with Holzman Moss Architecture; Bray Associates Architects, Inc. in association with Burt Hill; Horty Elving and Associates Inc; KEE Architecture, Inc in association with Ellerbe Becket; River Architects, Inc. in association with SmithGroup; SDS Architects, Inc in association with Perkins & Will; Strang Inc in association with MHTN Architecture Inc.; Uihlein/Wilson Architects, Inc. in association with RDG Planning & Design;
Workshop Architects, Inc. |
AE Shortlist: |
Bray Associates Architects, Inc. in association with Burt Hill; Ayres Associates Inc in association with Holzman Moss Architecture; KEE Architecture, Inc in association with Ellerbe Becket; SDS Architects, Inc in association with Perkins & Will |
Selected AE: |
Bray Associates Architects, Inc. in association with Burt Hill |
|
Project No.:
|
07L2P
|
Project Name: |
GEF 3 Renovation, 4th Flr HVAC & ADA
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$3,059,700
|
AE Submittal Date: |
6/9/2008 2:30:00 PM |
Last Item Update: |
9/4/2008 2:39:44 PM |
AE Submitting Qualifications: |
Assemblage Architects, Boer Architects, Inc., Bray Associate Architects, Inc., Mattes Architects & Designers LLC, Strang Inc |
AE Shortlist: |
Assemblage Architects, Boer Architects, Inc., Bray Associate Architects, Inc., Mattes Architects & Designers LLC |
Selected AE: |
Boer Architects, Inc. |
|
Project No.:
|
08B3M
|
Project Name: |
UWL Residence Hall - Eagle Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$37,281,000
|
AE Submittal Date: |
6/3/2008 2:30:00 PM |
Last Item Update: |
9/4/2008 2:41:22 PM |
AE Submitting Qualifications: |
Eppstein Uhen Architects, HSR Associates, Inc, Plunkett Raysich Architects in association with Vantage Architects Inc, River Architects, Inc. in association with VOA Associates Incorporated, Uihlein/Wilson Architects, Inc. in association with Booth Hansen |
AE Shortlist: |
HSR ASSOCIATES, INC.; UIHLEIN/WILSON ARCHITECTS, INC. in association with BOOTH HANSEN; RIVER ARCHITECTS, INC. in association with VOA ASSOCIATES, INCORPORATED; EPPSTEIN UHEN ARCHITECTS |
Selected AE: |
EPPSTEIN UHEN ARCHITECTS |
|
Project No.:
|
07K2R
|
Project Name: |
New Residence Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$19,444,000
|
AE Submittal Date: |
4/21/2008 |
Last Item Update: |
5/29/2008 8:45:08 AM |
AE Submitting Qualifications: |
Bray Associates Architects, Inc. in association with Cannon Design; Continuum Architects + Planners, S.C. in association with Bostwick Design Partnership; Engberg Anderson, Inc. in association with Mackey Mitchell Architects, P.C.; Eppstein Uhen Architects, Inc.; Mayer Helminiak Architects, LLC; Mudrovich Architects in association with DMJM H&N, Inc.; Revelations Architects/Builders in association with KSQ Architects, PC; SDS Architects, Inc.; Somerville, Inc. in association with VOA Associates Incorporated |
AE Shortlist: |
SOMERVILLE, INC. in association with VOA ASSOCIATES INCORPORATED, BRAY ASSOCIATES ARCHITECTS, INC. in association with CANNON DESIGN, ENGBERG ANDERSON, INC. in association with MACKEY MITCHELL ARCHITECTS, EPPSTEIN UHEN ARCHITECTS, INC. |
Selected AE: |
ENGBERG ANDERSON, INC. in association with MACKEY MITCHELL ARCHITECTS |
|
Project No.:
|
08B4a
|
Project Name: |
Constr Mgr for Union South
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$66,770,000
|
AE Submittal Date: |
4/16/2008 |
Last Item Update: |
5/20/2008 4:24:05 PM |
AE Shortlist: |
Short listed CMAR: CG Schmidt Construction Co, Gilbane Bldg Co jv with Tri North Co, J.H. Findorff jv with Mortenson, Oscar Boldt Co |
Selected AE: |
Selected CMAR CG Schmidt, Milwaukee & Madison, Wisconsin |
|
Project No.:
|
06K2Q
|
Project Name: |
Elmwood Rmdl & Addn/Student Success Ctr
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$6,219,000
|
AE Submittal Date: |
4/3/2008 |
Last Item Update: |
6/3/2008 12:44:35 PM |
AE Submitting Qualifications: |
KEE Architecture, Durrant, Mattes Architects & Designers, LLC, Boer Architects, Inc. in association with Wydeven arhcitects, LLC, Continuum Architects + Planners, S.C., HGM Architecture, Inc., Plunkett Raysich Architects, LLP, Miller Wagner Coenen/McMahon, Inc., Mead & Hunt, Inc. |
AE Shortlist: |
THE DURRANT GROUP, INC., KEE ARCHITECTURE, INC., MEAD & HUNT, INC., MILLER WAGNER COENEN/MCMAHON, INC. |
Selected AE: |
KEE ARCHITECTURE, INC. |
|
Project No.:
|
07G3L
|
Project Name: |
Female Treatment Facility
|
Institution: |
HEALTH SERVICES/WISCONSIN RESOURCE CENTER, WINNEBAGO
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$8,544,100
|
AE Submittal Date: |
2/6/2008 |
Last Item Update: |
3/24/2008 1:15:40 PM |
AE Submitting Qualifications: |
Kehoe-Henry and Associates, Inc.; Quantic Architecture LLC in association with Mead & Hunt Inc, Somerville, Inc.; The Durrant Group Inc, Venture Architects |
AE Shortlist: |
SOMERVILLE, INC., THE DURRANT GROUP INC, QUANTIC ARCHITECTURE LLC in association with MEAD & HUNT INC, VENTURE ARCHITECTS |
Selected AE: |
The Durrant Group, Madison, WI |
|
Project No.:
|
07G1X
|
Project Name: |
RCI Food Production Facility
|
Institution: |
CORRECTIONS/RACINE CORRECTIONAL INSTITUTION, STURTEVANT
|
Location: |
VILLAGE OF STURTEVANT, Wisconsin
|
Construction Cost: |
$4,391,000
|
AE Submittal Date: |
1/29/2008 |
Last Item Update: |
3/5/2008 2:39:37 PM |
AE Submitting Qualifications: |
Architects Group Limited, Bray Associates Architects, Inc.; Kehoe-Henry and Associates, Inc., Mead & Hunt Inc, The Durrant Group Inc, Venture Architects |
AE Shortlist: |
MEAD & HUNT INC, THE DURRANT GROUP INC, VENTURE ARCHITECTS, ARCHITECTS GROUP LIMITED |
Selected AE: |
Venture Architects |
|
Project No.:
|
07G2U
|
Project Name: |
UWMIL Campus Master Plan
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$0
|
AE Submittal Date: |
1/10/2008 |
Last Item Update: |
2/22/2008 2:01:13 PM |
AE Submitting Qualifications: |
Engberg Anderson , Inc in association with Solomon Cordwell Buenz; Hammel, Green and Abrahamson, Inc. in association with Sasaki Associates Inc; HDR Architecture Inc in association with Loebl Schlossman & Hackl; JJR, LLC in association with Goody Clancy; Uihlein/Wilson Architects, Inc. in association with Booth Hansen and in association with Hargreaves Associates |
AE Shortlist: |
Updated 02/13/08: HDR ARCHITECTURE in association with LOEBL SCHLOSSMAN & HACKL, HAMMEL, GREEN AND ABRAHAMSON, INC in association with SASAKI ASSOCIATES, INC, JJR, LLC in association with GOODY CLANCY, ENGBERG ANDERSON, INC in association with SOLOMON CORDWELL BUENZ |
Selected AE: |
HAMMEL, GREEN and ABRAHAMSON, INC. in association with SASAKI ASSOCIATES INC |
|
Project No.:
|
07E4J
|
Project Name: |
Wisconsin Union Redevelopment
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$67,520,000
|
AE Submittal Date: |
10/24/2007 |
Last Item Update: |
2/22/2008 3:21:40 PM |
AE Submitting Qualifications: |
Bray Associates Architects, Inc. in association with Cannon Design, Eppstein Uhen Architects in association with Ayers/Saint/Gross, Kahler Slater Architects with association with WTW Architects, KEE Architecture, Inc in association with Perkins & Will, Plunkett Raysich Architects in association with Holzman Moss Architecture, Strang Inc in association with MHTN Architecture Inc., The Durrant Group, Inc. in association with SmithGroup, Toki & Associates, Inc. in association with Kevin Hom + Andrew Goldman Architects PC, Workshop Architects, Inc. in association with Moody Nolan, Inc. |
AE Shortlist: |
KAHLER SLATER ARCHITECTS in association with WTW ARCHITECTS, EPPSTEIN UHEN ARCHITECTS in association with AYERS/SAINT/GROSS, PLUNKETT RAYSICH ARCHITECTS in association with HOLZMAN MOSS ARCHITECTURE, WORKSHOP ARCHITECTS, INC. in association with MOODY NOLAN, INC. |
Selected AE: |
WORKSHOP ARCHITECTS, INC. in association with MOODY NOLAN, INC. |
|
Project No.:
|
07C1N
|
Project Name: |
UW MSN Chad/Barnard Renovation PH II
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$9,520,000
|
AE Submittal Date: |
8/21/2007 |
Last Item Update: |
9/26/2007 12:58:30 PM |
AE Submitting Qualifications: |
Assemblage Architects, BWZ Architects, HSR Associates, Inc; KEE Architecture, Inc; Uihlein/Wilson Architects, Inc.; William Wenzler & Associates - Architects Inc |
AE Shortlist: |
WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC., BWZ ARCHITECTS, UIHLEIN/WILSON ARCHITECTS, INC., KEE ARCHITECTURE, INC |
Selected AE: |
BWZ ARCHITECTS |
|
Project No.:
|
06L2I
|
Project Name: |
Randall - Dayton Utility Improvements
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$4,061,000
|
AE Submittal Date: |
6/26/2007 |
Last Item Update: |
8/15/2007 4:11:23 PM |
AE Submitting Qualifications: |
Affiliated Engineers Inc, Henneman Engineering, Knight E/A, Inc. Lang Associates, a Division of Clark Dietz, Inc. with Clark Dietz, Inc., Realtime Utility Engineers, Inc., an InfraSource Services Co, Strand Associates, Inc. |
AE Shortlist: |
LANG ASSOCIATES, a Division of Clark Dietz, Inc. with CLARK DIETZ, INC., HENNEMAN ENGINEERING, KNIGHT E/A, INC., STRAND ASSOCIATES, INC |
Selected AE: |
HENNEMAN ENGINEERING |
|
Project No.:
|
07B2F
|
Project Name: |
Stout, Hovlid Hall Renovation & Addn
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
Construction Cost: |
$6,800,000
|
AE Submittal Date: |
6/11/2007 |
Last Item Update: |
8/24/2007 9:24:48 AM |
AE Submitting Qualifications: |
Architects Group Limited, Architectural Design Group, Inc. in association with Mackey Mitchell Architects, Brownhouse, HSR Associates, Inc, Miller Wagner Coenen/McMahon, Inc., SDS Architects, Inc, Short Elliott Hendrickson Inc |
AE Shortlist: |
ARCHITECTURAL DESIGN GROUP, INC. in association with MACKEY MITCHELL ARCHITECTS, SDS ARCHITECTS, INC, MILLER WAGNER COENEN/McMAHON, INC., HSR ASSOCIATES, INC |
Selected AE: |
SDS ARCHITECTS, INC |
|
Project No.:
|
06E1B
|
Project Name: |
Armed Forces Reserve Center
|
Institution: |
MILITARY AFFAIRS/MADISON
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$29,289,700
|
AE Submittal Date: |
5/30/2007 |
Last Item Update: |
7/13/2007 9:53:08 AM |
AE Submitting Qualifications: |
Assemblage Architects, HSR Associates, Inc, Kapur & Associates Inc in association with VOA Associates Incorporated, Mead & Hunt Inc in association with GRW Engineers Inc, Potter Lawson Inc |
AE Shortlist: |
POTTER LAWSON INC, ASSEMBLAGE ARCHITECTS, MEAD & HUNT INC in association with GRW ENGINEERS INC, HSR ASSOCIATES, INC |
Selected AE: |
HSR ASSOCIATES, INC |
|
Project No.:
|
06K2Z
|
Project Name: |
UWMAD SoHE Addition & Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$35,255,000
|
AE Submittal Date: |
5/16/2007 |
Last Item Update: |
6/25/2007 9:41:06 AM |
AE Submitting Qualifications: |
BWZ Architects in association with Holabird & Root LLC, Dorschner|Associates, Inc. in association with Sasaki Associates Inc, Engberg Anderson Design Partnership, Inc in association with VOA Associates Incorporated, Eppstein Uhen Architects, HSR Associates, Inc in association with Ross Barney Architects |
AE Shortlist: |
BWZ ARCHITECTS in association with HOLABIRD & ROOT LLC, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC in association with VOA ASSOCIATES INCORPORATED, EPPSTEIN UHEN ARCHITECTS, DORSCHNER|ASSOCIATES, INC. in association with SASAKI ASSOCIATES INC |
Selected AE: |
Dorschner|Associates, Inc in association with Sasaki Associates Inc |
|
Project No.:
|
06B2C
|
Project Name: |
Arlington Integr Dairy - Phase II
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
TOWN OF LEEDS, Wisconsin
|
Construction Cost: |
|
AE Submittal Date: |
4/30/2007 |
Last Item Update: |
6/11/2007 9:52:33 AM |
AE Submitting Qualifications: |
Following firms to be interviewed on May 25, 2007 9:00 AM Keller Builders Inc. Kaukauna, WI 10:30 AM, DairyBuilding Contractors, Oneida, WI 1:00 PM Bauman Construction Inc., Chippewa Falls, WI 2:30 PM, Brickl Bros. Inc, West Salem, WI ( order of interviews in random order) |
Selected AE: |
DairyBuilding Contractors, Oneida, WI |
|
Project No.:
|
06K2R
|
Project Name: |
Lakeshore Res Hall & Food Service Fac
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$36,498,000
|
AE Submittal Date: |
4/25/2007 |
Last Item Update: |
6/12/2007 5:08:35 PM |
AE Submitting Qualifications: |
Dorschner|Associates, Inc. in association with Goody Clancy, Engberg Anderson Design Partnership, Inc in association with Mackey Mitchell Architects, Eppstein Uhen Architects, Mayer Helminiak Architects LLC (Formerly BHS) in association with VOA Associates Incorporated, Uihlein/Wilson Architects, Inc. in association with Booth Hansen, William Wenzler & Associates - Architects Inc, Zimmerman Architectural Studios, Inc |
AE Shortlist: |
EPPSTEIN UHEN ARCHITECTS, DORSCHNER|ASSOCIATES, INC in association with GOODY CLANCY, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC in association with MACKEY MITCHELL ARCHITECTS, WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC |
Selected AE: |
ENGBERG ANDERSON DESIGN PARTNERSHIP, INC. in association with MACKEY MITCHELL ARCHITECTS |
|
Project No.:
|
05I2O
|
Project Name: |
Communication Arts Renv & Addn
|
Institution: |
UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
|
Location: |
TOWN OF SOMERS, Wisconsin
|
Construction Cost: |
$27,132,000
|
AE Submittal Date: |
4/19/2007 |
Last Item Update: |
6/6/2007 4:51:38 PM |
AE Submitting Qualifications: |
BWZ Architects in association with Holabird & Root LLC, Dorschner|Associates, Inc. in association with Harley Ellis Devereaux, Engberg Anderson Design Partnership, Inc in association with Holzman Moss Architecture, Flad & Associates, Hammel, Green and Abrahamson, Inc |
AE Shortlist: |
ENGBERG ANDERSON DESIGN PARTNERSHIP, INC in association with HOLZMAN MOSS ARCHITECTURE, HAMMEL, GREEN AND ABRAHAMSON, INC., DORSCHNER|ASSOCIATES, INC. in association with HARLEY ELLIS DEVEREAUX |
Selected AE: |
Hammel, Green and Abrahamson, Inc. |
|
Project No.:
|
06K1G
|
Project Name: |
Suite Style Residence Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
|
Location: |
TOWN OF SOMERS, Wisconsin
|
Construction Cost: |
$22,076,000
|
AE Submittal Date: |
2/6/2007 |
Last Item Update: |
4/4/2007 5:01:50 PM |
AE Submitting Qualifications: |
Continuum Architects & Planners, S.C. in association with Bostwick Design Partners, Dorschner|Associates, Inc. in association with Einhorn Yaffee Prescott, Engberg Anderson Design Partnership, Inc. in association with Solomon Cordwell Buenz, Eppstein Uhen Architects,
Excel Engineering, Inc. in association with OPN Architects Inc, KEE Architecture, Inc in association with Mackey Mitchell Architects, Plunkett Raysich Architects, Renner Architects, William Wenzler & Associates - Architects Inc |
AE Shortlist: |
Kee Architecture, Engberg Anderson Design Partnership, Eppstein Uhen Architects, William Wenzler & Associates |
Selected AE: |
Eppstein Uhen Architects |
|
Project No.:
|
05I2Y
|
Project Name: |
Swenson Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
|
Location: |
CITY OF SUPERIOR, Wisconsin
|
Construction Cost: |
$25,865,000
|
AE Submittal Date: |
1/30/2007 |
Last Item Update: |
3/20/2007 9:52:59 AM |
AE Submitting Qualifications: |
Ayres Associates Inc in association with Harley Ellis Devereaux, Dorschner|Associates, Inc. in association with Einhorn Yaffee Prescott, Excel Engineering, Inc. in association with RDG Pnning & Design, Hammond Beeby Rupert Ainge Inc, HSR Associates, Inc in association with Ross Barney Architects, Kahler Slater Architects, Miller Wagner Coenen/McMahon, Inc. in association with Somerville, Inc., Potter Lawson Inc, SDS Architects, Inc in association with Perkins & Will, Strang Inc in association with SmithGroup, Toki & Associates, Inc. in association with Gensler |
AE Shortlist: |
Strang Inc in association with SmithGroup, Potter Lawson Inc, Ayres Associates Inc in association with Harley Ellis Devereaux, HSR Associates, Inc in association with Ross Barney Architects |
Selected AE: |
Potter Lawson Inc |
|
Project No.:
|
06C1Q
|
Project Name: |
UW WW New Residence Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
Construction Cost: |
$28,251,000
|
AE Submittal Date: |
1/22/2007 |
Last Item Update: |
3/16/2007 11:37:36 AM |
AE Submitting Qualifications: |
Continuum Architects & Planners, S.C. in association with Bostwick Design Partners, Dorschner|Associates, Inc. in association with Einhorn Yaffee Prescott, Engberg Anderson Design Partnership, Inc. in association with Solomon Cordwell Buenz, Eppstein Uhen Architects, KEE Architecture, Inc in association with Mackey Mitchell Architects, Plunkett Raysich Architects, Potter Lawson Inc in association with Cannon Design, Renner Architects, Uihlein/Wilson Architects, Inc. |
AE Shortlist: |
UIHLEIN/WILSON ARCHITECTS, INC., POTTER LAWSON INC in association with CANNON DESIGN, EPPSTEIN UHEN ARCHITECTS, CONTINUUM ARCHITECTS & PLANNERS, S.C |
Selected AE: |
POTTER LAWSON INC in association with CANNON DESIGN |
|
Project No.:
|
06J2N
|
Project Name: |
WID-MIR Constr Mgr at Risk
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$120,000,000
|
AE Submittal Date: |
11/16/2006 |
Last Item Update: |
1/19/2007 12:46:36 PM |
AE Shortlist: |
Short listed CMAR's : CD Smith, Fond du Lac, WI, Findorf-Mortenson Joint Venture, Madison, WI, Gilbane Bldg Co, Milwaukee, WI, Oscar Boldt Co, Madison, WI |
Selected AE: |
1- (Selected) Findorff - Mortenson; 2nd- Oscar Boldt Co; 3rd-CD Smith Co; 4th- Gilbane Co |
|
Project No.:
|
05I3N
|
Project Name: |
New Academic Building/Sage Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$36,239,000
|
AE Submittal Date: |
11/8/2006 |
Last Item Update: |
12/19/2006 4:10:15 PM |
AE Submitting Qualifications: |
Ayres Associates Inc in association with SmithGroup, Barrientos Design & Consulting, LLC in association with Goody Clancy, Berners-Schober Associates Inc. in association with VOA Associates Incorporated, Bray Associates Architects, Inc. in association with Perkins & Will,
Continuum Architects & Planners, S.C. in association with Ross Barney Architects, Eppstein Uhen Architects, Excel Engineering, Inc. in association with RDG Planning & Design, Plunkett Raysich Architects in association with Shepley Bulfinch Richardson and Abbott, Potter Lawson Inc, Somerville, Inc., Toki & Associates, Inc. in association with Gensler |
AE Shortlist: |
BARRIENTOS DESIGN & CONSULTING, LLC in association with GOODY CLANCY, POTTER LAWSON INC, BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED, BRAY ASSOCIATES ARCHITECTS, INC. in association with PERKINS & WILL |
Selected AE: |
BERNERS-SCHOBER ASSOCIATES INC. in association with VOA ASSOCIATES INCORPORATED |
|
Project No.:
|
05I2Q
|
Project Name: |
Stout, Jarvis Hall Renovation & Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
CITY OF MENOMONIE, Wisconsin
|
Construction Cost: |
$26,571,000
|
AE Submittal Date: |
10/10/2006 |
Last Item Update: |
11/20/2006 2:29:04 PM |
AE Submitting Qualifications: |
Ayres Associates Inc in association with SmithGroup, Berners-Schober Associates Inc., Continuum Architects & Planners, S.C. in association with Loebl Schlossman & Hackl, Dorschner|Associates, Inc. in association with Holabird & Root, Hammel, Green and Abrahamson, Inc., Plunkett Raysich Architects, Potter Lawson Inc, SDS Architects, Inc in association with BWBR Architects, Inc., The Durrant Group Inc |
AE Shortlist: |
SDS Architects, Inc in association with BWBR Architects, Inc., Berners-Schober Associates Inc, Potter Lawson Inc, Continuum Architects & Planners, S.C. in association with Loebl Schlossman & Hackl |
Selected AE: |
SDS Architects, Inc in association with BWBR Architects, Inc., |
|
Project No.:
|
06D2P
|
Project Name: |
UW MSN Education Bldg Renov & Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$22,864,000
|
AE Submittal Date: |
10/2/2006 |
Last Item Update: |
11/14/2006 3:34:00 PM |
AE Submitting Qualifications: |
Dorschner|Associates, Inc. in association with Miller Dunwiddie Architecture, Eppstein Uhen Architects, Hammel, Green and Abrahamson, Inc.; KEE Architecture, Inc, Renner Architects, The Kubala Washatko Architects Inc. in association with HOK Chicago |
AE Shortlist: |
HAMMEL, GREEN AND ABRAHAMSON, INC., EPPSTEIN UHEN ARCHITECTS, THE KUBALA WASHATKO ARCHITECTS INC. in association with HOK CHICAGO, DORSCHNER|ASSOCIATES, INC. in association with MILLER DUNWIDDIE ARCHITECTURE |
Selected AE: |
HAMMEL, GREEN AND ABRAHAMSON, INC. |
|
Project No.:
|
06F1Z
|
Project Name: |
Chazen Museum of Art Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$29,989,000
|
AE Submittal Date: |
9/26/2006 |
Last Item Update: |
11/13/2006 4:33:02 PM |
AE Submitting Qualifications: |
Berners-Schober Associates Inc. in association with Gwathmey Siegel & Associates Architects, Continuum Architects & Planners, S.C. in association with Machado & Silvetti Associates Inc, Dorschner|Associates, Inc. in association with Bernard Tschumi Architects, Engberg Anderson Design Partnership, Inc in association with Schwartz Silver Architects Inc, Hammel, Green and Abrahamson, Inc., Hammond Beeby Rupert Ainge Inc, La Dallman Architects Inc in association with The Rose Guggenheimer Studio, Potter Lawson Inc in association with E Verner Johnson & Associates Museum Architects & Planners, The Durrant Group Inc in association with Frederick Fisher & Partners Architects, The Kubala Washatko Architects Inc. in association with VJAA |
AE Shortlist: |
DALLMAN ARCHITECTS INC in association with THE ROSE GUGGENHEIMER STUDIO, DORSCHNER|ASSOCIATES, INC. in association with BERNARD TSCHUMI ARCHITECTS, BERNERS-SCHOBER ASSOCIATES INC. in association with GWATHMEY SIEGEL & ASSOCIATES, CONTINUUM ARCHITECTS & PLANNERS, S.C. in association with MACHADO & SILVETTI ASSOCIATES INC |
Selected AE: |
Continuum Architects & Planners, S.C. in association with Machado & Silvetti Associates Inc |
|
Project No.:
|
06D2R
|
Project Name: |
New Stadium & Fields Complex
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$11,973,000
|
AE Submittal Date: |
9/14/2006 |
Last Item Update: |
10/30/2006 3:01:51 PM |
AE Submitting Qualifications: |
Berners-Schober Associates Inc., Hammel, Green and Abrahamson, Inc. in association with Donald Eyberg Architects, HSR Associates, Inc in association with RDG Planning & Design, SDS Architects, Inc in association with Ellerbe Becket |
AE Shortlist: |
SDS ARCHITECTS, INC in association with ELLERBE BECKET, HSR ASSOCIATES, INC in association with RDG PLANNING & DESIGN, BERNERS-SCHOBER ASSOCIATES INC., HAMMEL, GREEN AND ABRAHAMSON, INC. in association with DONALD EYBERG ARCHITECTS |
Selected AE: |
HSR ASSOCIATES, INC in association with RDG PLANNING & DESIGN |
|
Project No.:
|
06A1M
|
Project Name: |
UW MSN East Campus Utility Improvement
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$16,300,000
|
AE Submittal Date: |
8/8/2006 |
Last Item Update: |
9/25/2006 1:30:17 PM |
AE Submitting Qualifications: |
Affiliated Engineers, Inc., Henneman Engineering, Strand Associates, Inc. in association with Ring & DuChateau Inc |
AE Shortlist: |
Strand Associates, Inc. in association with Ring & DuChateau Inc, Henneman Engineering, Affiliated Engineers, Inc. |
Selected AE: |
Affiliated Engineers, Inc. |
|
Project No.:
|
05L1W
|
Project Name: |
Jim Dan Hill Library Renov
|
Institution: |
UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
|
Location: |
CITY OF SUPERIOR, Wisconsin
|
Construction Cost: |
$5,917,000
|
AE Submittal Date: |
7/31/2006 |
Last Item Update: |
9/11/2006 3:08:22 PM |
AE Submitting Qualifications: |
Ayres Associates Inc in association with Ross Barney+Jankowski Inc, Engberg Anderson Design Partnership, Inc, River Architects, Inc., SDS Architects, Inc, The Durrant Group, Inc. |
AE Shortlist: |
Engberg Anderson Design Partnership, Inc, River Architects, Inc., SDS Architects, Inc, The Durrant Group, Inc. |
Selected AE: |
River Architects, Inc. |
|
Project No.:
|
06B1R
|
Project Name: |
Warehouse Rem Arts Relocation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$7,142,000
|
AE Submittal Date: |
7/25/2006 |
Last Item Update: |
8/31/2006 2:22:21 PM |
AE Submitting Qualifications: |
ANGUS YOUNG ASSOCIATES INC in association with OWP/P, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC, HAMMEL, GREEN AND ABRHAMSON, INC |
AE Shortlist: |
ANGUS YOUNG ASSOCIATES INC in association with OWP/P, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC, HAMMEL, GREEN AND ABRHAMSON, INC |
Selected AE: |
HAMMEL, GREEN AND ABRHAMSON, INC |
|
Project No.:
|
05L1D
|
Project Name: |
Rothwell Stu Cntr Replacement
|
Institution: |
UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
|
Location: |
CITY OF SUPERIOR, Wisconsin
|
Construction Cost: |
$16,575,000
|
AE Submittal Date: |
7/19/2006 |
Last Item Update: |
9/1/2006 10:35:07 AM |
AE Submitting Qualifications: |
Ayres Associates Inc in association with Design Partnership of Cambridge, Dorschner|Associates, Inc., Engberg Anderson Design Partnership, Inc in association with Ellerbe Becket, KEE Architecture, Inc, SDS Architects, Inc in association with Perkins & Will, Workshop Architects, Inc. |
AE Shortlist: |
Ayres Associates Inc in association with Design Partnership of Cambridge, Engberg Anderson Design Partnership, Inc in association with Ellerbe Becket, SDS Architects, Inc in association with Perkins & Will, Workshop Architects, Inc. |
Selected AE: |
Workshop Architects, Inc. |
|
Project No.:
|
06D1T
|
Project Name: |
WI Instit for Discovery
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$120,000,000
|
AE Submittal Date: |
7/18/2006 |
Last Item Update: |
9/20/2006 1:09:55 PM |
AE Submitting Qualifications: |
Firms nine showing interest in alphabetical order: Eppstein Uhen Arch, Madison & Milw, in association with in association with Perkins + Will, San Francisco & Los Angeles; Flad and Assoc. Madison; HGA Inc Milw & Minneapolis, MN, in association with Foster & Partners, London, England; Kahler Slater Arch Milw, in association with Tsoi/Kobus assoc. Cambridge, MA; Plunket Raysich Arch, Milw, in association with CO Architect, Los Angeles, CA; Skidmore Owins and Merrill, Chicago, IL in association with Engberg Anderson Design, Milw; Smith Group San Francisco CO in association with Ayres Associates, Eau Claire; Uihlein Wilson Arch. Milw, in association with Ballinger, Philadelphia, PA; The Zimmerman Design Group, Milw, in association with HOK Chicago ILL and HOK Atlanta |
AE Shortlist: |
Uihlein Wilson Arch., Milw, WI, in association with Ballinger, Philadelphia, PA; Eppstein Uhen Arch. , Madison & Mil in association with Perkins + Will, San Francisco & Los Angeles CA; HGA Inc Milw WI & Minneapolis, Min in association with Foster & Partners, London , England; PRA Arch. Milwaukee, WI in association with CO Architect Los Angeles, CA |
Selected AE: |
Rank: 1-Uihlein Wilson - Ballinger, 2-PRA-CO Architects, 3-HGA-Foster, 4-Eppstein Uhen -Perkins Will |
|
Project No.:
|
06B3C
|
Project Name: |
DHFS SRSTC Expansion
|
Institution: |
HEALTH SERVICES/SECURE TREATMENT FACILITY, MAUSTON
|
Location: |
CITY OF MAUSTON, Wisconsin
|
Construction Cost: |
$24,100,000
|
AE Submittal Date: |
7/13/2006 |
Last Item Update: |
8/22/2006 8:44:19 AM |
AE Submitting Qualifications: |
Ayres Associates Inc in association with BWBR Architects, Inc., Mead & Hunt Inc in association with Quantic Architecture LLC, Potter Lawson Inc, Venture Architects |
AE Shortlist: |
Ayres Associates Inc in association with BWBR Architects, Inc., Mead & Hunt Inc in association with Quantic Architecture LLC, Potter Lawson Inc, Venture Architects |
Selected AE: |
Venture Architects |
|
Project No.:
|
05D1Y
|
Project Name: |
Eau Claire, McPhee Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/EAU CLAIRE CAMPUS
|
Location: |
CITY OF EAU CLAIRE, Wisconsin
|
Construction Cost: |
$5,215,000
|
AE Submittal Date: |
7/11/2006 |
Last Item Update: |
8/22/2006 11:15:54 AM |
AE Submitting Qualifications: |
APEX Engineering, Berners-Schober Associates Inc., Dorschner|Associates, Inc., Henneman Engineering, SDS Architects, Inc |
AE Shortlist: |
Berners-Schober Associates Inc., Dorschner|Associates, Inc., Henneman Engineering, SDS Architects, Inc |
Selected AE: |
SDS Architects, Inc |
|
Project No.:
|
05I2F
|
Project Name: |
Fine Arts HVAC Sys Repl
|
Institution: |
UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
|
Location: |
CITY OF RIVER FALLS, Wisconsin
|
Construction Cost: |
$4,177,600
|
AE Submittal Date: |
6/13/2006 |
Last Item Update: |
8/1/2006 8:54:50 AM |
AE Submitting Qualifications: |
Grumman Butkus Associates, Henneman Engineering, Lang Associates, Inc in association with Clark Dietz, Inc, Power Engineers Collaborative LLC |
AE Shortlist: |
LANG ASSOCIATES, INC. in association with CLARK DIETZ, INC, POWER ENGINEERS COLLABORATIVE LLC, GRUMMAN BUTKUS ASSOCIATES |
Selected AE: |
GRUMMAN BUTKUS ASSOCIATES |
|
Project No.:
|
05I3O
|
Project Name: |
UWL New Academic Build.
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$23,560,000
|
AE Submittal Date: |
4/20/2006 |
Last Item Update: |
7/13/2006 3:32:43 PM |
AE Submitting Qualifications: |
Ayres Associates Inc in joint venture with SJA Architects, Eppstein Uhen Architects, Flad & Associates, Gensler, Hammel, Green and Abrahamson, Inc., HSR Associates, Inc, Potter Lawson Inc, River Architects, Inc., SDS Architects, Inc, Somerville, Inc. |
AE Shortlist: |
FLAD & ASSOCIATES, RIVER ARCHITECTS, INC, HAMMEL, GREEN AND ABRAHAMSON, INC, POTTER LAWSON INC |
Selected AE: |
RIVER ARCHITECTS, INC |
|
Project No.:
|
05I2H
|
Project Name: |
UW MSN West Campus Utility Improvement
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$18,700,000
|
AE Submittal Date: |
3/23/2006 |
Last Item Update: |
5/9/2006 11:38:53 AM |
AE Shortlist: |
HENNEMAN ENGINEERING, RING & DUCHATEAU INC, SHORT ELLIOTT HENDRICKSON INC in association with POWER ENGINEERS COLLABORATIVE LLC, AFFILIATED ENGINEERS INC |
Selected AE: |
RING & DUCHATEAU INC. |
|
Project No.:
|
05F1K
|
Project Name: |
Biochemistry II, Henry Mall
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$70,157,000
|
AE Submittal Date: |
3/8/2006 |
Last Item Update: |
5/9/2006 11:41:24 AM |
AE Shortlist: |
HAMMEL, GREEN AND ABRAHAMSON, INC. in association with TSOI/KOBUS & ASSOCIATES, INC., PLUNKETT RAYSICH ARCHITECTS in association with SHEPLEY BULFINCH RICHARDSON AND ABBOTT, UIHLEIN/WILSON ARCHITECTS, INC. in association with BALLINGER, FLAD & ASSOCIATES |
Selected AE: |
FLAD & ASSOCIATES |
|
Project No.:
|
05G2W
|
Project Name: |
SWVMC - Columbarium Dev Phase III
|
Institution: |
VETERANS AFFAIRS/SOUTHERN WI VETERANS MEMORIAL CEMETERY-UNION GROVE
|
Location: |
VILLAGE OF UNION GROVE, Wisconsin
|
Construction Cost: |
$4,544,700
|
AE Submittal Date: |
2/28/2006 |
Last Item Update: |
5/9/2006 11:41:42 AM |
AE Shortlist: |
TRIBUTE DESIGN SYSTEMS LLC in joint venture with RAMAKER & ASSOCIATES INC, STRAND ASSOCIATES, INC. in association with THE LA GROUP LANDSCAPE ARCHITECTURE & Engineering P C |
Selected AE: |
TRIBUTE DESIGN SYSTEMS LLC in joint venture with RAMAKER & ASSOCIATES INC |
|
Project No.:
|
05G1L
|
Project Name: |
New Drug Abuse Treatment Facility
|
Institution: |
CORRECTIONS/DRUG ABUSE CORRECTIONAL CENTER, WINNEBAGO
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$11,400,000
|
AE Submittal Date: |
2/20/2006 |
Last Item Update: |
3/31/2006 12:25:12 PM |
AE Shortlist: |
SEAN BUJOLD & ASSOCIATES, INC., in joint venture with HORTY ELVING AND ASSOCIATES INC., VENTURE ARCHITECTS, KEHOE-HENRY AND ASSOCIATES, INC. |
Selected AE: |
KEHOE-HENRY AND ASSOCIATES, INC. |
|
Project No.:
|
05G1J
|
Project Name: |
DOC OCI Food Service Facility
|
Institution: |
CORRECTIONS/OAKHILL CORRECTIONAL INSTITUTION, OREGON
|
Location: |
TOWN OF OREGON, Wisconsin
|
Construction Cost: |
$3,800,000
|
AE Submittal Date: |
12/13/2005 |
Last Item Update: |
2/9/2006 3:48:26 PM |
AE Shortlist: |
ARCHITECTS GROUP LIMITED, BRAY ASSOCIATES ARCHITECTS, INC., KEHOE-HENRY AND ASSOCIATES, INC., PERFORMA, INC. |
Selected AE: |
ARCHITECTS GROUP LIMITED |
|
Project No.:
|
04J1T
|
Project Name: |
UW MSN Univ Ridge Golf Course Expans
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$4,088,000
|
AE Submittal Date: |
12/7/2005 |
Last Item Update: |
2/8/2006 3:05:49 PM |
AE Shortlist: |
MELCHERT WALKKY INC., TOKI & ASSOCIATES, INC. in association with JACOBSON GOLF COURSE DESIGN INC., MSA PROFESSIONAL SERVICES, INC. in association with CLYDE JOHNSTON DESIGNS INC., JJR, LLC in association with ROBERT TRENT JONES II LLC |
Selected AE: |
JJR, LLC in association with ROBERT TRENT JONES II LLC |
|
Project No.:
|
05E1Z
|
Project Name: |
Sterling Hall Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$29,345,600
|
AE Submittal Date: |
11/15/2005 |
Last Item Update: |
1/11/2006 3:05:00 PM |
AE Shortlist: |
HAMMEL, GREEN AND ABRAHAMSON, INC., UIHLEIN/WILSON ARCHITECTS, INC. in association with BALLINGER, STRANG, INC., BERNERS-SCHOBER ASSOCIATES, INC. |
Selected AE: |
STRANG, INC. |
|
Project No.:
|
05D2N
|
Project Name: |
GEF 2 - Phase 2 Renovation
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$3,862,500
|
AE Submittal Date: |
10/20/2005 |
Last Item Update: |
2/2/2006 8:17:50 AM |
AE Shortlist: |
BRAY ASSOCIATES ARCHITECTS, INC., BWZ ARCHITECTS, DORSCHNER|ASSOCIATES, INC., STRANG, INC. |
Selected AE: |
STRANG, INC. |
|
Project No.:
|
05C2Q
|
Project Name: |
UW MSN Chadbourne Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$4,504,000
|
AE Submittal Date: |
9/15/2005 |
Last Item Update: |
11/8/2005 10:27:48 AM |
AE Shortlist: |
ASSEMBLAGE ARCHITECTS, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC. in association with SOLOMON CORDWELL BUENZ , WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC., ROHRBACH ASSOCIATES PC |
Selected AE: |
WILLIAM WENZLER & ASSOCIATES – ARCHITECTS, INC. |
|
Project No.:
|
05F2F
|
Project Name: |
GBY Union Expansion & Remodeling
|
Institution: |
UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
|
Location: |
CITY OF GREEN BAY, Wisconsin
|
Construction Cost: |
$4,871,000
|
AE Submittal Date: |
8/3/2005 |
Last Item Update: |
9/12/2005 9:55:37 AM |
AE Shortlist: |
ARCHITECTS GROUP LIMITED in association with MOODY NOLAN, INC., CONTINUUM ARCHITECTS + PLANNERS, S.C., PERFORMA, INC., KEE ARCHITECTURE, INC. |
Selected AE: |
KEE ARCHITECTURE, INC. |
|
Project No.:
|
05B2G
|
Project Name: |
UWO South Campus Parking Ramp
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$6,321,000
|
AE Submittal Date: |
7/25/2005 |
Last Item Update: |
9/12/2005 9:55:15 AM |
AE Shortlist: |
GRAEF, ANHALT, SCHLOEMER & ASSOCIATES, INC., ARNOLD & O’SHERIDAN, INC., BLOOM CONSULTANTS, LLC, HARWOOD ENGINEERING CONSULTANTS, LLC |
Selected AE: |
BLOOM CONSULTANTS, LLC. |
|
Project No.:
|
04I1D
|
Project Name: |
UW PLT New Engineering Building
|
Institution: |
UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
|
Location: |
CITY OF PLATTEVILLE, Wisconsin
|
Construction Cost: |
$21,373,000
|
AE Submittal Date: |
6/7/2005 |
Last Item Update: |
8/10/2005 9:07:31 AM |
AE Shortlist: |
CONTINUUM ARCHITECTS & PLANNERS, S.C. in joint venture with ROSS BARNEY+JANKOWSKI, INC., FLAD & ASSOCIATES, RIVER ARCHITECTS in association with HDR ARCHITECTURE, INC., WELMAN ARCHITECTS, INC. in association with VOA ASSOCIATES, INC. |
Selected AE: |
RIVER ARCHITECTS in association with HDR ARCHITECTURE, INC. |
|
Project No.:
|
04K1M
|
Project Name: |
Student Union Expansion & Admissions Cnt
|
Institution: |
UNIVERSITY OF WISCONSIN/PARKSIDE CAMPUS
|
Location: |
CITY OF KENOSHA, Wisconsin
|
Construction Cost: |
$18,836,000
|
AE Submittal Date: |
3/15/2005 |
Last Item Update: |
5/10/2005 4:24:19 PM |
AE Shortlist: |
BWZ ARCHITECTS in association with VASILKO. HAUSERMAN & ASSOCIATES, INC., PERFORMA INC. in association with ELLERBE BECKET, KAHLER SLATER ARCHITECTS in association with WTW ARCHITECTS. BARRIENTOS DESIGN & CONSULTING, LLC in association with DESIGN PARTNERSHIP OF CAMBRIDGE |
Selected AE: |
KAHLER SLATER ARCHITECTS in association with WTW ARCHITECTS |
|
Project No.:
|
04L1E
|
Project Name: |
UWSP Air Pollution Control Project
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$15,050,000
|
AE Submittal Date: |
3/14/2005 |
Last Item Update: |
5/10/2005 4:24:39 PM |
AE Shortlist: |
HENNEMAN RAUFEISEN & ASSOCIATES, INC. ,OMNNI ASSOCIATES INC., PCI MANAGEMENT & CONSULTING CO, RAASCH ASSOCIATES, INC. |
Selected AE: |
RAASCH ASSOCIATES, INC. |
|
Project No.:
|
03D1Q
|
Project Name: |
UW WW College of Business & Economics
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
Construction Cost: |
$30,873,000
|
AE Submittal Date: |
3/8/2005 |
Last Item Update: |
5/10/2005 4:25:08 PM |
AE Shortlist: |
WELMAN ARCHITECTS, INC. in association with VOA ASSOCIATES, INC., PERFORMA INC. in association with ELLERBE BECKET, ANGUS YOUNG ASSOCIATES INC. in association with BURT HILL KOSAR RITTELMAN ASSOCIATES, KAHLER SLATER ARCHITECTS |
Selected AE: |
KAHLER SLATER ARCHITECTS |
|
Project No.:
|
04H3L
|
Project Name: |
Waisman Ctr 6th 7th Floor Renov
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$4,522,000
|
AE Submittal Date: |
1/24/2005 |
Last Item Update: |
3/18/2005 3:30:52 PM |
AE Shortlist: |
THE DURRANT GROUP in association with HARLEYELLIS, BERNERS-SCHOBER ASSOCIATES, INC., POTTER LAWSON, INC., STRANG, INC. |
Selected AE: |
STRANG, INC. |
|
Project No.:
|
00L1B
|
Project Name: |
UW PLT Ullsvik Ctr Remodeling & Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
|
Location: |
CITY OF PLATTEVILLE, Wisconsin
|
Construction Cost: |
$17,404,000
|
AE Submittal Date: |
12/29/2004 |
Last Item Update: |
3/18/2005 3:30:12 PM |
AE Shortlist: |
CONTINUUM ARCHITECTS & PLANNERS, S.C., ANGUS YOUNG ASSOCIATES, INC., ISTHMUS ARCHITECTURE, INC., EPPSTEIN UHEN ARCHITECTS |
Selected AE: |
EPPSTEIN UHEN ARCHITECTS |
|
Project No.:
|
04B3F
|
Project Name: |
UW MSN 21st Century Telecom, Phase I
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$3,333,550
|
AE Submittal Date: |
11/15/2004 |
Last Item Update: |
2/1/2005 11:19:36 AM |
AE Shortlist: |
TOKI & ASSOCIATES, INC. in association with INTELLIGENT NETWORK SOLUTIONS, CAMP, DRESSER & McKEE, INC. (Milwaukee, WI; St. Paul, MN; Walnut Creek, CA; Pittsburgh, PA; Chicago, IL), ARNOLD & O'SHERIDAN, INC., KJWW ENGINEERING CONSULTANTS |
Selected AE: |
TOKI & ASSOCIATES, INC. in association with INTELLIGENT NETWORK SOLUTIONS |
|
Project No.:
|
02K2U
|
Project Name: |
Stevens Point, University Ctr Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$14,482,000
|
AE Submittal Date: |
8/25/2004 |
Last Item Update: |
10/8/2004 10:19:25 AM |
AE Shortlist: |
Continuum Architects & Planners, S.C in joint venture with Dagit/Saylor Architects, Kahler Slater Architects in association with Mackey Mitchell Architects, Workshop Architects, Inc., SDS Architects, Inc. in association with Perkins & Will |
Selected AE: |
SDS Architects, Inc. in association with Perkins & Will |
|
Project No.:
|
04D1I
|
Project Name: |
UW MSN Fredric A Ogg Residence Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$28,228,500
|
AE Submittal Date: |
5/14/2004 |
Last Item Update: |
4/20/2005 10:28:06 AM |
AE Shortlist: |
UIHLEIN/WILSON ARCHITECTS, INC. in association with BOOTH HANSEN, ENGBERG ANDERSON DESIGN PARTNERSHIP, INC. in association with SOLOMON CORDWELL BUENZ & ASSOCIATES, INC., POTTER LAWSON, INC. in association with ANTUNOVICH ASSOCIATES, EPPSTEIN UHEN ARCHITECTS |
Selected AE: |
UIHLEIN/WILSON ARCHITECTS, INC. in association with BOOTH HANSEN |
|
Project No.:
|
04A1W
|
Project Name: |
UW MSN Central Campus Utility Imprv
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$10,029,000
|
AE Submittal Date: |
5/6/2004 |
Last Item Update: |
7/2/2004 1:42:00 PM |
AE Shortlist: |
HARWOOD ENGINEERING CONSULTANTS, LTD. IN ASSOCIATION WITH RMF ENGINEERING, INC., AFFILIATED ENGINEERS, INC., HENNEMAN, RAUFEISEN & ASSOCIATES, INC., RING & DuCHATEAU, INC. |
Selected AE: |
RING & DuCHATEAU, INC. |
|
Project No.:
|
03I1F
|
Project Name: |
Wild Rose Design Report
|
Institution: |
NATURAL RESOURCES/WILD ROSE HATCHERY
|
Location: |
TOWN OF ROSE, Wisconsin
|
Construction Cost: |
$20,051,700
|
AE Submittal Date: |
4/27/2004 |
Last Item Update: |
7/2/2004 10:56:30 AM |
AE Shortlist: |
Graef, Anhalt, Schloemer & Associates, Inc. in association with Tetra Tech KCM and Tetra Tech KCM, Triad Engineering Incorporated (TEI) in association with Tetra Tech/KCM, Liesch Environmental Services, Inc. in association with Liesch Associates, Inc. and FishPro |
Selected AE: |
Liesch Environmental Services, Inc. in association with Liesch Associates, Inc. and FishPro |
|
Project No.:
|
03H3J
|
Project Name: |
DMA Camp Douglas Readiness Center
|
Institution: |
ADMINISTRATION/
|
Location: |
VILLAGE OF CAMP DOUGLAS, Wisconsin
|
Construction Cost: |
$5,396,000
|
AE Submittal Date: |
4/16/2004 |
Last Item Update: |
7/2/2004 10:55:25 AM |
AE Shortlist: |
HSR ASSOCIATES, INC., BARRIENTOS DESIGN & CONSULTING, LLC. ARCHITECTS GROUP LIMITED, FISCHER-FISCHER-THEIS, INC |
Selected AE: |
FISCHER-FISCHER-THEIS, INC |
|
Project No.:
|
03D1R
|
Project Name: |
Phoenix Sports Exp and Remodel
|
Institution: |
UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
|
Location: |
CITY OF GREEN BAY, Wisconsin
|
Construction Cost: |
$23,802,000
|
AE Submittal Date: |
2/10/2004 |
Last Item Update: |
3/29/2004 3:27:35 PM |
AE Shortlist: |
Venture Architects in association with Moody Nolan, Inc., Uihlein/Wilson Architects, Inc. in association with RDG Planning and Design, Berners-Schober Associates, Inc. in association with Rossetti, Potter Lawson Inc in association with Ellerbe Becket |
Selected AE: |
Venture Architects in association with Moody Nolan, Inc. |
|
Project No.:
|
03G1C
|
Project Name: |
UWO Student Rec and Wellness Center
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$16,133,000
|
AE Submittal Date: |
12/15/2003 |
Last Item Update: |
2/20/2004 10:11:54 AM |
AE Shortlist: |
Hammel, Green & Abrahamson, Inc., Uihlein/Wilson Architects, Inc. in association with RDG Planning and Design, Bray Associate Architects, Inc. in association with Hastings+Chivetta Architects, Inc., Potter Lawson, Inc. in association with Cannon Design |
Selected AE: |
Potter Lawson, Inc. in association with Cannon Design |
|
Project No.:
|
03H2L
|
Project Name: |
UW WW Connor Center Add & Remodeling
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
Construction Cost: |
$5,638,000
|
AE Submittal Date: |
12/12/2003 |
Last Item Update: |
2/20/2004 10:11:16 AM |
AE Shortlist: |
KEE Architecture, Inc., Potter Lawson, Inc., BWZ Architects in joint venture with Vasilko.Hauserman & Associates, Inc., Workshop Architects, Inc. |
Selected AE: |
Workshop Architects, Inc. |
|
Project No.:
|
02G1S
|
Project Name: |
UW MSN Interdiscip Research Complex
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$133,991,954
|
AE Submittal Date: |
12/12/2003 |
Last Item Update: |
9/19/2005 4:43:16 PM |
AE Shortlist: |
EPPSTEIN UHEN ARCHITECTS in association with NBBJ , KAHLER SLATER ARCHITECTS, INC. in association with DAVIS BRODY BOND, POTTER LAWSON, INC. in association with ZIMMER GUNSUL FRASCA PARTNERSHIP, FLAD & ASSOCIATES, UIHLEIN/WILSON ARCHITECTS, INC. in joint venture with BALLINGER, ZIMMERMAN DESIGN GROUP, INC. in association with HOK, Inc. |
Selected AE: |
ZIMMERMAN DESIGN GROUP, INC. in association with HOK, Inc. |
|
Project No.:
|
02G3H
|
Project Name: |
UW LX New Residence Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/LA CROSSE CAMPUS
|
Location: |
CITY OF LA CROSSE, Wisconsin
|
Construction Cost: |
$17,723,000
|
AE Submittal Date: |
7/23/2003 |
Last Item Update: |
11/12/2008 8:53:02 AM |
AE Shortlist: |
Wenzler Architects, KEE Architecture, Inc. in association with Mackey Mitchell Associates, HSR Associates, Inc., Eppstein Uhen Architects |
Selected AE: |
Eppstein Uhen Architects, Inc. |
|
Project No.:
|
02I3F
|
Project Name: |
UWO Taylor Residence Hall Renov
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$3,480,000
|
AE Submittal Date: |
5/13/2003 |
Last Item Update: |
7/23/2003 3:50:58 PM |
AE Shortlist: |
EPPSTEIN UHEN ARCHITECTS, HGM ARCHITECTS, INC. in association with SOLOMON CORDWELL BUENZ & ASSOCIATES, INC., MILLER WAGNER COENEN/McMAHON, INC., UIHLEIN/WILSON ARCHITECTS, INC. |
Selected AE: |
UIHLEIN/WILSON ARCHITECTS, INC. |
|
Project No.:
|
00I2A
|
Project Name: |
DMA Constr US Property & Fiscal Office
|
Institution: |
MILITARY AFFAIRS/CAMP WILLIAMS
|
Location: |
VILLAGE OF CAMP DOUGLAS, Wisconsin
|
Construction Cost: |
$11,053,100
|
AE Submittal Date: |
6/13/2002 |
Last Item Update: |
8/20/2002 11:26:16 AM |
AE Shortlist: |
HSR Associates, Inc., Zimmerman Design Group, Inc., Strang, Inc., Potter Lawson, Inc. |
Selected AE: |
Potter Lawson, Inc. |
|
Project No.:
|
00D1T
|
Project Name: |
New North Campus Res Hall Master Plan
|
Institution: |
UNIVERSITY OF WISCONSIN/STOUT CAMPUS
|
Location: |
TOWN OF MENOMINEE, Wisconsin
|
Construction Cost: |
$12,335,000
|
AE Submittal Date: |
6/12/2002 |
Last Item Update: |
8/20/2002 11:24:53 AM |
AE Shortlist: |
Potter Lawson, Inc., Cedar Corporation in association with Mackey Mitchell Associates, SDS Architects, Inc. in association with Elness Swenson Graham Architects, Inc., Wenzler Architects |
Selected AE: |
SDS Architects, Inc. in association with Elness Swenson Graham Architects, Inc. |
|
Project No.:
|
02C2M
|
Project Name: |
UW PLT Ullrich Hall Renov
|
Institution: |
UNIVERSITY OF WISCONSIN/PLATTEVILLE CAMPUS
|
Location: |
CITY OF PLATTEVILLE, Wisconsin
|
Construction Cost: |
$4,483,000
|
AE Submittal Date: |
5/30/2002 |
Last Item Update: |
7/23/2002 10:27:47 AM |
AE Shortlist: |
HSR Associates, Inc., SDS Architects, Inc., River Architects, The Durrant Group |
Selected AE: |
River Architects |
|
Project No.:
|
01L4P
|
Project Name: |
Charter St. Boilers (104) Overhaul & Rep
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$2,270,000
|
AE Submittal Date: |
5/24/2002 |
Last Item Update: |
8/20/2002 11:23:55 AM |
AE Shortlist: |
TC Group, Inc., Raasch Associates, Inc., Henneman Jaspal Engineering Services in association with SEGA, Inc., Jacobs – Green Bay Operations |
Selected AE: |
TC Group, Inc. |
|
Project No.:
|
02A4U
|
Project Name: |
DOC WPN North Cell Hall Plbg Fxt Replace
|
Institution: |
CORRECTIONS/WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
|
Location: |
CITY OF WAUPUN, Wisconsin
|
Construction Cost: |
$2,080,000
|
AE Submittal Date: |
4/15/2002 |
Last Item Update: |
7/23/2002 11:01:01 AM |
AE Shortlist: |
Harwood Engineering Consultants, Ltd., Henneman Jaspal Engineering Services, PSJ Engineering Inc., The Durrant Group |
Selected AE: |
PSJ Engineering Inc. |
|
Project No.:
|
00J3Q
|
Project Name: |
DOC New Health Service - Oakhill
|
Institution: |
CORRECTIONS/OAKHILL CORRECTIONAL INSTITUTION, OREGON
|
Location: |
TOWN OF OREGON, Wisconsin
|
Construction Cost: |
$2,249,100
|
AE Submittal Date: |
4/8/2002 |
Last Item Update: |
7/31/2002 10:03:41 AM |
AE Shortlist: |
Bray Associate Architects, Inc., Somerville, Inc., The Durrant Group, Venture Architects |
Selected AE: |
Venture Architects |
|
Project No.:
|
99J3O
|
Project Name: |
UWMIL Lapham North Wing Remodeling
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$7,210,000
|
AE Submittal Date: |
3/28/2002 |
Last Item Update: |
7/23/2002 10:04:33 AM |
AE Shortlist: |
Continuum Architects + Planners, S.C., HSR Associates, Inc., The Durrant Group in association with HarleyEllis, Zimmerman Design Group, Inc. |
Selected AE: |
Continuum Architects + Planners, S.C. |
|
Project No.:
|
00H2W
|
Project Name: |
Gruenhagen Hall Fire Sprinkler Systems
|
Institution: |
UNIVERSITY OF WISCONSIN/OSHKOSH CAMPUS
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$2,860,000
|
AE Submittal Date: |
3/28/2002 |
Last Item Update: |
6/3/2002 5:09:44 PM |
AE Shortlist: |
Arnold & O’Sheridan, Inc., Berners Schober Associates, Inc., PSJ Engineering, Inc., Toki & Associates, Inc., in joint venture with Gage-Babcock & Associates, Inc. |
Selected AE: |
PSJ Engineering, Inc. |
|
Project No.:
|
02A3T
|
Project Name: |
Horicon Marsh International Education Ce
|
Institution: |
NATURAL RESOURCES/HORICON WILDLIFE AREA
|
Location: |
CITY OF HORICON, Wisconsin
|
Construction Cost: |
$2,060,000
|
AE Submittal Date: |
3/25/2002 |
Last Item Update: |
6/7/2002 8:12:06 AM |
AE Shortlist: |
Mayo Corporation, Somerville, Inc., The Durrant Group, The Kubala Washatko Architects, Inc. |
Selected AE: |
Mayo Corporation |
|
Project No.:
|
00H2D
|
Project Name: |
Cemetery Planning
|
Institution: |
VETERANS AFFAIRS/WISCONSIN VETERANS HOME-KING
|
Location: |
Wisconsin
|
Construction Cost: |
$5,204,400
|
AE Submittal Date: |
3/22/2002 |
Last Item Update: |
6/3/2002 8:50:21 AM |
AE Shortlist: |
Central Wisconsin Engineers & Architects, Inc. in association with VOA Associates, Inc., Strand Associates, Inc. in association with Carter and Burgess, Inc., Toki & Associates, Inc. in joint venture with Rae R. Reuss & Associates, Inc., Tribute Design Systems, Inc. |
Selected AE: |
Strand Associates, Inc. in association with Carter and Burgess, Inc. |
|
Project No.:
|
02A3W
|
Project Name: |
UW MDN ResHallsMaint Cole,Sull,Brad,Ogg
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$4,342,314
|
AE Submittal Date: |
2/18/2002 |
Last Item Update: |
4/26/2002 10:19:56 AM |
AE Shortlist: |
Arnold & O'Sheridan, Barrientos Design & Consulting, LLC., HSR Associates, Inc., Somerville, Inc. |
Selected AE: |
HSR Associates, Inc. |
|
Project No.:
|
00J3P
|
Project Name: |
Mech Engineering Add & Remode
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$25,800,000
|
AE Submittal Date: |
1/22/2002 |
Last Item Update: |
3/6/2002 4:50:16 PM |
AE Shortlist: |
Kahler Slater Architects, Renner Architects, Uihlein/Wilson Architects in joint venture with Ballinger, The Zimmerman Design Group |
Selected AE: |
Zimmerman Design Group, Inc. |
|
Project No.:
|
00K4A
|
Project Name: |
UW MSN Microbial Sciences Building
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$78,668,000
|
AE Submittal Date: |
11/19/2001 |
Last Item Update: |
2/22/2002 2:51:24 PM |
AE Shortlist: |
Hammel, Green & Abrahamson, Inc. in assoc. Earl Walls Assoc.; HSR Associates, Inc. in assoc CUH2A; Kahler Slater Architects in assoc Davis Brody Bond, LLC; Plunkett Raysich Architects in assoc Anshen+Allen LA; Potter Lawson, Inc. in assoc Flad & Assoc., Inc.; Zimmerman Design Group in assoc Ellenzweig Assoc., Inc. |
Selected AE: |
Plunkett Raysich Architects in assoc Anshen+Allen LA |
|
Project No.:
|
01I1P
|
Project Name: |
Advanced Food Production Additions and R
|
Institution: |
VETERANS AFFAIRS/WISCONSIN VETERANS HOME-KING
|
Location: |
TOWN OF WAUPACA, Wisconsin
|
Construction Cost: |
$918,100
|
AE Submittal Date: |
10/23/2001 |
Last Item Update: |
1/4/2002 2:05:27 PM |
AE Shortlist: |
Architects Group Limited, Central Wisconsin Engineers & Architects, Henneman-Jaspal Engineering Services, Marathon Engineers/Architects/Planners, LLC |
Selected AE: |
Central Wisconsin Engineers & Architects |
|
Project No.:
|
00B3T
|
Project Name: |
DOC FLCI Infrastructure Improve
|
Institution: |
CORRECTIONS/FOX LAKE CORRECTIONAL INSTITUTION, FOX LAKE
|
Location: |
TOWN OF FOX LAKE, Wisconsin
|
Construction Cost: |
$16,000,000
|
AE Submittal Date: |
9/24/2001 |
Last Item Update: |
11/19/2001 4:49:50 PM |
AE Shortlist: |
Bray Associate Architects, Inc. in association with C.G. Smith Construction, Inc.; DLR Group; The Durrant Group; PTD, Inc. in association with Marathon Engineers/Architects/Planners, LLC. |
Selected AE: |
The Durrant Group |
|
Project No.:
|
01C1T
|
Project Name: |
UW MSN Crew House
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$6,176,000
|
AE Submittal Date: |
4/4/2001 |
Last Item Update: |
2/28/2002 8:35:36 AM |
AE Shortlist: |
Isthmus Architecture, Inc. in association with Turner Brooks Architects, KEE Architecture, Inc. in association with Vincent James Associates, Hammel, Green & Abrahamson, Inc., Graef, Anhalt, Schloemer & Associates, Inc. in association with Engberg Anderson Design Partnership, Inc. |
Selected AE: |
KEE Architecture, Inc. in association with Vincent James Associates |
|
Project No.:
|
00K1C
|
Project Name: |
UWMAD Weeks Hall Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$5,000,000
|
AE Submittal Date: |
4/4/2001 |
Last Item Update: |
6/12/2001 11:58:28 AM |
AE Shortlist: |
HSR Associates, Inc., Strang, Inc., Zimmerman Design Group, Inc., Toki & Associates, Inc. in association with Gensler Associates Architects |
Selected AE: |
HSR Associates, Inc. |
|
Project No.:
|
00F1Q
|
Project Name: |
Superior, Aquaculture Facility
|
Institution: |
UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
|
Location: |
CITY OF SUPERIOR, Wisconsin
|
Construction Cost: |
$2,600,000
|
AE Submittal Date: |
1/17/2001 |
Last Item Update: |
3/19/2001 2:27:24 PM |
AE Shortlist: |
Short Elliott Hendrickson, Inc., G.W. Kortness Associates, Inc. in association with Cooper Engineering Co. Inc. , Louis Wasserman & Associates in association with MSA Professional Services, Inc. |
Selected AE: |
Short Elliott Hendrickson, Inc. |
|
Project No.:
|
99J3M
|
Project Name: |
Chamberlin Hall Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$18,576,000
|
AE Submittal Date: |
11/15/2000 |
Last Item Update: |
1/7/2001 10:25:07 AM |
AE Shortlist: |
ZIMMERMAN DESIGN GROUP, INC.; STRANG, INC.; HSR ASSOCIATES, INC.; RENNER ARCHITECTS |
Selected AE: |
RENNER ARCHITECTS |
|
Project No.:
|
00F2G
|
Project Name: |
DVA Skilled Nursing Facility
|
Institution: |
VETERANS AFFAIRS/WISCONSIN VETERANS HOME-UNION GROVE
|
Location: |
VILLAGE OF UNION GROVE, Wisconsin
|
Construction Cost: |
$13,647,800
|
AE Submittal Date: |
11/7/2000 |
Last Item Update: |
10/27/2005 4:39:18 PM |
AE Shortlist: |
Engberg Anderson Design Partnership in association with Nelson Tremain Partnership, P.A.; Wenzler Architects; Balestrieri-Kehoe & Associates, Inc. in joint venture with Wilmot/Sanz, Inc.; Zimmerman Design Group, Inc. |
Selected AE: |
Engberg Anderson Design Partnership in association with Nelson Tremain Partnership |
|
Project No.:
|
00F2C
|
Project Name: |
Meat/Muscle Science Lab Replacement
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$12,600,000
|
AE Submittal Date: |
11/7/2000 |
Last Item Update: |
1/18/2001 9:44:10 AM |
AE Shortlist: |
KJWW ENGINEERING CONSULTANTS; ZIMMERMAN DESIGN GROUP, INC.; MEAD & HUNT, INC.; WENZLER ARCHITECTS |
Selected AE: |
KJWW ENGINEERING CONSULTANTS |
|
Project No.:
|
99K3Y
|
Project Name: |
DOA New Crime Laboratory 2001-03 enum
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$8,378,000
|
AE Submittal Date: |
10/11/2000 |
Last Item Update: |
12/14/2000 10:44:21 AM |
AE Shortlist: |
BHS Architects, Inc. in association with Affiliated Engineers, Inc.; HSR Associates, Inc. in association with CUH2A, Inc. ; Strang, Inc.; The Durrant Group in association with McClaren, Wilson & Lawrie, Inc. |
Selected AE: |
BHS Architects, Inc. in association with Affiliated Engineers, Inc |
|
Project No.:
|
00F1O
|
Project Name: |
NORTHEAST REGIONAL HEADQUARTERS FACILITY
|
Institution: |
NATURAL RESOURCES/NORTHEASTERN REGIONAL OFFICE
|
Location: |
VILLAGE OF HOWARD, Wisconsin
|
Construction Cost: |
$3,900,000
|
AE Submittal Date: |
9/20/2000 |
Last Item Update: |
11/27/2000 11:16:51 AM |
AE Shortlist: |
Berners-Schobers Associates, Strang, Inc., Architects Group, Ltd., Raasch Associates, Inc. |
Selected AE: |
Berners-Schober Associates, Inc. |
|
Project No.:
|
99J3S
|
Project Name: |
UWW Upham Science Addition/Renovation
|
Institution: |
UNIVERSITY OF WISCONSIN/WHITEWATER CAMPUS
|
Location: |
CITY OF WHITEWATER, Wisconsin
|
Construction Cost: |
$16,500,000
|
AE Submittal Date: |
8/16/2000 |
Last Item Update: |
10/25/2000 3:53:59 PM |
AE Shortlist: |
Renner Architects, Plunkett Raysich Architects in association with Earl Walls Associates, Uihlein/Wilson Architects, Inc. in joint venture with Ballinger, HSR Associates, Inc. in association with Ellerbe Becket |
Selected AE: |
Uihlein/Wilson Architects, Inc. in joint venture with Ballinger |
|
Project No.:
|
99K4N
|
Project Name: |
River Falls, New Residence Hall
|
Institution: |
UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
|
Location: |
CITY OF RIVER FALLS, Wisconsin
|
Construction Cost: |
$8,965,000
|
AE Submittal Date: |
8/16/2000 |
Last Item Update: |
10/6/2000 10:34:09 AM |
AE Shortlist: |
Zimmerman Design Group, Inc.; DLR Group, Wenzler Architects, HSR Associates, Inc. |
Selected AE: |
Wenzler Architects |
|
Project No.:
|
00G2V
|
Project Name: |
River Falls, Student Union
|
Institution: |
UNIVERSITY OF WISCONSIN/RIVER FALLS CAMPUS
|
Location: |
CITY OF RIVER FALLS, Wisconsin
|
Construction Cost: |
$20,350,000
|
AE Submittal Date: |
8/16/2000 |
Last Item Update: |
10/6/2000 10:33:38 AM |
AE Shortlist: |
Berners Schober Associates, Workshop Architects, Inc. in association with Moody/Nolan, Ltd. Inc.; HSR Associates, Inc. in association with Ellerbe Becket, Inc.; SDS Architects, Inc. |
Selected AE: |
Workshop Architects, Inc. in association with Moody/Nolan, Ltd. Inc. |
|
Project No.:
|
00C5A
|
Project Name: |
UW MSN Biotechnology Building Addition
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$27,000,000
|
AE Submittal Date: |
8/2/2000 |
Last Item Update: |
9/20/2000 3:04:46 PM |
AE Shortlist: |
HSR Associates, Inc. in association with CUH2A, Inc.; Potter Lawson, Inc. in association with GPR Planners Collaborative, Inc.; Zimmerman Design Group in association with Research Facilities Design; Hammel, Green & Abahamson, Inc. |
Selected AE: |
Potter Lawson, Inc. in association with GPR Planners Collaborative, Inc. |
|
Project No.:
|
99J3R
|
Project Name: |
Superior, Gates Phy Ed Addition/Remodel
|
Institution: |
UNIVERSITY OF WISCONSIN/SUPERIOR CAMPUS
|
Location: |
CITY OF SUPERIOR, Wisconsin
|
Construction Cost: |
$14,088,000
|
AE Submittal Date: |
8/2/2000 |
Last Item Update: |
9/7/2000 3:25:01 PM |
AE Shortlist: |
Berners Schober Associates; Somerville, Inc. in association with GW Korness & Associates, Inc.; SDS Architects, Inc.; HSR Associates, Inc., in association with RDG Bussard Dikis |
Selected AE: |
SDS Architects, Inc. |
|
Project No.:
|
00F3O
|
Project Name: |
DOA Info Tech Second Site Computer Fac
|
Institution: |
ADMINISTRATION/ADMINISTRATIVE FACILITIES
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$4,630,000
|
AE Submittal Date: |
7/11/2000 |
Last Item Update: |
4/7/2005 2:12:56 PM |
AE Shortlist: |
Affiliated Engineers, Inc.; Arnold & O’Sheridan, Inc.; Grumman Butkus Associates, Durrant Engineers, Inc. |
Selected AE: |
Arnold & O'Sheridan, Inc. |
|
Project No.:
|
00E2F
|
Project Name: |
New Exposition Building
|
Institution: |
STATE FAIR PARK/STATE FAIR PARK - WEST ALLIS
|
Location: |
CITY OF WEST ALLIS, Wisconsin
|
Construction Cost: |
|
AE Submittal Date: |
6/14/2000 |
Last Item Update: |
7/21/2000 1:14:08 PM |
AE Shortlist: |
Renner Architects in association with Bullock, Smith & Partners; Eppstein Uhen Architects in association with RTKL; Durrant Architects in association with Convention Center Design Group; Zimmerman Design Group in association with HOK |
Selected AE: |
Eppstein Uhen Architects in association with RTKL |
|
Project No.:
|
00C4L
|
Project Name: |
UW MSN WI Veterinary Diagnostic Lab
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
|
AE Submittal Date: |
6/14/2000 |
Last Item Update: |
8/3/2000 4:06:59 PM |
AE Shortlist: |
HSR Associates, Inc. in association with CUH2A, Inc.; Zimmerman Design Group, Inc. in association with Research Facilities Design; Potter Lawson Inc., in association with HLM Design; Strang Inc. |
Selected AE: |
Strang, Inc. |
|
Project No.:
|
00D2A
|
Project Name: |
Veterinary Med Teaching Hospital
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$3,200,000
|
AE Submittal Date: |
6/14/2000 |
Last Item Update: |
8/2/2000 5:04:23 PM |
Selected AE: |
Zimmerman Design Group |
|
Project No.:
|
99J3N
|
Project Name: |
UWMIL Klotsche Ctr PE Add Remodel Pkg
|
Institution: |
UNIVERSITY OF WISCONSIN/MILWAUKEE CAMPUS
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$19,800,000
|
AE Submittal Date: |
5/24/2000 |
Last Item Update: |
7/6/2000 1:46:06 PM |
AE Shortlist: |
Workshop Architects, Inc., Venture Architects, Uihlein/Wilson Architects, Inc. |
Selected AE: |
Venture Architects in association with HOK Sports Facilities |
|
Project No.:
|
00B5K
|
Project Name: |
DNR Building Addition & Remodeling
|
Institution: |
NATURAL RESOURCES/SOUTH CENTRAL REGIONAL OFFICE
|
Location: |
CITY OF FITCHBURG, Wisconsin
|
Construction Cost: |
$3,140,000
|
AE Submittal Date: |
5/10/2000 |
Last Item Update: |
8/4/2000 1:58:50 PM |
AE Shortlist: |
Bray Associates, Inc.; Fischer-Fischer-Theis, Inc.; HSR Associates, Inc.; Plunkett Raysich Architects |
Selected AE: |
Fischer-Fischer-Theis, Inc. |
|
Project No.:
|
00B6B
|
Project Name: |
New Facility OMS #10
|
Institution: |
MILITARY AFFAIRS/OSHKOSH
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$4,223,200
|
AE Submittal Date: |
5/10/2000 |
Last Item Update: |
6/21/2000 10:39:45 AM |
AE Shortlist: |
Fischer-Fischer-Theis, Inc.; Graef Anhalt Schloemer & Assoc., Inc.; HSR Assoc., Inc.; Short Elliott Hendrickson, Inc. |
Selected AE: |
HSR Associates, Inc. |
|
Project No.:
|
99K4R
|
Project Name: |
Add 50 Cells
|
Institution: |
CORRECTIONS/OSHKOSH CORRECTIONAL INSTITUTION, OSHKOSH
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$4,189,500
|
AE Submittal Date: |
5/3/2000 |
Last Item Update: |
6/13/2000 9:09:29 AM |
AE Shortlist: |
DLR Group, Durrant Architects, Potter Lawson, Inc.; Venture Architects |
Selected AE: |
Potter Lawson, Inc. |
|
Project No.:
|
99L6Q
|
Project Name: |
DACC Repl Windows / Upgrd HVAC Sys
|
Institution: |
CORRECTIONS/DRUG ABUSE CORRECTIONAL CENTER, WINNEBAGO
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$5,360,000
|
AE Submittal Date: |
5/3/2000 |
Last Item Update: |
6/13/2000 10:01:24 AM |
AE Shortlist: |
Balestrieri-Kehoe & Assoc., Inc.; DLR Group, PTD, Inc. |
Selected AE: |
Balestrieri-Kehoe & Assoc., Inc. |
|
Project No.:
|
00B6J
|
Project Name: |
DVA New Domiciliary Building
|
Institution: |
VETERANS AFFAIRS/WISCONSIN VETERANS HOME-UNION GROVE
|
Location: |
VILLAGE OF UNION GROVE, Wisconsin
|
Construction Cost: |
$3,000,000
|
AE Submittal Date: |
4/12/2000 |
Last Item Update: |
6/12/2000 7:36:58 AM |
AE Shortlist: |
Plunkett Raysich Architects, HSR Associates, Inc., Zimmerman Design Group, Inc., Hammel, Green & Abrahamson, Inc. |
Selected AE: |
Plunkett Raysich Architects |
|
Project No.:
|
00A4V
|
Project Name: |
Lakeshore State Park
|
Institution: |
NATURAL RESOURCES/Lakeshore State Park
|
Location: |
CITY OF MILWAUKEE, Wisconsin
|
Construction Cost: |
$9,000,000
|
AE Submittal Date: |
4/3/2000 |
Last Item Update: |
5/2/2000 2:58:49 PM |
Selected AE: |
JJR, Incorporated |
|
Project No.:
|
99J3L
|
Project Name: |
UWGB Lab Sciences Addition & Rmdl
|
Institution: |
UNIVERSITY OF WISCONSIN/GREEN BAY CAMPUS
|
Location: |
CITY OF GREEN BAY, Wisconsin
|
Construction Cost: |
$16,600,000
|
AE Submittal Date: |
3/29/2000 |
Last Item Update: |
5/17/2000 5:12:50 PM |
AE Shortlist: |
Uihlein Wilson Architects Inc. in joint venture with Ballinger, Zimmerman Design Group,Inc., Berners Schober Assoc., Inc., Plunkett Raysich Architects |
Selected AE: |
Plunkett Raysich Architects |
|
Project No.:
|
99J1C
|
Project Name: |
Fine Arts Center Addition and Remodeling
|
Institution: |
UNIVERSITY OF WISCONSIN/STEVENS POINT CAMPUS
|
Location: |
CITY OF STEVENS POINT, Wisconsin
|
Construction Cost: |
$21,557,000
|
AE Submittal Date: |
3/22/2000 |
Last Item Update: |
5/2/2000 1:30:16 PM |
Selected AE: |
Hammel, Green & Abrahamson, Inc. |
|
Project No.:
|
99L6M
|
Project Name: |
Remodel Cottages 1 and 12
|
Institution: |
CORRECTIONS/OAKHILL CORRECTIONAL INSTITUTION, OREGON
|
Location: |
Wisconsin
|
Construction Cost: |
$3,553,000
|
AE Submittal Date: |
3/22/2000 |
Last Item Update: |
5/2/2000 3:31:05 PM |
Selected AE: |
PTD, Inc. |
|
Project No.:
|
00A1U
|
Project Name: |
SFP Replace Grandstand
|
Institution: |
STATE FAIR PARK/STATE FAIR PARK - WEST ALLIS
|
Location: |
CITY OF WEST ALLIS, Wisconsin
|
Construction Cost: |
$12,500,000
|
AE Submittal Date: |
1/31/2000 |
Last Item Update: |
4/21/2000 3:50:41 PM |
Selected AE: |
Venture Architects |
|
Project No.:
|
99I4U
|
Project Name: |
UW Mad. SE Recreation Facility
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$6,106,000
|
AE Submittal Date: |
12/7/1999 |
Last Item Update: |
4/21/2000 4:02:24 PM |
Selected AE: |
Bray Associate Architects, Inc. |
|
Project No.:
|
99I1F
|
Project Name: |
UWMad Witte A&B - Kronshage Hall Remodel
|
Institution: |
UNIVERSITY OF WISCONSIN/MADISON CAMPUS
|
Location: |
CITY OF MADISON, Wisconsin
|
Construction Cost: |
$8,288,500
|
AE Submittal Date: |
12/7/1999 |
Last Item Update: |
4/21/2000 3:49:17 PM |
Selected AE: |
Arnold & O'Sheridan, Madison, Wisconsin |
|
Project No.:
|
99H3E
|
Project Name: |
Segregation / Housing Unit
|
Institution: |
CORRECTIONS/TAYCHEEDAH CORRECTIONAL INSTITUTION
|
Location: |
TOWN OF TAYCHEEDAH, Wisconsin
|
Construction Cost: |
$15,843,800
|
AE Submittal Date: |
9/24/1999 |
Last Item Update: |
4/21/2000 3:26:58 PM |
Selected AE: |
Boldt Construction & Venture Architects |
|
Project No.:
|
99H3B
|
Project Name: |
DOC WCC 150 Bed Work House
|
Institution: |
CORRECTIONS/WINNEBAGO CORRECTION CENTER
|
Location: |
CITY OF OSHKOSH, Wisconsin
|
Construction Cost: |
$5,120,000
|
AE Submittal Date: |
9/23/1999 |
Last Item Update: |
4/21/2000 2:54:43 PM |
Selected AE: |
PTD, Inc. |
|
Project No.:
|
99H3D
|
Project Name: |
DOC VARIOUS Prob/Parole Hold Fac-4 Locat
|
Institution: |
CORRECTIONS/VARIOUS
|
Location: |
VILLAGE OF STURTEVANT, Wisconsin
|
Construction Cost: |
$22,789,000
|
AE Submittal Date: |
9/22/1999 |
Last Item Update: |
4/21/2000 3:23:27 PM |
Selected AE: |
Durrant Architects in association with Durrant Eng |
|
Project No.:
|
99I1Q
|
Project Name: |
DOC HIGH Correctional Institution
|
Institution: |
CORRECTIONS/GERIATRIC OFFENDER-NORTHERN WISCONSIN CENTER
|
Location: |
CITY OF CHIPPEWA FALLS, Wisconsin
|
Construction Cost: |
$7,294,000
|
AE Submittal Date: |
9/21/1999 |
Last Item Update: |
4/21/2000 3:28:49 PM |
Selected AE: |
PTD, Inc. |
|
Project No.:
|
99E2I
|
Project Name: |
DOC WCI Visitors Center Renovation
|
Institution: |
CORRECTIONS/WAUPUN CORRECTIONAL INSTITUTION, WAUPUN
|
Location: |
CITY OF WAUPUN, Wisconsin
|
Construction Cost: |
$7,604,900
|
AE Submittal Date: |
9/17/1999 |
Last Item Update: |
4/21/2000 2:59:46 PM |
Selected AE: |
Venture Architects |
|